ML17352A377: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/31/1993
| issue date = 12/31/1993
| title = Monthly Operating Repts for Dec 1993 for Turkey Point Units 3 & 4.W/940113 Ltr
| title = Monthly Operating Repts for Dec 1993 for Turkey Point Units 3 & 4.W/940113 Ltr
| author name = KNORR J E, PLUNKETT T F
| author name = Knorr J, Plunkett T
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Y E~REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS): CQSU4N4 FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C , AUTH.NAME AUTHOR AFFILIATION KNORR,J.E.
{{#Wiki_filter:Y E~
Florida Power 6 Light Co.PLUNKETT,T.F.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000250 05000251
: CQSU4N4                             DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light                   C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light                 C 05000251 AUTH. NAME           AUTHOR AFFILIATION Florida      Power 6 Light Co.
KNORR,J.E.
PLUNKETT,T.F.         Florida     Power 6 Light Co.
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly o e'ng repts for Dec 1993 for Turkey Point Units 3&4.113 tr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: D RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD/DOA N DORS 0 EG WIXR 01 EXTERNAL EGGG BRYCE i J~H NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME RAGHAVAN,L AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:
Monthly o     e     'ng repts   for Dec 1993 for Turkey Point Units 3 & 4.         113     tr.                                                       D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR                 ENCL       SIZE:
D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11  
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT              COPIES            RECIPIENT         COPIES ID  CODE/NAME            LTTR ENCL      ID CODE/NAME       LTTR ENCL          D PD2-2 PD                     1    1      RAGHAVAN,L            1    1 INTERNAL: AEOD/DOA                       1     1     AEOD/DSP/TPAB         1    1            D N    DORS  0                1    1      NRR/DRIL/RPEB         1    1 EG  WIXR        01        1     1     RGN2                  1     1 EXTERNAL    EGGG BRYCE i J ~ H          1     1     NRC PDR                1     1 NSIC                        1     1 D
D NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR               11   ENCL   11


..Box 029100, Miami, FL, 33102-9100 Jp,N l3 19M L-94-008 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
                                              .. Box 029100, Miami, FL, 33102-9100 Jp,N     l3     19M L-94-008 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn:   Document Control Desk Washington, D. C.                 20555 Gentlemen:
RE: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9'.5, and the guidance of NUREG-0020, attached are the December 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very Truly Yours, T.F.Plunkett Vice President Turkey Point Nuclear TFP/JEK/jk attachments cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant s~.j.OO 8 pg 9401240146 931231 PDR ADOCK 05000250'.R'DR an PPL Group company ZEND//(
RE:   Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl       0   eratin       Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9 '.5, and the guidance of NUREG-0020, attached are the December 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
F gO~$+>~p'a!eI AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-250 llKRH POINT 3 MONTH DECEMBER 1993 AVERAGE DAILY POWER LEVEL (MWe-Net)12/01/93 12/02/93 12/03/93 12/04/93 12/05/93 12/06/93 12/07/93 12/08/93 12/09/93 12/10/93 12/11/93 12/12/93 12/13/93 12/14/93 12/15/93 12/16/93 12/17/93 12/18/93 12/19/93 12/20/93 12/21/93 12/22/93 12/23/93 12/24/93 12/25/93 12/26/93 3.2/27/93 12/28/93 12/29/93 12/30/93 12/31/93 701 700 699 695 690 692 697 696 693 692 690 703 700 698 697 706 700 704 698 693 692 695 693 694 698 703 705 702 694 693 693 J
Very Truly Yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/JEK/jk attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant s~.j. OO 8 pg PDR R      'DR 9401240146 931231 ADOCK 05000250 an PPL Group company ZEND
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNlT NAME: 50-250 DATE: anuar COMPLETED BY:..norr TELEPHONE REPORT MONTH DECEMBER 1993 No Date Type'uration (Hours)Reasons Method of Shutting Down Reactors Licensee Event Reportt Spstep Comgnept Cause 4 Corrective Action to Prevent Recurrence NA N/A NIA 0.0 N/A N/A N/A N/A NIA N/A F-Forced s-scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Traininc 6 License Examination F-Administrative G-Operational Error (Explain)H-other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entrv Sheets Licensee Event Report (LER)File (NUREG-0161)
                                                                                  //(
Exhibit 1-same Source aM V I', II 1 c'if,'yt'f ,p'~N'.'<1 L a I<c'1 e<j C P OPERATING DATA REPORT OPERAT I NG STATUS DOCKET NO 50-250 DATE 1/7/94 COMPLETED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 3 REf>OH f ING PERIOD: DECEMBER 1993 L I CLff SED Tt IERMAL POWER (MWT): 2200 4.NAMf:PLATL ttaIING (GROSS MWE): 760 b.DLSl(AN ELECTRI(.AL RATING (NET MWL): 693 6 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8 It" CffANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE t AST REPORT~GIVE REASONS: 9 POWt.R LEVEL TO WHICH RESTRICTED.
 
IF ANY (NET MWE)'IO HLASONS FOR HFSTRICfIONS
F gO
~IF ANY>>MONTHLY-YTD-CUMULATIVE 1 1.~1(, HS Itt REPORf PERIOD: 12.NUMBER OF ttOURS REACTOR WAS CRITICAL 13.fct-af lOR RFSERVE SHUTDOWN HOURS 14.tfOt)HS GENERATOR ON-LING 15, uutl fEEsLRvh SrfufDowN H0URs 16 GfCO 5 IftERMA'tEERGY GENERAfEO (MWH)ff.Gffo'El ECTRICAL FNCRGY GENERATED (MWH)'tl.NF,I LLFCTRICAI.
~ $ +>
ENERGY GENERATED (MWH)IU.UNII EENVICE FACTOR 20.UNIT AVAILAUII ITY FACTOR 21.caPAcll Y I aclOR (UsING Muc NET)2>>".CAPAC11Y FAC1'OH (USING DER NET)23.utEIT I-ORCEO Outa(.E RATE 24.SffulDOWNS SCHBt)tfLFD OVER NEXT 6 MONTHS ,CYCLE 14 REFUELING OU1AGE SCtfEt)ul.ED 4/94 744 744.0 0.0 744.0 0.0 1637596 543065 518542 100.0 100.0 104.6 100.6 0.0 8760 8501.0 0.0 8422.6 0.0 1823291'I 5939690 5657345 96.1 96.1 97.0 93.2 1.8 184737.6 121260.3 844.4 1 19533.4 121.8 248139838 79581816 75269505 64.7 64.8 62.2 58.8 11.8 25=I f SttUI'OWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP f V I  
~p'a ! e I
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT          llKRH POINT 3 DATE COMPLETED BY TELEPHONE MONTH DECEMBER   1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/93   701 12/02/93   700 12/03/93   699 12/04/93   695 12/05/93   690 12/06/93   692 12/07/93   697 12/08/93   696 12/09/93   693 12/10/93   692 12/11/93   690 12/12/93   703 12/13/93   700 12/14/93   698 12/15/93   697 12/16/93   706 12/17/93   700 12/18/93   704 12/19/93   698 12/20/93   693 12/21/93   692 12/22/93   695 12/23/93   693 12/24/93   694 12/25/93   698 12/26/93   703 3.2/27/93 705 12/28/93   702 12/29/93   694 12/30/93   693 12/31/93   693
 
J UNIT     SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.               50-250 UNlT NAME:
DATE:                     anuar COMPLETED BY:             .     . norr TELEPHONE REPORT MONTH DECEMBER 1993 No     Date Type'uration (Hours)
Reasons Method Shutting of Licensee Event Spstep   Comgnept               Cause 4 Corrective Action to Down    Reportt                                      Prevent Recurrence Reactors NA     N/A NIA   0.0         N/A     N/A         N/A         N/A         NIA                   N/A F Forced              Reason                        Method                        Exhibit G - Instructions        Exhibit 1    same Source s scheduled           A Equipment Failure         1  Manual                    for Preparation of Data B Maintenance or Test       2  Manual Scram              Entrv Sheets Licensee C Refueling                 3  Automatic Scram          Event Report (LER)  File D Regulatory restriction     4  Continued                (NUREG-0161)
E Operator Traininc 6       5  Load Reduction License Examination       9  Other  (Explain)
F Administrative G Operational Error (Explain)
H   other (Explain)
 
aM I',
V II 1
c'            c' a  I<
if,'yt'f
    ,p N '.
              ~
e<
1
          '<1 L j   C P
 
OPERATING DATA REPORT DOCKET NO           50 250 DATE                   1/ 7/94 COMPLETED BY     J. E. KNORR TELEPHONE       305/246/6757 OPERAT I NG STATUS
: 1. UNIT NAME: TURKEY POINT           UNIT 3 REf>OH f ING PERIOD: DECEMBER 1993 L I CLffSED Tt IERMAL POWER (MWT ):                 2200
: 4. NAMf:PLATL ttaIING (GROSS MWE):                         760
: b. DLSl(AN ELECTRI(.AL RATING (NET MWL):                   693 6 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):                 699
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):                 666 8     It" CffANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7)
SINCE AST REPORT GIVE REASONS:
t            ~
9   POWt.R LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE)
'IO   HLASONS FOR HFSTRICfIONS ~ IF ANY>>
MONTHLY   - YTD-   CUMULATIVE 1 1. 1(, HS Itt REPORf PERIOD:
      ~                                                    744      8760          184737.6
: 12. NUMBER OF ttOURS REACTOR WAS CRITICAL                   744.0    8501.0        121260. 3
: 13. fct-af lOR RFSERVE SHUTDOWN HOURS                         0.0        0.0          844.4
: 14. tfOt)HS GENERATOR ON-LING                               744.0    8422.6        1 19533. 4 15, uutl fEEsLRvh SrfufDowN H0URs                             0.0        0.0          121.8 16     GfCO   5   IftERMA'tEERGY GENERAfEO   (MWH)       1637596  1823291'I    248139838 ff. Gffo' El ECTRICAL FNCRGY GENERATED (MWH)             543065    5939690      79581816
'tl. NF,I LLFCTRICAI. ENERGY GENERATED (MWH)             518542    5657345      75269505 IU. UNII EENVICE FACTOR                                   100. 0      96. 1          64.7
: 20. UNIT AVAILAUIIITY FACTOR                             100. 0      96. 1          64.8
: 21. caPAcll Y         I aclOR (UsING Muc NET)               104. 6      97. 0          62.2 2>>". CAPAC11Y FAC1'OH (USING DER NET)                       100. 6      93.2            58.8
: 23. utEIT I-ORCEO Outa(.E RATE                                 0.0        1.8            11.8
: 24. SffulDOWNS SCHBt)tfLFD OVER NEXT 6 MONTHS
          ,CYCLE 14 REFUELING OU1AGE SCtfEt)ul.ED 4/94 25 =   I f SttUI'OWN AT     END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP f
 
V I


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE COMPLETED BY TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT:           ur e  own DATE           anuar COMPLETED BY           orr TELEPHONE:
50-250 ur e own anuar orr REPORT MONTH DECEMBER 1993 Unit 3 began the month of December at 100%power and retained that status through the end of the month.
REPORT MONTH DECEMBER 1993 Unit 3 began the month of December at 100% power and retained that status through the end of the month.
I E AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-251 TURTKP POINT 4 ANUA E.N R MONTH DECEMBER 1993 AVERAGE DAILY POWER LEVEL (MWe-Net)12/01/93 699 12/02/93 699 12/03/93 697 12/04/93 695 12/05/93 690 12/06/93 691 12/07/93 695 12/08/93 695 12/09/93 694 12/10/93 694 12/11/92 693 12/12/93 701 12/13/93 704 12/14/93 701 12/15/93 698 12/16/93 701 12/17/93 704 12/18/93 703 12/19/93 698 12/20/93 694 12/21/93 691 12/22/93 694 12/23/93 693 12/24/93 695 12/25/93 698 12/26/93 704 12/27/93 704 12/28/93 701 12/29/93 695 12/30/93 690 12/31/93 693  
 
'E F IV 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
I E
50-251 REPORT MONTH DECEMBER 1993 No.Date Type~Duration (Hours)Reason*Method of Shutting Down , Reactors Licensee Event Reports Sgs t e(m Componept Code Cause 4 Corrective Action to Prevent Recurrence N/A N/A N/A 0.0 N/A N/A N/A N/A N/A N/A F-Forced s-scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Sczam 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions foz Preparation of Data EntrV Sheets Licensee Event Report (LER)File (NUREG-0161)
 
Exhibit 1-same source 1"l~~I II<<~-~I'1  
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT        TURTKP POINT 4 DATE          ANUA COMPLETED BY    E. N R TELEPHONE MONTH DECEMBER 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/93 699 12/02/93 699 12/03/93 697 12/04/93 695 12/05/93 690 12/06/93 691 12/07/93 695 12/08/93 695 12/09/93 694 12/10/93 694 12/11/92 693 12/12/93 701 12/13/93 704 12/14/93 701 12/15/93 698 12/16/93 701 12/17/93 704 12/18/93 703 12/19/93 698 12/20/93 694 12/21/93 691 12/22/93 694 12/23/93 693 12/24/93 695 12/25/93 698 12/26/93 704 12/27/93 704 12/28/93 701 12/29/93 695 12/30/93 690 12/31/93 693
~C~~,  
 
IV 4
'E F
 
UNIT     SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.               50-251 UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
REPORT MONTH DECEMBER 1993 No. Date   Type~ Duration (Hours)
Reason*   Method of Shutting Licensee Event       Sgs t e(m Componept Code Cause 4 Corrective Action to Down      Reports                                          Prevent Recurrence Reactors ,
N/A       N/A N/A   0.0         N/A       N/A         N/A           N/A           N/A                             N/A F Forced                  Reason                        Method                            Exhibit G - Instructions      Exhibit 1 - same source s scheduled               A Equipment   Failure       1  Manual                        foz Preparation of Data B Maintenance or Test       2  -  Manual Sczam                EntrV Sheets Licensee C Refueling                                                     Event Report (LER) File D Regulatory restriction 3
4  - Automatic Continued Scram (NUREG-0161)
E Operator Training &       5      Load Reduction License Examination       9  Other (Explain)
F - Administrative G Operational Error (Explain)
H Other (Explain)
 
1 "l
          ~   ~ I II << ~
          - ~     I' 1
 
~ C ~ ~,


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETED BY: TELEPHONE'0-251 ur e oxn anua orr REPORT MONTH DECEMBER 1993 Unit 4 began the montn of December at 100~-power and retained that status through the end of the month.
OF OPERATING EXPERIENCE DOCKET NO.
J.0 1~i g OPERaflNG STA'rUS OPERATING DATA REPORT DOCKET NO 50-251 DATE 1/7/94 COMPLETED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNI 1'AME: TURKEY POINT UNIT 4 2, REf'ORTING PERIOD: DECEMBER 1993 3.LICENSED THERMAL POWER (MWT): 2200 NAMEPLATE RATING (GROSS MwE): 760 5.DESIGN ELECTRICAL RATING (NET MWF.): 693 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RAl'INGS (ITEMS NUMBER 3 THROUGH 7)StNCE LAST REPORT.GIVE REASONS: 9.POwER LEVFL TO wHICH RESTRICTED.
UNIT:           ur e    oxn DATE:
IF aNY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: o MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 'e 2.NUMBER OF HOURS REACTOR WAS CRIT'AL 13.REAC1'OR RESERVE SHUTDOWN HOURS 14.HOURS GFNERATOR ON-LINE 15.UN11 RESERVE SHUTDOWN HOURS 16 GROSS iHERMat.ENERGY GENERa'rFD (MwH)17 GROSS I:LL'CTRICAL ENERGY GENERATED (MWH)18.tetr El.ECTRICAL ENERGY GENERATEO (MWH)19.UNll SERVICE FaCTOR 20.UNIT AVAILABlt,lTY FACTOR 21.capacil'Y Factok (osING MDG NET)22.caknCI1Y FAclDR (UsING DER NET)23.UNtl FORCED OitraGE RaTE 24.SHUIDOWNS SCHt".RULED OVER NEXT 6 MONTHS NONE 744 744.0 0.0 744.0 0.0 1637791 542820 518449 100.0 100.0 104.6 100.6 0.0 8760 7441.7 0.0 7279.7 0.0 15485620 4995000 4746291 83.1 83.1 81.4 78.2 2.0 178469.0 117280.3 166.6 113325.0 577.3 239059955 76353970 72235232 63.5 63.8 61.8 58.4 11.4 25.1F SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:  
TELEPHONE'0-251 anua COMPLETED BY:          orr REPORT MONTH   DECEMBER 1993 Unit 4 began the montn of December at 100~- power and retained that status through the end of the month.
(~I}}
 
J
    .0   1~
i g
 
OPERATING DATA REPORT DOCKET NO           50 - 251 DATE                   1/ 7/94 COMPLETED BY     J. E. KNORR TELEPHONE       305/246/6757 OPERaflNG STA'rUS
: 1. UNI 1'AME: TURKEY POINT     UNIT 4 2, REf'ORTING PERIOD: DECEMBER 1993
: 3. LICENSED THERMAL POWER (MWT):                   2200 NAMEPLATE RATING (GROSS MwE):                   760
: 5. DESIGN ELECTRICAL RATING (NET MWF.):             693
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):         699
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):           666
: 8. IF   CHANGES OCCUR IN CAPACITY RAl'INGS (ITEMS NUMBER 3 THROUGH 7)
StNCE LAST REPORT. GIVE REASONS:
: 9. POwER LEVFL TO wHICH RESTRICTED. IF aNY (NET MWE)
: 10. REASONS FOR RESTRICTIONS, IF ANY:
o MONTHLY   -YTD- CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                             744      8760        178469.0
'e
: 2. NUMBER OF HOURS REACTOR WAS CRIT'AL             744.0    7441. 7      117280.3
: 13. REAC1'OR RESERVE SHUTDOWN HOURS                   0.0        0.0          166.6
: 14. HOURS GFNERATOR ON-LINE                         744.0    7279.7      113325.0
: 15. UN11 RESERVE SHUTDOWN HOURS                       0.0        0.0          577.3 16     GROSS iHERMat. ENERGY GENERa'rFD (MwH)       1637791    15485620      239059955 17     GROSS I:LL'CTRICAL ENERGY GENERATED (MWH)       542820    4995000      76353970
: 18. tetr El.ECTRICAL ENERGY GENERATEO (MWH)         518449    4746291      72235232
: 19. UNll SERVICE FaCTOR                                 100. 0      83.1            63.5
: 20. UNIT AVAILABlt,lTYFACTOR                            100. 0      83.1            63.8
: 21. capacil'Y Factok (osING MDG NET)                   104. 6      81.4            61. 8
: 22. caknCI1Y FAclDR (UsING DER NET)                     100. 6      78.2            58.4
: 23. UNtl FORCED OitraGE RaTE                             0.0        2.0            11.4
: 24. SHUIDOWNS SCHt".RULED OVER NEXT 6     MONTHS NONE
: 25. 1F SHUT DOWN AT END OF REPORT   PERIOD, ESTIMATED DATE OF STARTUP:
 
(~
I}}

Latest revision as of 21:36, 3 February 2020

Monthly Operating Repts for Dec 1993 for Turkey Point Units 3 & 4.W/940113 Ltr
ML17352A377
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/31/1993
From: Knorr J, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-008, L-94-8, NUDOCS 9401240146
Download: ML17352A377 (20)


Text

Y E~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CQSU4N4 DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION Florida Power 6 Light Co.

KNORR,J.E.

PLUNKETT,T.F. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly o e 'ng repts for Dec 1993 for Turkey Point Units 3 & 4. 113 tr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 PD 1 1 RAGHAVAN,L 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 D N DORS 0 1 1 NRR/DRIL/RPEB 1 1 EG WIXR 01 1 1 RGN2 1 1 EXTERNAL EGGG BRYCE i J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

.. Box 029100, Miami, FL, 33102-9100 Jp,N l3 19M L-94-008 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9 '.5, and the guidance of NUREG-0020, attached are the December 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very Truly Yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/JEK/jk attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant s~.j. OO 8 pg PDR R 'DR 9401240146 931231 ADOCK 05000250 an PPL Group company ZEND

//(

F gO

~ $ +>

~p'a ! e I

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT llKRH POINT 3 DATE COMPLETED BY TELEPHONE MONTH DECEMBER 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/93 701 12/02/93 700 12/03/93 699 12/04/93 695 12/05/93 690 12/06/93 692 12/07/93 697 12/08/93 696 12/09/93 693 12/10/93 692 12/11/93 690 12/12/93 703 12/13/93 700 12/14/93 698 12/15/93 697 12/16/93 706 12/17/93 700 12/18/93 704 12/19/93 698 12/20/93 693 12/21/93 692 12/22/93 695 12/23/93 693 12/24/93 694 12/25/93 698 12/26/93 703 3.2/27/93 705 12/28/93 702 12/29/93 694 12/30/93 693 12/31/93 693

J UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNlT NAME:

DATE: anuar COMPLETED BY: . . norr TELEPHONE REPORT MONTH DECEMBER 1993 No Date Type'uration (Hours)

Reasons Method Shutting of Licensee Event Spstep Comgnept Cause 4 Corrective Action to Down Reportt Prevent Recurrence Reactors NA N/A NIA 0.0 N/A N/A N/A N/A NIA N/A F Forced Reason Method Exhibit G - Instructions Exhibit 1 same Source s scheduled A Equipment Failure 1 Manual for Preparation of Data B Maintenance or Test 2 Manual Scram Entrv Sheets Licensee C Refueling 3 Automatic Scram Event Report (LER) File D Regulatory restriction 4 Continued (NUREG-0161)

E Operator Traininc 6 5 Load Reduction License Examination 9 Other (Explain)

F Administrative G Operational Error (Explain)

H other (Explain)

aM I',

V II 1

c' c' a I<

if,'yt'f

,p N '.

~

e<

1

'<1 L j C P

OPERATING DATA REPORT DOCKET NO 50 250 DATE 1/ 7/94 COMPLETED BY J. E. KNORR TELEPHONE 305/246/6757 OPERAT I NG STATUS

1. UNIT NAME: TURKEY POINT UNIT 3 REf>OH f ING PERIOD: DECEMBER 1993 L I CLffSED Tt IERMAL POWER (MWT ): 2200
4. NAMf:PLATL ttaIING (GROSS MWE): 760
b. DLSl(AN ELECTRI(.AL RATING (NET MWL): 693 6 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8 It" CffANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7)

SINCE AST REPORT GIVE REASONS:

t ~

9 POWt.R LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE)

'IO HLASONS FOR HFSTRICfIONS ~ IF ANY>>

MONTHLY - YTD- CUMULATIVE 1 1. 1(, HS Itt REPORf PERIOD:

~ 744 8760 184737.6

12. NUMBER OF ttOURS REACTOR WAS CRITICAL 744.0 8501.0 121260. 3
13. fct-af lOR RFSERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. tfOt)HS GENERATOR ON-LING 744.0 8422.6 1 19533. 4 15, uutl fEEsLRvh SrfufDowN H0URs 0.0 0.0 121.8 16 GfCO 5 IftERMA'tEERGY GENERAfEO (MWH) 1637596 1823291'I 248139838 ff. Gffo' El ECTRICAL FNCRGY GENERATED (MWH) 543065 5939690 79581816

'tl. NF,I LLFCTRICAI. ENERGY GENERATED (MWH) 518542 5657345 75269505 IU. UNII EENVICE FACTOR 100. 0 96. 1 64.7

20. UNIT AVAILAUIIITY FACTOR 100. 0 96. 1 64.8
21. caPAcll Y I aclOR (UsING Muc NET) 104. 6 97. 0 62.2 2>>". CAPAC11Y FAC1'OH (USING DER NET) 100. 6 93.2 58.8
23. utEIT I-ORCEO Outa(.E RATE 0.0 1.8 11.8
24. SffulDOWNS SCHBt)tfLFD OVER NEXT 6 MONTHS

,CYCLE 14 REFUELING OU1AGE SCtfEt)ul.ED 4/94 25 = I f SttUI'OWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP f

V I

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: ur e own DATE anuar COMPLETED BY orr TELEPHONE:

REPORT MONTH DECEMBER 1993 Unit 3 began the month of December at 100% power and retained that status through the end of the month.

I E

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT TURTKP POINT 4 DATE ANUA COMPLETED BY E. N R TELEPHONE MONTH DECEMBER 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/93 699 12/02/93 699 12/03/93 697 12/04/93 695 12/05/93 690 12/06/93 691 12/07/93 695 12/08/93 695 12/09/93 694 12/10/93 694 12/11/92 693 12/12/93 701 12/13/93 704 12/14/93 701 12/15/93 698 12/16/93 701 12/17/93 704 12/18/93 703 12/19/93 698 12/20/93 694 12/21/93 691 12/22/93 694 12/23/93 693 12/24/93 695 12/25/93 698 12/26/93 704 12/27/93 704 12/28/93 701 12/29/93 695 12/30/93 690 12/31/93 693

IV 4

'E F

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH DECEMBER 1993 No. Date Type~ Duration (Hours)

Reason* Method of Shutting Licensee Event Sgs t e(m Componept Code Cause 4 Corrective Action to Down Reports Prevent Recurrence Reactors ,

N/A N/A N/A 0.0 N/A N/A N/A N/A N/A N/A F Forced Reason Method Exhibit G - Instructions Exhibit 1 - same source s scheduled A Equipment Failure 1 Manual foz Preparation of Data B Maintenance or Test 2 - Manual Sczam EntrV Sheets Licensee C Refueling Event Report (LER) File D Regulatory restriction 3

4 - Automatic Continued Scram (NUREG-0161)

E Operator Training & 5 Load Reduction License Examination 9 Other (Explain)

F - Administrative G Operational Error (Explain)

H Other (Explain)

1 "l

~ ~ I II << ~

- ~ I' 1

~ C ~ ~,

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT: ur e oxn DATE:

TELEPHONE'0-251 anua COMPLETED BY: orr REPORT MONTH DECEMBER 1993 Unit 4 began the montn of December at 100~- power and retained that status through the end of the month.

J

.0 1~

i g

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 1/ 7/94 COMPLETED BY J. E. KNORR TELEPHONE 305/246/6757 OPERaflNG STA'rUS

1. UNI 1'AME: TURKEY POINT UNIT 4 2, REf'ORTING PERIOD: DECEMBER 1993
3. LICENSED THERMAL POWER (MWT): 2200 NAMEPLATE RATING (GROSS MwE): 760
5. DESIGN ELECTRICAL RATING (NET MWF.): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RAl'INGS (ITEMS NUMBER 3 THROUGH 7)

StNCE LAST REPORT. GIVE REASONS:

9. POwER LEVFL TO wHICH RESTRICTED. IF aNY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

o MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 8760 178469.0

'e

2. NUMBER OF HOURS REACTOR WAS CRIT'AL 744.0 7441. 7 117280.3
13. REAC1'OR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GFNERATOR ON-LINE 744.0 7279.7 113325.0
15. UN11 RESERVE SHUTDOWN HOURS 0.0 0.0 577.3 16 GROSS iHERMat. ENERGY GENERa'rFD (MwH) 1637791 15485620 239059955 17 GROSS I:LL'CTRICAL ENERGY GENERATED (MWH) 542820 4995000 76353970
18. tetr El.ECTRICAL ENERGY GENERATEO (MWH) 518449 4746291 72235232
19. UNll SERVICE FaCTOR 100. 0 83.1 63.5
20. UNIT AVAILABlt,lTYFACTOR 100. 0 83.1 63.8
21. capacil'Y Factok (osING MDG NET) 104. 6 81.4 61. 8
22. caknCI1Y FAclDR (UsING DER NET) 100. 6 78.2 58.4
23. UNtl FORCED OitraGE RaTE 0.0 2.0 11.4
24. SHUIDOWNS SCHt".RULED OVER NEXT 6 MONTHS NONE
25. 1F SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

(~

I