ML17345A811: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED DI UTION DEMONS TION SYSTEM U~,~REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION TIERNEY,R.A.
{{#Wiki_filter:ACCELERATED DI                         UTION DEMONS               TION SYSTEM U ~, ~
Florida Power&Light, Co.PLUNKETT,T.F.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION
DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and               Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and               Light C 05000251 AUTH. NAME           AUTHOR AFFILIATION TIERNEY,R.A.         Florida     Power & Light, Co.
PLUNKETT,T.F.         Florida     Power & Light Co.
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating epts for Mar 1991 for Turkey Point Units 3&./910412 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: D RECIPIENT ID CODE/NAME PD2-2 LA AULUCK,R INTERNAL: AEOD/DOA 1@EjQ3LBQb EB10 G FILE 01 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 3 3 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DS P/TPAB NRR/DOEA/OEAB RGN2 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D D NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating epts           for Mar 1991 for Turkey Point Units 3 &     . /910412 ltr.                                                             D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR                 ENCL       SIZE:
4 PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER'F COPIES REQUIRED: LTTR 14 ENCL 14 D D P.O.Box 029100, Miami, FI33102-9100 APR 1.21991 L-91-113 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
TITLE: Monthly Operating Report (per Tech Specs)
RE: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the March 1991 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, gp-P/u~ve>h T.F.Plunkett Vice President Turkey Point Nuclear TFP/DRP/RAT attachments cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9i04220277 9i033i PDR.ADOCK 05000250 R'"'-'DR an FPL Group company I t~I')Qi f--4 g>>a\
NOTES:
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO'0-250 UNIT Turke Point 3 DATE A ril 11 1991 COMPLETED BY R.A.Tierne TELEPHONE 305 246-6970 MONTH March 1991 AVERAGE DAILY POWER (MWe-Net)LEVEL 03/0 1/9 1 03/02/91 03/03/91 03/04/91 03/05/9 1 03/0 6/9 1 03/07/91 03/08/91 03/09/91 03/10/91 03/11/9 1 03/12/91 03/13/9 1 03/14/91 03/15/9 1 03/16/9 1 03/17/9 1 03/18/9 1 03/19/91 03/20/91 03/2 1/9 1 03/22/91 03/23/91 03/24/91 03/25/91 03/26/91 03/27/91 03/28/91 03/29/91 03/3 0/9 1 03/31/91 0 0 0 0 0 0 0 0 0 0 0 0 0 0'0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 OPERATING STATUS OPERATING DATA REPORT DOCKET HO 50-250 DATE 4/18/91 COMPLETED'BY R.Ai TIERNEY TELEPHONE 385/246/6970 li UNIT HA)IEI TURKEY POINT UNIT 3 2i REPORTING PERIODS HARCH 1991 3i LICENSED THERHAL POHER (lQT)1 2280 4 HANEPLATE RAlIHG (GROSS SK)l 760 5, DESIGN ELECTRIGtL RATlHG (NET SK)l 693 bi HAXI)m)I DEPENDABLE CAPACITY (GROSS SK)I 699 7i HAXIHUH DEPENDABLE CAPACITY (HH lNE)l 666 Bo IF CHANGES OCCUR IH CAPACITY RATINGS (ITEHS NJHBER 3 THROUGH 7)SINCE LAST REPORT)GIVE REASONSI'9.PONER LEVEL TO WHICH RESTRICTED'F AHY (HET H)IE)10i REASONS FOR RESTRICTIONSt IF ANY)HOHTHLY-YTD-Cm(ULATIVE iii HOURS IH REPORT PERIOD)12i HUINER OF HOURS REACTOR WAS CRITICAL 13<REACTOR RESERVE SHUTINNH HOURS 14<HOURS GENERATOR OH-LINE 15'NIT RESERVE SHUTDOHH HOURS ibo GROSS THEINAL EHERGY GENERATED (SN)17<GROSS ELECTRICAL ENERGY GENERATED (NH)18(HET ELECTRICAL ENERGY GENERATED (M)19'NIT SERVICE-FACTOR 20e UNIT AVAILABILITY FACTOR 2li CAPACITY FACTOR (USING HDC HET)22'APACITY FACTOR (USING DER HET)23'NIT FORCED OUTAGE RATE 24>SHUTDO!5S SCHEDULED OVER NEXT 6 HONTHS t 744 Go0 e,e Go0 GiG 0 0-566 Gi0 Gi0 GiG Go0 0,0 2160 Go0 0.0 Go0 0.0 0 0-3825 Gi0 Ge0 Gi0 Go0 0.0 160593ib 104473>2 844i4 103055i7 121.8 214231642 68615991 64874693 64i2 64>2 bli8 58e3 12>5 25 IF SHUT DOmI AT EHD OF REPORT PERIOOt ESTIHATED DATE OF STARTUPl ie/03/91  
RECIPIENT              COPIES          RECIPIENT           COPIES ID CODE/NAME           LTTR ENCL      ID  CODE/NAME        LTTR ENCL PD2-2 LA                     3    3    PD2-2 PD                1    1 AULUCK,R                     1    1                                              D INTERNAL: AEOD/DOA                       1    1    AEOD/DS P/TPAB          1    1 1@EjQ3LBQb     EB10         1    1    NRR/DOEA/OEAB          1    1 G FILE       01        1    1    RGN2                    1    1 EXTERNAL: EG&G BRYCE,J.H                 1     1     NRC PDR                 1   1 NSIC                        1     1 D
~.
D D
UNlT SHUTDOWNS AND POWER REDUCTlQNS REPORT MONTH March 1991 DOCKET NO.50-250 Turkey Point k'3 DATE April 11, 1991.COMPLETED BY R.A.Tierney-970 Date Type'uration (Hours)Reason2 Method of Shutting Down Reactor Ucensee Event Report&#xb9;System Code4 Component Codes Cause 4 Corrective Actionto PreventRecurrence 22 901212 S 744 H/A EE Engine Unit 3 was shutdown for a scheduled Upgrades Outage.F Forced S Scheduled 2 Reason A-Equipment FaHure(Explain)
NOTE TO ALL "RIDS" RECIPIENTS:
B-Maintenance or Test C-Refueling D-Reguhtory Restriction E-Operator Training 8 Ucense Examination F-Administrative G-Operational Error (Exphin)H-Other(Exphin)
4 PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Exphin)Exhibit G-instructions for Preparation of Data Entry Scheets Ucensee Event Report(LER)
TOTAL NUMBER'F COPIES REQUIRED: LTTR               14   ENCL   14
Re (NUREG4161)
 
Exhibit 1-Same Source  
P.O. Box 029100, Miami, FI33102-9100 APR 1. 21991 L-91-113 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.               20555 Gentlemen:
RE:   Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the March 1991 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very   truly   yours, gp-P/u~ ve> h T. F. Plunkett Vice President Turkey Point Nuclear TFP/DRP/RAT attachments cc:   Stewart D. Ebneter, Regional Administrator, Region II,             USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9i04220277 9i033i PDR R
            "'-'DR ADOCK 05000250 an FPL Group company
 
It
    ~I
')Qi f--
4 g>>
          \  a
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO'0-250 UNIT Turke   Point   3 DATE A ril 11 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 MONTH     March 1991 AVERAGE   DAILY POWER LEVEL (MWe-Net) 03/0 1/9 1             0 03/02/91               0 03/03/91               0 03/04/91               0 03/05/9 1             0 03/0 6/9 1             0 03/07/91               0 03/08/91               0 03/09/91               0 03/10/91               0 03/11/9 1             0 03/12/91               0 03/13/9 1             0 03/14/91               0' 03/15/9 1 03/16/9 1             0 03/17/9 1             0 03/18/9 1             0 03/19/91               0 03/20/91               0 03/2 1/9 1             0 03/22/91               0 03/23/91               0 03/24/91               0 03/25/91               0 03/26/91               0 03/27/91               0 03/28/91               0 03/29/91               0 03/3 0/9 1             0 03/31/91               0
 
OPERATING DATA REPORT DOCKET HO         50 - 250 DATE               4/18/91 COMPLETED'BY R. Ai TIERNEY TELEPHONE     385/246/6970 OPERATING STATUS li UNIT HA)IEI TURKEY POINT     UNIT 3 2i REPORTING PERIODS     HARCH 1991 3i LICENSED THERHAL POHER   (lQT)1                 2280 4   HANEPLATE RAlIHG (GROSS   SK) l                 760 5, DESIGN ELECTRIGtL RATlHG (NET SK) l             693 bi HAXI)m)I DEPENDABLE CAPACITY (GROSS SK) I       699 7i HAXIHUH DEPENDABLE CAPACITY   (HH lNE) l       666 Bo IF CHANGES OCCUR   IH CAPACITY RATINGS (ITEHS NJHBER 3 THROUGH   7)
SINCE LAST REPORT) GIVE REASONSI
'9. PONER LEVEL TO WHICH RESTRICTED'F AHY (HET H)IE) 10i REASONS FOR RESTRICTIONSt   IF ANY)
HOHTHLY   -YTD- Cm(ULATIVE iii HOURS IH REPORT PERIOD)                         744      2160      160593ib 12i HUINER OF HOURS REACTOR WAS CRITICAL               Go0      Go0    104473>2 13< REACTOR RESERVE SHUTINNH HOURS                     e,e      0.0        844i4 14< HOURS GENERATOR OH-LINE                             Go0      Go0    103055i7 15'NIT RESERVE     SHUTDOHH HOURS                     GiG      0.0        121.8 ibo GROSS THEINAL EHERGY GENERATED   (SN)             0        0    214231642 17< GROSS ELECTRICAL ENERGY GENERATED     (NH)           0        0    68615991 18( HET ELECTRICAL   ENERGY GENERATED   (M)           -566    -3825    64874693 19'NIT     SERVICE- FACTOR                             Gi0      Gi0          64i2 20e UNIT AVAILABILITYFACTOR                            Gi0      Ge0          64>2 2li CAPACITY FACTOR (USING HDC HET)                   GiG      Gi0          bli8 22'APACITY FACTOR     (USING DER HET)                 Go0      Go0          58e3 23'NIT     FORCED OUTAGE RATE                           0,0      0.0          12>5 24> SHUTDO!5S SCHEDULED OVER NEXT 6 HONTHS     t 25   IF SHUT DOmI AT EHD OF REPORT PERIOOt ESTIHATED DATE OF STARTUPl     ie/03/91
 
~ .
UNlT SHUTDOWNS AND POWER REDUCTlQNS                                 DOCKET NO.     50-250 Turkey Point k'3 DATE     April 11, 1991.
COMPLETED BY       R. A. Tierney REPORT MONTH          March  1991                                                    - 970 Method of Shutting      Ucensee                                        Cause  4 Corrective Down          Event      System  Component                    Actionto Date Type'uration (Hours)   Reason2     Reactor       Report&#xb9;     Code4     Codes                 PreventRecurrence 22 901212     S       744                                 H/A           EE     Engine     Unit 3 was shutdown     for   a scheduled Upgrades Outage.
2 F Forced               Reason                                              Method                          Exhibit G-instructions S Scheduled           A - Equipment FaHure(Explain)                         1 - Manual                      for Preparation of Data B - Maintenance or Test                             2- Manual Scram                Entry Scheets Ucensee C - Refueling                                       3 - Automatic Scram            Event Report(LER) Re D - Reguhtory Restriction                           4 - Continued                  (NUREG4161)
E - Operator Training 8 Ucense Examination           5 - Load Reduction F - Administrative                                  9 - Other (Exphin)
G - Operational Error (Exphin)                                                       Exhibit 1-Same Source H - Other(Exphin)


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO'50-250 UNIT Turke Point 3 DATE'ril 11 1991 COMPLETED BY R.A.Tierne TELEPHONE 305 246-6970 REPORT MONTH March 1991 Unit.3 was shutdown on December 12, 1990 for a scheduled Upgrades Outage.
OF OPERATING EXPERIENCE DOCKET NO'   50-250 UNIT Turke Point     3 DATE'   ril 11 1991 COMPLETED BY R. A. Tierne TELEPHONE   305 246-6970 REPORT MONTH   March   1991 Unit. 3 was shutdown on December 12, 1990   for a scheduled Upgrades Outage.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-251 UNIT Turke Point 4 DATE A ril 11 1991 COMPLETED BY R.A.Tierne TELEPHONE 305 246-6970 MONTH March 1991 AVERAGE DAILY POWER (MWe-Net)LEVEL 03/0 1/9 1 03/02/91 03/03/91 03/04/91 03/05/91 03/06/91 03/07/91 03/08/91 03/09/91 03/10/9 1 03/11/9 1 03/12/9 1'3/13/9 1 03/14/9 1 03/15/9 1 03/16/9 1 03/17/9 1 03/18/9 1 03/19/9 1 03/2 0/9 1 03/2 1/9 1 03/22/91 03/23/91 03/24/91 03/25/91 03/2 6/9 1 03/27/91 03/28/91 03/29/91 03/30/91 03/31/91 OPERATING STATUS OPERATING DATA REPORT DOCKET HO 59-251 DATE 4/10/91 COMPLETED BY R>>A>>TIERNEY TELEPHONE 395/246/6970 1 UNIT HAMEl TURKEY POINT UNIT 4 2>>REPORTIHG PERIODS MARCH 1991 3.LICENSED THERMAL PmKR (NIT)f 2290 4>>INIEPLATE RATING (GROSS MHE)t 760 5>>DESIGH ELECTRICAL RATING (HET NK)t 693 6>>MAXINN DEPENDABLE CAPACITY (GROSS ISE)t 699 7>>MAXIMUM DEPEHDABLE CAPACITY (NET SK)>>666 8>>IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS HSIBER 3 THROUGH 7)SIHCE LAST REPORTS GIVE REASONSt 9>>POHER LEVEL TO HHICH RESTRICTEDt IF NY (NET ISK).10>>REASONS FOR RESTRKTIOHSt IF ANY'i>>HOURS IH REPORT PERIOD>>12>>NUMBER OF HOURS REACTOR HAS CRITICAL 13>>REACTOR RESERVE SHUTDOMH HOURS14>>HOURS GENERATOR OH-LINE 15>>UHIT RESERVE SHUTDINH HOURS 16>>GROSS THERMA!EHERGY GENERATED (NN)17>>GROSS ELECTRICAL ENERGY GEHERATED (MMH)18>>HET ELECTRICAL ENERGY GENERATED (MtIH)19>>UNIT SERVICE FACTOR 20>>UNIT AVAILABILITY FACTOR 21>>CAPACITY FACTOR (USING MDC HET)22>>CAPACITY FACTOR (USING DER NET)23>>INIT FORCED OUTAGE RATE 24>>SHUTINNHS'SCHEDULED OVER NEXT 6 MONTHS>>744 0>>8 0>>0 0.0 0.0 0 0<89 0>>8 0.0 0>>0 0.0 0>>0 2160 e,e 0,0 0.0 0>>0 0 0-2687 0.0 e,e 0>>0 0,0 0.0 154325>>0 101186>>4 166>>6 97567>>i 32>>l 205630060 65612889 62050941 63>>2 63>>2 61.5 58>>0 11>>9 25>>IF SHUT INNH AT EIS OF REPORT PERIODr ESTIMATED'ATE OF STARTUP>>li/94/91


UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME DATE-5 Turkey Point&#xb9;4 Apri1 11, 1991 REPORT MONTH March, 1991 COMPLETED BY R.A.Tierney TELEPHONE Date Type Duration (Hours)Reasons Method of Shutting Down Reactor Ucensee Event Report&#xb9;System Code4 Component Co'des Cause 8 Corrective Actionto Prevent Recurrence 901124 , S 744 C/H N/A RC/EE FUELXX ENGINE Unit 4 shutdown for a scheduled Upgrades and Refue1ing 0utage.F Forced S Scheduled 2 Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&Ucense Examination F-Administrative G-OperationaIError (Explain)H-Other(ExpiaIn)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-251 UNIT Turke Point     4 DATE A  ril 11 1991 COMPLETED BY R. A. Tierne TELEPHONE   305 246-6970 MONTH            March 1991 AVERAGE DAILY POWER LEVEL (MWe-Net) 03/0 1/9 1 03/02/91 03/03/91 03/04/91 03/05/91 03/06/91 03/07/91 03/08/91 03/09/91 03/10/9 1 03/11/9 1 03/12/9 1
Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5.-Load Reduction 9-Other (Exphin)Exhibit G-Instructions for Preparation of Data Entry Scheets Ucensee Event Report (LER)File (NUREG4161)
1'3/13/9 03/14/9 1 03/15/9 1 03/16/9 1 03/17/9 1 03/18/9 1 03/19/9 1 03/2 0/9 1 03/2 1/9 1 03/22/91 03/23/91 03/24/91 03/25/91 03/2 6/9 1 03/27/91 03/28/91 03/29/91 03/30/91 03/31/91
Exhibit1-Same Source


'
OPERATING DATA REPORT DOCKET HO        59  -  251 DATE              4/10/91 COMPLETED BY R>> A>> TIERNEY TELEPHONE    395/246/6970 OPERATING STATUS 1  UNIT HAMEl TURKEY POINT    UNIT 4 2>> REPORTIHG PERIODS      MARCH 1991
: 3. LICENSED THERMAL PmKR  (NIT) f                      2290 4>> INIEPLATE RATING (GROSS MHE)t                          760 5>> DESIGH ELECTRICAL RATING (HET          NK) t          693 6>> MAXINN DEPENDABLE CAPACITY (GROSS ISE) t                699 7>> MAXIMUM DEPEHDABLE CAPACITY (NET          SK)>>        666 8>>  IF CHANGES OCCUR  IH CAPACITY RATINGS (ITEMS HSIBER 3 THROUGH          7)
SIHCE LAST REPORTS GIVE REASONSt 9>> POHER LEVEL TO HHICH RESTRICTEDt          IF NY  (NET ISK).
10>> REASONS FOR RESTRKTIOHSt    IF ANY'i>>
HOURS IH REPORT PERIOD>>                                744      2160      154325>>0 12>> NUMBER OF HOURS REACTOR HAS CRITICAL                      0>>8      e,e    101186>>4 13>> REACTOR RESERVE SHUTDOMH HOURS                          0>>0      0,0        166>>6 14>> HOURS GENERATOR OH-LINE                                  0.0      0.0      97567>>i 15>> UHIT RESERVE SHUTDINH HOURS                              0.0      0>>0          32>>l 16>> GROSS THERMA! EHERGY GENERATED          (NN)                0        0    205630060 17>> GROSS ELECTRICAL ENERGY GEHERATED (MMH)                      0        0    65612889 18>> HET ELECTRICAL ENERGY GENERATED (MtIH)                  <89      -2687    62050941 19>> UNIT SERVICE FACTOR                                      0>>8      0.0          63>>2 20>> UNIT AVAILABILITYFACTOR                                  0.0      e,e          63>>2 21>> CAPACITY FACTOR (USING  MDC HET)                        0>>0      0>>0          61.5 22>> CAPACITY FACTOR (USING DER NET)                          0.0      0,0          58>>0 23>>  INIT FORCED OUTAGE RATE                                  0>>0      0.0          11>>9 24>> SHUTINNHS'SCHEDULED OVER NEXT 6 MONTHS>>
25>>  IF SHUT INNH AT  EIS OF REPORT PERIODr        ESTIMATED'ATE OF STARTUP>>  li/94/91
 
UNIT SHUTDOWNS AND POWER REDUCTIONS                              DOCKET NO.          - 5 UNIT NAME        Turkey Point &#xb9;4 DATE        Apri1 11, 1991 COMPLETED BY        R. A. Tierney REPORT MONTH      March, 1991                          TELEPHONE Method of Shutting    Ucensee                                      Cause 8 Corrective Duration                Down        Event    System  Component                      Actionto Date        Type (Hours)    Reasons    Reactor      Report&#xb9;    Code4      Co'des                Prevent Recurrence 901124    ,  S    744        C/H                    N/A      RC/EE    FUELXX      Unit 4 shutdown for a scheduled ENGINE    Upgrades and Refue1ing 0utage.
2 F Forced              Reason                                            Method                          Exhibit G-Instructions S Scheduled            A - Equipment Failure (Explain)                    1 - Manual                      for Preparation of Data B - Maintenance or Test                            2 - Manual Scram                Entry Scheets Ucensee C - Refueling                                      3 - Automatic Scram            Event Report (LER) File D - Regulatory Restriction                        4 - Continued                  (NUREG4161)
E - Operator Training & Ucense Examination        5.- Load Reduction F - Administrative                                9 - Other (Exphin)
G - OperationaIError (Explain)                                                    Exhibit1-Same Source H - Other(ExpiaIn)


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET, NO~50-251 UNIT Turke Point 4 DATE A ril 11 1991 COMPLETED BY R.A.Tierne TELEPHONE 305 246-6970 ,REPORT MONTH March 1991 Unit 4 was shutdown for a scheduled Upgrades and Refueling Outage on November 26, 1990.
OF OPERATING EXPERIENCE DOCKET, NO ~ 50-251 UNIT Turke Point     4 DATE A ril 11 1991 COMPLETED BY R. A. Tierne TELEPHONE   305 246-6970
0 ,~'}}
                  ,REPORT MONTH   March   1991 Unit 4 was shutdown for a scheduled Upgrades and   Refueling Outage on November 26, 1990.
 
0   , ~
  '}}

Latest revision as of 22:29, 3 February 2020

Monthly Operating Repts for Mar 1991 for Turkey Point Units 3 & 4.W/910412 Ltr
ML17345A811
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/31/1991
From: Plunkett T, Tierney R
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-91-113, NUDOCS 9104220277
Download: ML17345A811 (16)


Text

ACCELERATED DI UTION DEMONS TION SYSTEM U ~, ~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION TIERNEY,R.A. Florida Power & Light, Co.

PLUNKETT,T.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating epts for Mar 1991 for Turkey Point Units 3 & . /910412 ltr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 AULUCK,R 1 1 D INTERNAL: AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 1@EjQ3LBQb EB10 1 1 NRR/DOEA/OEAB 1 1 G FILE 01 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

4 PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER'F COPIES REQUIRED: LTTR 14 ENCL 14

P.O. Box 029100, Miami, FI33102-9100 APR 1. 21991 L-91-113 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the March 1991 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, gp-P/u~ ve> h T. F. Plunkett Vice President Turkey Point Nuclear TFP/DRP/RAT attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9i04220277 9i033i PDR R

"'-'DR ADOCK 05000250 an FPL Group company

It

~I

')Qi f--

4 g>>

\ a

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO'0-250 UNIT Turke Point 3 DATE A ril 11 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 MONTH March 1991 AVERAGE DAILY POWER LEVEL (MWe-Net) 03/0 1/9 1 0 03/02/91 0 03/03/91 0 03/04/91 0 03/05/9 1 0 03/0 6/9 1 0 03/07/91 0 03/08/91 0 03/09/91 0 03/10/91 0 03/11/9 1 0 03/12/91 0 03/13/9 1 0 03/14/91 0' 03/15/9 1 03/16/9 1 0 03/17/9 1 0 03/18/9 1 0 03/19/91 0 03/20/91 0 03/2 1/9 1 0 03/22/91 0 03/23/91 0 03/24/91 0 03/25/91 0 03/26/91 0 03/27/91 0 03/28/91 0 03/29/91 0 03/3 0/9 1 0 03/31/91 0

OPERATING DATA REPORT DOCKET HO 50 - 250 DATE 4/18/91 COMPLETED'BY R. Ai TIERNEY TELEPHONE 385/246/6970 OPERATING STATUS li UNIT HA)IEI TURKEY POINT UNIT 3 2i REPORTING PERIODS HARCH 1991 3i LICENSED THERHAL POHER (lQT)1 2280 4 HANEPLATE RAlIHG (GROSS SK) l 760 5, DESIGN ELECTRIGtL RATlHG (NET SK) l 693 bi HAXI)m)I DEPENDABLE CAPACITY (GROSS SK) I 699 7i HAXIHUH DEPENDABLE CAPACITY (HH lNE) l 666 Bo IF CHANGES OCCUR IH CAPACITY RATINGS (ITEHS NJHBER 3 THROUGH 7)

SINCE LAST REPORT) GIVE REASONSI

'9. PONER LEVEL TO WHICH RESTRICTED'F AHY (HET H)IE) 10i REASONS FOR RESTRICTIONSt IF ANY)

HOHTHLY -YTD- Cm(ULATIVE iii HOURS IH REPORT PERIOD) 744 2160 160593ib 12i HUINER OF HOURS REACTOR WAS CRITICAL Go0 Go0 104473>2 13< REACTOR RESERVE SHUTINNH HOURS e,e 0.0 844i4 14< HOURS GENERATOR OH-LINE Go0 Go0 103055i7 15'NIT RESERVE SHUTDOHH HOURS GiG 0.0 121.8 ibo GROSS THEINAL EHERGY GENERATED (SN) 0 0 214231642 17< GROSS ELECTRICAL ENERGY GENERATED (NH) 0 0 68615991 18( HET ELECTRICAL ENERGY GENERATED (M) -566 -3825 64874693 19'NIT SERVICE- FACTOR Gi0 Gi0 64i2 20e UNIT AVAILABILITYFACTOR Gi0 Ge0 64>2 2li CAPACITY FACTOR (USING HDC HET) GiG Gi0 bli8 22'APACITY FACTOR (USING DER HET) Go0 Go0 58e3 23'NIT FORCED OUTAGE RATE 0,0 0.0 12>5 24> SHUTDO!5S SCHEDULED OVER NEXT 6 HONTHS t 25 IF SHUT DOmI AT EHD OF REPORT PERIOOt ESTIHATED DATE OF STARTUPl ie/03/91

~ .

UNlT SHUTDOWNS AND POWER REDUCTlQNS DOCKET NO. 50-250 Turkey Point k'3 DATE April 11, 1991.

COMPLETED BY R. A. Tierney REPORT MONTH March 1991 - 970 Method of Shutting Ucensee Cause 4 Corrective Down Event System Component Actionto Date Type'uration (Hours) Reason2 Reactor Report¹ Code4 Codes PreventRecurrence 22 901212 S 744 H/A EE Engine Unit 3 was shutdown for a scheduled Upgrades Outage.

2 F Forced Reason Method Exhibit G-instructions S Scheduled A - Equipment FaHure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2- Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) Re D - Reguhtory Restriction 4 - Continued (NUREG4161)

E - Operator Training 8 Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Exphin)

G - Operational Error (Exphin) Exhibit 1-Same Source H - Other(Exphin)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO' 50-250 UNIT Turke Point 3 DATE' ril 11 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 REPORT MONTH March 1991 Unit. 3 was shutdown on December 12, 1990 for a scheduled Upgrades Outage.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-251 UNIT Turke Point 4 DATE A ril 11 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970 MONTH March 1991 AVERAGE DAILY POWER LEVEL (MWe-Net) 03/0 1/9 1 03/02/91 03/03/91 03/04/91 03/05/91 03/06/91 03/07/91 03/08/91 03/09/91 03/10/9 1 03/11/9 1 03/12/9 1

1'3/13/9 03/14/9 1 03/15/9 1 03/16/9 1 03/17/9 1 03/18/9 1 03/19/9 1 03/2 0/9 1 03/2 1/9 1 03/22/91 03/23/91 03/24/91 03/25/91 03/2 6/9 1 03/27/91 03/28/91 03/29/91 03/30/91 03/31/91

OPERATING DATA REPORT DOCKET HO 59 - 251 DATE 4/10/91 COMPLETED BY R>> A>> TIERNEY TELEPHONE 395/246/6970 OPERATING STATUS 1 UNIT HAMEl TURKEY POINT UNIT 4 2>> REPORTIHG PERIODS MARCH 1991

3. LICENSED THERMAL PmKR (NIT) f 2290 4>> INIEPLATE RATING (GROSS MHE)t 760 5>> DESIGH ELECTRICAL RATING (HET NK) t 693 6>> MAXINN DEPENDABLE CAPACITY (GROSS ISE) t 699 7>> MAXIMUM DEPEHDABLE CAPACITY (NET SK)>> 666 8>> IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS HSIBER 3 THROUGH 7)

SIHCE LAST REPORTS GIVE REASONSt 9>> POHER LEVEL TO HHICH RESTRICTEDt IF NY (NET ISK).

10>> REASONS FOR RESTRKTIOHSt IF ANY'i>>

HOURS IH REPORT PERIOD>> 744 2160 154325>>0 12>> NUMBER OF HOURS REACTOR HAS CRITICAL 0>>8 e,e 101186>>4 13>> REACTOR RESERVE SHUTDOMH HOURS 0>>0 0,0 166>>6 14>> HOURS GENERATOR OH-LINE 0.0 0.0 97567>>i 15>> UHIT RESERVE SHUTDINH HOURS 0.0 0>>0 32>>l 16>> GROSS THERMA! EHERGY GENERATED (NN) 0 0 205630060 17>> GROSS ELECTRICAL ENERGY GEHERATED (MMH) 0 0 65612889 18>> HET ELECTRICAL ENERGY GENERATED (MtIH) <89 -2687 62050941 19>> UNIT SERVICE FACTOR 0>>8 0.0 63>>2 20>> UNIT AVAILABILITYFACTOR 0.0 e,e 63>>2 21>> CAPACITY FACTOR (USING MDC HET) 0>>0 0>>0 61.5 22>> CAPACITY FACTOR (USING DER NET) 0.0 0,0 58>>0 23>> INIT FORCED OUTAGE RATE 0>>0 0.0 11>>9 24>> SHUTINNHS'SCHEDULED OVER NEXT 6 MONTHS>>

25>> IF SHUT INNH AT EIS OF REPORT PERIODr ESTIMATED'ATE OF STARTUP>> li/94/91

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. - 5 UNIT NAME Turkey Point ¹4 DATE Apri1 11, 1991 COMPLETED BY R. A. Tierney REPORT MONTH March, 1991 TELEPHONE Method of Shutting Ucensee Cause 8 Corrective Duration Down Event System Component Actionto Date Type (Hours) Reasons Reactor Report¹ Code4 Co'des Prevent Recurrence 901124 , S 744 C/H N/A RC/EE FUELXX Unit 4 shutdown for a scheduled ENGINE Upgrades and Refue1ing 0utage.

2 F Forced Reason Method Exhibit G-Instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory Restriction 4 - Continued (NUREG4161)

E - Operator Training & Ucense Examination 5.- Load Reduction F - Administrative 9 - Other (Exphin)

G - OperationaIError (Explain) Exhibit1-Same Source H - Other(ExpiaIn)

SUMMARY

OF OPERATING EXPERIENCE DOCKET, NO ~ 50-251 UNIT Turke Point 4 DATE A ril 11 1991 COMPLETED BY R. A. Tierne TELEPHONE 305 246-6970

,REPORT MONTH March 1991 Unit 4 was shutdown for a scheduled Upgrades and Refueling Outage on November 26, 1990.

0 , ~

'