=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:-_ _ | ||
~ | |||
, . . . | |||
. - | |||
. | |||
- | |||
OCT 2 81988 | |||
In Reply Refer To: 1 | |||
Docket: 50-458/88-18 | |||
Gulf States Utilities | |||
ATTN: - Mr. James C. Deddens [ | |||
SeniorVicePresident(RBNG) ! | |||
' | |||
P.O. Box 220 | |||
St. Francisville, Louisiana 70775 | |||
Gentlemen: | |||
Thank you for your letter of September 30, 1988, in response to our letter | |||
and the attached Notice of Violation dated September 1, 1988. As a result | |||
of our review, we find that additional information is needed, as discussed with | |||
your Mr. Rick J. King during a telephone call with our Messrs. W. Seidle and | |||
R. Azua on October 25, 1988. Specifically, in the area of "Corrective Steps. | |||
Which Will Be Taken To Avoid Further Violations " it was noted that corrective | |||
steps were not identified for Items B and C that would preclude recurrence of | |||
these events. In addition, the corrective steps described in the second | |||
paragraph of the same section failed to assure that supervisor of the appropriste | |||
discipline would be involved, as comitted to during the exit interview. | |||
Please provide the supplemental information within 30 days of the date of this | |||
letter. | |||
Sincerely, | |||
Original Simwo 3) | |||
11 L Calbn , | |||
l L. J. Callan, Director | |||
Division of Reactor Projects | |||
' | |||
cc: | |||
Gulf States Utilities ' | |||
ATTN: J. E. Booker, Manager- | |||
i River Bend Oversight !' | |||
l P.O. Box 2951 | |||
Beaumont, Texas 77704 | |||
' | |||
Gulf States Utilities | |||
ATTN: Les England, Director . | |||
Nuclear Licensing - RBNG ; | |||
P.O. Box 220 : | |||
St. Francisv111e, Louisiana 70775 l | |||
, | |||
Louisiana State University, | |||
l Goverreent Documents Department | |||
Louisiana Radiation Control Program Director . | |||
l | |||
D:DRS A D:DRPgN. | |||
RIV:R M RI C:TPS g | |||
LJCallan | |||
RAzua/1d HBundy g WCSeiIle JLMilhoan i | |||
w /tt/88 /r /s1/88 /ch7/88 /c // 7 /88 /0 hl/88 l | |||
f 8911070142 88102G | |||
ADOCKOS00g'g*G | |||
{DR : | |||
l | |||
,, ' - | |||
** | |||
. | |||
Gulf States Utilities -2- | |||
bec to DMB (IE01) | |||
bec distrib. by RIV: | |||
DRP RRI | |||
R. D. Martin, RA Section Chief (DRP/C) | |||
Lisa Shea, RM/ALF MIS System | |||
, | |||
RPB-DRSS RSTS Operator | |||
Project Engineer DRP/C RIV File | |||
W. Paulson, NRR Project Manager DRS | |||
R. Azua W. Seidle | |||
H. Bundy | |||
: | |||
J | |||
. . . | |||
9 | |||
,. | |||
,,,,, .,. | |||
. | |||
GULF STATES UTILITIES COMPANY | |||
mu .no sw a :st e we soi m se nuisme %s,.s4 r.n. | |||
. | |||
.j :SNJ LN[],[(#[ | |||
September 30, 1988 i ;> g | |||
RBG- 28911 ' | |||
OCT 51988 1 l | |||
File Nos. G9.5, G15.4.1 i j l | |||
U y | |||
. | |||
U. S. Nuclear Regulatory Comission | |||
Document Control Desk | |||
Washington, DC 20555 | |||
Gentlemen: | |||
RIVER 80I6 STATION - UN!T 1 | |||
REFER T0: REGT0h IV | |||
DOCKET NO. 50-458/ REP 6RT &-18 | |||
Pursuant to 10CFR2.201, this letter responds to the Notice of Violation - | |||
contained in NRC Inspection Report No. 50-458/88-18. The inspection was | |||
performed by Messrs. H. F. Bundy and R. V. Azua during the period August | |||
8-12, 1988 of activities authorized by NRC Operating License NPF-47 for | |||
River Bend Station - Unit 1. | |||
Gulf States Utilities Company's (GSU) response to Violation 8818-01, | |||
"Failure to Properly Evaluate and Document Surveillance Test Results." is | |||
provided in the attachment. | |||
Should you have any questions, please contact Mr. Rick J. King at (504) | |||
381-4146. | |||
Sincerely, | |||
f f. | |||
J. E. Booker | |||
s | |||
Manager-River Bend Oversight | |||
River Bend Nuclear Group | |||
Attachment , | |||
cc: U. S. Nuclear Regulatory Comission | |||
611 Ryan Plaza Drive, Suite 1000 | |||
Arlington, TX 76011 | |||
NRC Resident inspector | |||
P.O. Box 1051 | |||
St. Francisville, LA 70775 | |||
$0Y? 0 bY ? hl $ [ ,- & S %2 - - _ - _ - _ - _ _ _ | |||
1 | |||
, | |||
. | |||
. . | |||
** | |||
g ,.' g , | |||
. | |||
4 | |||
UNITED STATES OF AMERICA | |||
NUCLEAR REGULATORY COMMISSION | |||
$ | |||
STATE OF LOUISIANA | |||
$ | |||
$ | |||
PARISH OF WEST FELICIANA | |||
$ | |||
f Docke. No. 50-458 | |||
In the Matter of | |||
$ | |||
$ | |||
GULF STATES UTILITIES COMPANY | |||
$ | |||
(River Band Station f | |||
Unit 1) i | |||
AFFIDAVIT | |||
J. E. Booker, being duly sworn . .es that he is Manager-River Bend | |||
OversightforGulfStatesUtilitiesCompany;thatheisauthorizedonthe | |||
part of said Company to sign and file with the Nuclear Regulatory | |||
' | |||
Commission the documents attached hereto; theat he has read all of the | |||
statements contained in such documents attached thereto and made a part | |||
thereof; and that all such statements made and natters set forth therein | |||
are true and correct to the best of his knowledge, information and belief. | |||
.Vh | |||
4. E. Booker | |||
Subscribed and sworn to before me, a Notary Public in and for the State | |||
and Parish above named, this .3d day of 'an im . _. | |||
19N. | |||
. | |||
. | |||
% a $ | |||
N3fary Public in and for | |||
West Feliciana Parish. Louisiana | |||
My Commission is For Life. | |||
. | |||
h | |||
. | |||
' | |||
0,,.' 6' . | |||
, | |||
Attachment 1 | |||
Response to Notice of Violation 50-458/8818 01 | |||
Level IV | |||
REFERENCE | |||
Notice of Violation - Letter from L. J. Callan to J. C. Deddens, dated | |||
September 1, 1988. | |||
VIOLATION: FAILURE TO PROPERLY EVALUATE AND DOCWENT SURVEILLANCE TEST | |||
RE5 ULT 3 | |||
Title 10, Part 50, Appendix B, Criterion" XI, "Test Control," of the Code of | |||
Federal Regulations states, in part, . . . Test results shall be | |||
documented and evaluated to assure that test requirements have been | |||
satisfied." Criterion XI is implemented by RBS Quality Assurance Directive | |||
(QAD)-11, Revision 5. "Test Control." This Directive ilso requires that | |||
recorded data reveal the adequacy of the equipment of syster.c to meet the | |||
specified requirement in the acceptance criteria. Further implementation | |||
of these documents is provided by RBS adninistrative procedures (ADMs) as | |||
discussed below. Section 8.3.1 of ADM-0015 specifically disallows use of | |||
test exceptions when acceptance criteria cannot be met. Section 8.6 of | |||
ADM-0015 requires that all data, calculations, notes, etc., which are | |||
essential in proving the acceptability of s surveillance test procedure | |||
(STP), shall be recorded on the data line provided or attached to the | |||
procedure. | |||
Contrary to the above, the following failures were identified: | |||
A. Test data for STP-051-4210, completed on October 13, 1987, was | |||
incomplete in that page 24 of the 60-page procedure contained no test | |||
, | |||
data. This precluded ascertaining that the data had been properly | |||
documented and evaluated as required by 10CFR50, Appendix B, Criterion | |||
XI. | |||
. | |||
B. Test exceptions were written for performance of Sections 7.3.4. and | |||
" 5.4 of STP-402-0601, "Standby Gas Treatment System Annulus Mixing | |||
System Functional Tests." Writing test exceptions of an acceptance | |||
criter; n that cannot be met constituted a violation of Section J.3.1 | |||
of ADM-0013. Also, the adequacy of the system to meet the specified | |||
requirements in, the acceptance criteria was not revealed by the | |||
recorded data as rgquired by QAD-11. | |||
C. The data and calculation for the average stroke rate of Yalve | |||
1833-HYVF0 GOB timed in Step 7.4.12 of STP-053-0601, "Rectre Flow | |||
Control Valve Operability Test," were not included in the data package | |||
completed on October 24, 1981, as required by Section 8.6 of ADM-0015. | |||
t | |||
Page 1 of 3 | |||
l- | |||
- | |||
, 4 | |||
i | |||
e L O | |||
.-4 | |||
. | |||
REASON FOR THE VIOLATION | |||
GSU has determined that the examples cited as failure to follow procedure | |||
were caused by personnel oversite due to inattent'on to detail. However, | |||
these examples are believed to be isolated cases. Further investigation ' | |||
into each example is discussed below. | |||
A. Sincu page 24 of 60 for STP 051-4210 is unaccounted for and cannot be | |||
duplicated for record purposes, it can only be assumed that the ! | |||
technicians performing the STP were careless in maintaining the [ | |||
documentation. | |||
B. STP-403-0601, completed 12/18/87 for operability of the standby gas | |||
treatment system, was in violation of ADM-0015 Section 8.3.1. The ! | |||
testing engineer identified an unnecessary siep in the procedure. He | |||
labeled the step N/A, wrote a comment on the data page of the STP and , | |||
listed these steps as test exceptions. Since these steps were listed | |||
in the STP acceptance criteria ne was required to either revise the | |||
procedure or write a TCN to change the acceptance criteria. ; | |||
i | |||
C. For STP-053-0601 Rev. 2, the data chart was misplaced during ; | |||
transmittal to Pennanent Plant File, | |||
i | |||
CORRECTIVE STEPS WHICH HAVE BEEN TAKEN AND THE RESULTS ACHIEVES | |||
: A. The missing sign-offs were determined to have no impact on the , | |||
successful completion of the surveillance test procedure (STP). The l | |||
missing initials were for steps that would have been labeled N/A or | |||
. | |||
' | |||
steps that notified the operator that the STP was in progress. | |||
* | |||
B. A TCN has been issued for STP-403-0601 to reflect the actual testing l | |||
requirements for the standby gas treatment system. An imediate | |||
special test was performed 8/12/88 demonstrating operability of the , | |||
system and was documented on CR-88-0644. | |||
C. Again, since missing documents cannot be recreated for record purposes, | |||
the missing data was evaluated and determined to be backup data for the | |||
completion of the test. The data from this chart was recorded in the | |||
contents of the STP. | |||
CORRECTIVE STEPS WHICH WILL BE TAKEN TO AY010 FURTHER VIOLATIONS | |||
STP-053-0601, Rev. 2 will be revised to assure that the data chart is | |||
identified as part of the c w pleted data package. | |||
StationSupportProcedI;re(SSP)-1-003,"Rin.ordsManagement/ Permanent Plant | |||
been reviewed for adequacy. Personnel in pennanent plant file | |||
File}" | |||
(PPF hashave been reinstructed on the receipt of STP data packages to assure | |||
that verification of numbered pages and attachments is made, and to assure * | |||
that shift clerks have numbered all attached data sheets. If a discrepancy | |||
is noted by PPF, the document package is returned immediately to plant | |||
staff for correction. | |||
Page 2 of 3 | |||
i | |||
r . W | |||
' | |||
. ' .; , | |||
sn J , | |||
, | |||
GSU has begun a random review of STP documentation and completion process. | |||
Results will be reported to the Plant Manager by October 31, 1988. Results | |||
and recomendations resulting from the review will be evaluated to | |||
deterinine what actions, if any, should be taken. A supplemental response | |||
to the NRC will be provided during November, 1988. | |||
DATE WHEN FULL COMPLIANCE WILL BE ACHIEVIS | |||
1) GSU's review will be compieted by October 31, 1988. | |||
2) Results of the review will determine any resulting orrective actions | |||
and the date in which they will be completed. | |||
3) A supp1r- ntal response will be provided during November, 1988. | |||
4) STP-053-0601 will be revised by January 31, 1989 since this procedure | |||
will not be run again until the second refueling outage scheduled in | |||
March, 1989. | |||
, | |||
'l | |||
e | |||
i | |||
Page 3 of 3 | |||
--______________--__a | |||
}} | }} |
Revision as of 18:11, 16 December 2020
ML20195D825 | |
Person / Time | |
---|---|
Site: | River Bend |
Issue date: | 10/28/1988 |
From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
To: | Deddens J GULF STATES UTILITIES CO. |
References | |
NUDOCS 8811070142 | |
Download: ML20195D825 (2) | |
See also: IR 05000458/1988018
Text
-_ _
~
, . . .
. -
.
-
OCT 2 81988
In Reply Refer To: 1
Docket: 50-458/88-18
Gulf States Utilities
ATTN: - Mr. James C. Deddens [
SeniorVicePresident(RBNG) !
'
P.O. Box 220
St. Francisville, Louisiana 70775
Gentlemen:
Thank you for your letter of September 30, 1988, in response to our letter
and the attached Notice of Violation dated September 1, 1988. As a result
of our review, we find that additional information is needed, as discussed with
your Mr. Rick J. King during a telephone call with our Messrs. W. Seidle and
R. Azua on October 25, 1988. Specifically, in the area of "Corrective Steps.
Which Will Be Taken To Avoid Further Violations " it was noted that corrective
steps were not identified for Items B and C that would preclude recurrence of
these events. In addition, the corrective steps described in the second
paragraph of the same section failed to assure that supervisor of the appropriste
discipline would be involved, as comitted to during the exit interview.
Please provide the supplemental information within 30 days of the date of this
letter.
Sincerely,
Original Simwo 3)
11 L Calbn ,
l L. J. Callan, Director
Division of Reactor Projects
'
cc:
Gulf States Utilities '
ATTN: J. E. Booker, Manager-
i River Bend Oversight !'
l P.O. Box 2951
Beaumont, Texas 77704
'
Gulf States Utilities
ATTN: Les England, Director .
Nuclear Licensing - RBNG ;
P.O. Box 220 :
St. Francisv111e, Louisiana 70775 l
,
Louisiana State University,
l Goverreent Documents Department
Louisiana Radiation Control Program Director .
l
D:DRS A D:DRPgN.
RIV:R M RI C:TPS g
LJCallan
RAzua/1d HBundy g WCSeiIle JLMilhoan i
w /tt/88 /r /s1/88 /ch7/88 /c // 7 /88 /0 hl/88 l
f 8911070142 88102G
ADOCKOS00g'g*G
{DR :
l
,, ' -
.
Gulf States Utilities -2-
bec to DMB (IE01)
bec distrib. by RIV:
DRP RRI
R. D. Martin, RA Section Chief (DRP/C)
Lisa Shea, RM/ALF MIS System
,
RPB-DRSS RSTS Operator
Project Engineer DRP/C RIV File
W. Paulson, NRR Project Manager DRS
R. Azua W. Seidle
H. Bundy
J
. . .
9
,.
,,,,, .,.
.
GULF STATES UTILITIES COMPANY
mu .no sw a :st e we soi m se nuisme %s,.s4 r.n.
.
.j :SNJ LN[],[(#[
September 30, 1988 i ;> g
RBG- 28911 '
OCT 51988 1 l
File Nos. G9.5, G15.4.1 i j l
U y
.
U. S. Nuclear Regulatory Comission
Document Control Desk
Washington, DC 20555
Gentlemen:
RIVER 80I6 STATION - UN!T 1
REFER T0: REGT0h IV
DOCKET NO. 50-458/ REP 6RT &-18
Pursuant to 10CFR2.201, this letter responds to the Notice of Violation -
contained in NRC Inspection Report No. 50-458/88-18. The inspection was
performed by Messrs. H. F. Bundy and R. V. Azua during the period August
8-12, 1988 of activities authorized by NRC Operating License NPF-47 for
River Bend Station - Unit 1.
Gulf States Utilities Company's (GSU) response to Violation 8818-01,
"Failure to Properly Evaluate and Document Surveillance Test Results." is
provided in the attachment.
Should you have any questions, please contact Mr. Rick J. King at (504)
381-4146.
Sincerely,
f f.
J. E. Booker
s
Manager-River Bend Oversight
River Bend Nuclear Group
Attachment ,
cc: U. S. Nuclear Regulatory Comission
611 Ryan Plaza Drive, Suite 1000
Arlington, TX 76011
NRC Resident inspector
P.O. Box 1051
St. Francisville, LA 70775
$0Y? 0 bY ? hl $ [ ,- & S %2 - - _ - _ - _ - _ _ _
1
,
.
. .
g ,.' g ,
.
4
UNITED STATES OF AMERICA
NUCLEAR REGULATORY COMMISSION
$
STATE OF LOUISIANA
$
$
PARISH OF WEST FELICIANA
$
f Docke. No. 50-458
In the Matter of
$
$
GULF STATES UTILITIES COMPANY
$
(River Band Station f
Unit 1) i
J. E. Booker, being duly sworn . .es that he is Manager-River Bend
OversightforGulfStatesUtilitiesCompany;thatheisauthorizedonthe
part of said Company to sign and file with the Nuclear Regulatory
'
Commission the documents attached hereto; theat he has read all of the
statements contained in such documents attached thereto and made a part
thereof; and that all such statements made and natters set forth therein
are true and correct to the best of his knowledge, information and belief.
.Vh
4. E. Booker
Subscribed and sworn to before me, a Notary Public in and for the State
and Parish above named, this .3d day of 'an im . _.
19N.
.
.
% a $
N3fary Public in and for
West Feliciana Parish. Louisiana
My Commission is For Life.
.
h
.
'
0,,.' 6' .
,
Attachment 1
Response to Notice of Violation 50-458/8818 01
Level IV
REFERENCE
Notice of Violation - Letter from L. J. Callan to J. C. Deddens, dated
September 1, 1988.
VIOLATION: FAILURE TO PROPERLY EVALUATE AND DOCWENT SURVEILLANCE TEST
RE5 ULT 3
Title 10, Part 50, Appendix B, Criterion" XI, "Test Control," of the Code of
Federal Regulations states, in part, . . . Test results shall be
documented and evaluated to assure that test requirements have been
satisfied." Criterion XI is implemented by RBS Quality Assurance Directive
(QAD)-11, Revision 5. "Test Control." This Directive ilso requires that
recorded data reveal the adequacy of the equipment of syster.c to meet the
specified requirement in the acceptance criteria. Further implementation
of these documents is provided by RBS adninistrative procedures (ADMs) as
discussed below. Section 8.3.1 of ADM-0015 specifically disallows use of
test exceptions when acceptance criteria cannot be met. Section 8.6 of
ADM-0015 requires that all data, calculations, notes, etc., which are
essential in proving the acceptability of s surveillance test procedure
(STP), shall be recorded on the data line provided or attached to the
procedure.
Contrary to the above, the following failures were identified:
A. Test data for STP-051-4210, completed on October 13, 1987, was
incomplete in that page 24 of the 60-page procedure contained no test
,
data. This precluded ascertaining that the data had been properly
documented and evaluated as required by 10CFR50, Appendix B, Criterion
XI.
.
B. Test exceptions were written for performance of Sections 7.3.4. and
" 5.4 of STP-402-0601, "Standby Gas Treatment System Annulus Mixing
System Functional Tests." Writing test exceptions of an acceptance
criter; n that cannot be met constituted a violation of Section J.3.1
of ADM-0013. Also, the adequacy of the system to meet the specified
requirements in, the acceptance criteria was not revealed by the
recorded data as rgquired by QAD-11.
C. The data and calculation for the average stroke rate of Yalve
1833-HYVF0 GOB timed in Step 7.4.12 of STP-053-0601, "Rectre Flow
Control Valve Operability Test," were not included in the data package
completed on October 24, 1981, as required by Section 8.6 of ADM-0015.
t
Page 1 of 3
l-
-
, 4
i
e L O
.-4
.
REASON FOR THE VIOLATION
GSU has determined that the examples cited as failure to follow procedure
were caused by personnel oversite due to inattent'on to detail. However,
these examples are believed to be isolated cases. Further investigation '
into each example is discussed below.
A. Sincu page 24 of 60 for STP 051-4210 is unaccounted for and cannot be
duplicated for record purposes, it can only be assumed that the !
technicians performing the STP were careless in maintaining the [
documentation.
B. STP-403-0601, completed 12/18/87 for operability of the standby gas
treatment system, was in violation of ADM-0015 Section 8.3.1. The !
testing engineer identified an unnecessary siep in the procedure. He
labeled the step N/A, wrote a comment on the data page of the STP and ,
listed these steps as test exceptions. Since these steps were listed
in the STP acceptance criteria ne was required to either revise the
procedure or write a TCN to change the acceptance criteria. ;
i
C. For STP-053-0601 Rev. 2, the data chart was misplaced during ;
transmittal to Pennanent Plant File,
i
CORRECTIVE STEPS WHICH HAVE BEEN TAKEN AND THE RESULTS ACHIEVES
- A. The missing sign-offs were determined to have no impact on the ,
successful completion of the surveillance test procedure (STP). The l
missing initials were for steps that would have been labeled N/A or
.
'
steps that notified the operator that the STP was in progress.
B. A TCN has been issued for STP-403-0601 to reflect the actual testing l
requirements for the standby gas treatment system. An imediate
special test was performed 8/12/88 demonstrating operability of the ,
system and was documented on CR-88-0644.
C. Again, since missing documents cannot be recreated for record purposes,
the missing data was evaluated and determined to be backup data for the
completion of the test. The data from this chart was recorded in the
contents of the STP.
CORRECTIVE STEPS WHICH WILL BE TAKEN TO AY010 FURTHER VIOLATIONS
STP-053-0601, Rev. 2 will be revised to assure that the data chart is
identified as part of the c w pleted data package.
StationSupportProcedI;re(SSP)-1-003,"Rin.ordsManagement/ Permanent Plant
been reviewed for adequacy. Personnel in pennanent plant file
File}"
(PPF hashave been reinstructed on the receipt of STP data packages to assure
that verification of numbered pages and attachments is made, and to assure *
that shift clerks have numbered all attached data sheets. If a discrepancy
is noted by PPF, the document package is returned immediately to plant
staff for correction.
Page 2 of 3
i
r . W
'
. ' .; ,
sn J ,
,
GSU has begun a random review of STP documentation and completion process.
Results will be reported to the Plant Manager by October 31, 1988. Results
and recomendations resulting from the review will be evaluated to
deterinine what actions, if any, should be taken. A supplemental response
to the NRC will be provided during November, 1988.
DATE WHEN FULL COMPLIANCE WILL BE ACHIEVIS
1) GSU's review will be compieted by October 31, 1988.
2) Results of the review will determine any resulting orrective actions
and the date in which they will be completed.
3) A supp1r- ntal response will be provided during November, 1988.
4) STP-053-0601 will be revised by January 31, 1989 since this procedure
will not be run again until the second refueling outage scheduled in
March, 1989.
,
'l
e
i
Page 3 of 3
--______________--__a