ML17353A639: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:r r'ATEGORY 1 REGULATON INFORMATION DISTRISUTION
{{#Wiki_filter:r r'ATEGORY                                               1 REGULATON INFORMATION DISTRISUTION %STEM (RIDE)
%STEM (RIDE)DOCKET FACIL:50-250 Turkey Point Plant, Unit 3",-Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION KNORR,J.E.
DOCKET FACIL:50-250 Turkey Point Plant, Unit 3",- Florida Power and Light             C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light             C 05000251 AUTH. NAME           AUTHOR AFFILIATION KNORR,J.E.           Flora,da Power 6 Light Co.
Flora,da Power 6 Light Co.HOVEY,R.J.
HOVEY,R.J.           Florida   Power 6 Light Co.
Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthl ing repts for Mar 1996 for Turkey Point units 1 a.960415 r.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL L I TCO BRYCE F J H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CROTEAU,R FILE CENTER 1 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 NOTE TO ALL"RZDS" RECZPZENTS:
Monthl             ing repts for Mar 1996 for Turkey Point units 1 a   . 960415     r.
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT 415"2083)TO ELZMZNATE YOUR NAME FROM DZSTRZBUTZON LZSTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUERED: LTTR 9 ENCL~9  
DISTRIBUTION CODE: IE24D       COPIES RECEIVED:LTR         ENCL       SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT           COPIES            RECIPIENT          COPIES ID CODE/NAME         LTTR ENCL        ID CODE/NAME        LTTR ENCL PD2-1 PD                 1    1      CROTEAU,R              1    1 INTERNAL: AEOD/SPD/RRAB             1    1      FILE  CENTER      1    1    1 NRR/DRPM/PECB             1    1                              1    1 EXTERNAL   I L TCO BRYCE F J H         1   1       NOAC                   1   1 NRC PDR                  1   1 NOTE TO ALL "RZDS" RECZPZENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT 415"2083) TO ELZMZNATE YOUR NAME FROM DZSTRZBUTZON LZSTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUERED:       LTTR     9   ENCL   ~ 9


APR go)gg6 L-96-092 10 CFR 550.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
APR go )gg6 L-96-092 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn:   Document Control Desk Washington, D. C. 20555 Gentlemen:
Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, R.J.Hovey Vice President Turkey Point Plant JEK Attachments cc: S.D.Ebneter, Regional Administrator, Region II,USNRC.T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 220028 9604220l.69 960335.PDR ADQCK 05000250 R PDR an FPL Group company K~JI AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net)03/01/96 03/02/96 03/03/96 03/04/96 03/05/96 03/06/96 03/07/96 03/08/9603/09/96 03/10/96 03/11/96 03/12/96 03/13/96 03/14/96 , 03/15/96 03/16/96 03/17/96 03/18/96 03/19/96 03/20/96 03/21/96 03/22/96 03/23/96 03/24/96 03/25/96 03/26/96 03/27/96 03/28/96 03/29/96 03/30/96 03/31/96 683 692 702 677 706 700 695 696 706 711 711 712 708 705 702 698 696 695 693 701 706 707 707 704 702 698 500 0 229 676 684 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE COMPLETED BY TELEPHONE:
Re:   Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
REPORT MONTH No Date Type Duration (Hours)Reason*Ymthod of Shutting Down Reactor'icensee Event Reportt Systen code'o=ponent code'ause 6 Corrective Action to Prevent Recurrence 08 960327 34.5 96-006 IP RELAYX NON-SAFETY RELAY ACTUATION F-Forced S-Scheduled Reason A-Equipnent Failure B-Ymintenance or Test C-Refueling D-Regulatory restriction E-Operator Training 6 License Exanination F-Adninlstratlve G-Operational Error (Explain)H-Other (Explain)Method 1-Yenual 2-Yanual Scran 3-Auto atic Scrau 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG-0161)
Very truly   yours, R. J. Hovey Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC.
Exhibit 1-Sane Source
T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 220028 9604220l.69 960335.
'F'1~
PDR   ADQCK 05000250 R                   PDR an FPL Group company
OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-250 DATE 4/8/96 PREPARED BY 8.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 3 2.REPORTING PERIOD: MARCH 1996 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET: 693 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MATE]: 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEHB NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.I 10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HO 17.GROSS ELECTRICAL ENERGY GENERATED (MWH7 18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FA 21.CAPACITY FACTOR (USING MD 22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NONE 744 719.6 0.0 709.5 0.0 T532139 510722 487269 95.4 95.4 98.3 94.5 4.6 2184 2013.9 0.0 1980.1 0.0 4T63'366 1373032 1308954 90.7 90.7 90.0 86.5 9.3 204441.6 138919.7 844.4 136875.8 121.8 2%5T94385 91610017 86722350 67.0 67.0 64.6 61.2 10.7 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
DOCKET NO.UNIT DATE: COMPLETED BY: TELEPHONE:
REPORT MONTH Unit 3 began operation for the month at 100%reactor power.On March 27, the actuation of a non-safety relay caused a main steam generator feedwater pump trip.As a result the plant was manually tripped.A reactor startup occurred on March 29.The reactor returned to 100%power on March 30 and remained at essentially that level through the remainder of the month.


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net)03/01/96 03/02/96 03/03/96 03/04/96 03/05/96 03/06/96 03/07/96 03/08/96 03/09/96 03/10/96 03/11/96 03/12/96 03/13/96 03/14/96 03/15/96 03/16/96 03/17/96 03/18/96 03/19/96 03/20/96 03/21/96 03/22/96 03/23/96 03/24/96 03/25/96 03/26/96 03/27/96 03/28/96 03/29/96 03/30/96 03/31/96 654 397 311 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
K
~ JI


UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY TELEPHONE:
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
REPORT MONTH No Date Type Duration (Hours)Reason'ethod of Shutting Down Reactor'icensee Event Reports System Code'omponent Code'ause&Corrective Action to Prevent Recurrence 01 960302 0.0 N/A N/A N/A Reduced powez prior to refueling F-Forced s-scheduled Reason A-Equipment Failure B-Ynintenance or Test C-Refueling D-Regulatory restriction E-Operator Training 6 License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entzy Sheets Licensee Event Report (LER)File (NUREG-0161)
UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 03/01/96    683 03/02/96    692 03/03/96  702 03/04/96    677 03/05/96  706 03/06/96  700 03/07/96    695 03/08/96    696 03/09/96  706 03/10/96  711 03/11/96    711 03/12/96  712 03/13/96    708 03/14/96    705 03/15/96    702 03/16/96    698 03/17/96    696 03/18/96    695 03/19/96    693 03/20/96    701 03/21/96    706 03/22/96    707 03/23/96    707 03/24/96    704 03/25/96    702 03/26/96    698 03/27/96    500 03/28/96      0 03/29/96    229 03/30/96    676 03/31/96    684
Exhibit 1-Same Source I E OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-251 DATE 4/8/96 PREPARED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 4 2.REPORTING PERIOD: MARCH 1996 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET: 693 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MHE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEHS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER, OF HOURS REACTOR 13.REACTOR RESERVE SHUTDOWN HOURS 14.-HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HO 17.GROSS ELECTRICAL ENERGY GENERATED (MWHJ 18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FA 21.CAPACITY FACTOR (USING MD 22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NONE 744 72.4 0.0 72.2 0.0 TT3083 34730 32680 9.7 9.7 6.6 6.3 0.0 2184 1512.4 0.0 1512.2 0.0 Y2'72928 1081294 1032192 69.2 69.2 71.0 68.2 0.0 198173.0 134998.2 166.6 130905.4 577.2 YTEF46185 88620435 83917107 66.1 66.3 64.5 61.1 10.2 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 4-8-96 DOCKET NO.UNIT DATE: COMPLETE BY TELEPHONE:
 
REPORT MONTH Unit 4 operated at essentially 100<reactor power on March 1, 1996 continuing a T,,/power coast down prior to the scheduled refueling outage.A power reduction to approximately 604 power was made on March 2.A further power reduction to 304 was made on March 3.The unit was shut down for the cycle 16 refueling-outage on March 4 and remained shut down for the remainder of the month.
UNIT    SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
0 lf~-1~~la g'e R 4iiLQqWWQW'e+
UNIT NAME:
h~~~~g4 ww I i E<<i<Ab AO M}}
DATE COMPLETED BY TELEPHONE:
REPORT MONTH No         Date Type       Duration (Hours)
Reason*    Ymthod of           Event code'o=ponent Systen          code'ause         6 Corrective Action to Prevent Recurrence Reactor'icensee Shutting Down Reportt 08        960327              34.5                                  96-006    IP        RELAYX    NON-SAFETY RELAY ACTUATION F - Forced                 Reason                      Method                  Exhibit  G - Instructions Exhibit  1 - Sane Source S - Scheduled              A Equipnent  Failure      1 - Yenual              for Preparation of  Data B - Ymintenance or Test     2 - Yanual Scran        Entry Sheets Licensee C - Refueling               3 - Auto atic Scrau      Event Report (LER)  File D - Regulatory restriction   4 - Continued            (NUREG-0161)
E - Operator Training 6     5 - Load Reduction License Exanination    9 - Other (Explain)
F - Adninlstratlve G - Operational Error (Explain)
H - Other (Explain)
 
    'F
'1~
 
OPERATING DATA REPORT DOCKET NO           50 - 250 DATE                 4/ 8/96 PREPARED BY     8. E. KNORR TELEPHONE       305/246/6757 OPERATING STATUS
: 1. UNIT NAME: TURKEY POINT   UNIT 3
: 2. REPORTING PERIOD:   MARCH 1996
: 3. LICENSED THERMAL POWER (MWT):                 2200
: 4. NAMEPLATE RATING (GROSS MWE):                   760
: 5. DESIGN ELECTRICAL RATING (NET     :           693
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MATE]:       699
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):         666
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEHB NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
: 9.                                 I
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY   -YTD-   CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                        744      2184        204441.6
: 12. NUMBER OF HOURS REACTOR                         719. 6    2013.9      138919.7
: 13. REACTOR RESERVE SHUTDOWN HOURS                   0.0        0.0        844.4
: 14. HOURS GENERATOR ON-LINE                         709.5    1980.1      136875.8
: 15. UNIT RESERVE SHUTDOWN HO                         0.0        0.0        121.8 T532139    4T63'366    2%5T94385
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH7        510722    1373032      91610017
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)         487269    1308954      86722350
: 19. UNIT SERVICE FACTOR                             95.4      90.7          67.0
: 20. UNIT AVAILABILITYFA                              95.4      90.7          67.0
: 21. CAPACITY FACTOR (USING MD                       98.3      90.0          64.6
: 22. CAPACITY FACTOR (USING DER NET)                 94.5      86.5          61.2
: 23. UNIT FORCED OUTAGE RATE                           4.6        9.3          10.7
: 24. SHUTDOWNS SCHEDULED OVER NONE
: 25. IF  SHUT DOWN AT END OF REPORT PERIOD,  ESTIMATED DATE OF STARTUP:
 
DOCKET NO.
UNIT DATE:
COMPLETED BY:
TELEPHONE:
REPORT MONTH Unit 3 began operation  for the month at 100% reactor power. On March 27, the actuation  of a non-safety relay caused a main steam generator feedwater pump trip. As a result the plant was manually tripped. A reactor startup occurred on March 29. The reactor returned to 100% power on March 30 and remained at essentially that level through the remainder of the month.
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 03/01/96  654 03/02/96  397 03/03/96  311 03/04/96      0 03/05/96      0 03/06/96      0 03/07/96      0 03/08/96      0 03/09/96      0 03/10/96      0 03/11/96      0 03/12/96      0 03/13/96      0 03/14/96      0 03/15/96      0 03/16/96      0 03/17/96      0 03/18/96      0 03/19/96      0 03/20/96      0 03/21/96      0 03/22/96      0 03/23/96      0 03/24/96      0 03/25/96      0 03/26/96      0 03/27/96      0 03/28/96      0 03/29/96      0 03/30/96      0 03/31/96      0
 
UNIT SHUTDOWNS AND              POWER REDUCTIONS DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY TELEPHONE:
REPORT MONTH No        Date  Type  Duration (Hours)
Reason'ethod of Reactor'icensee Shutting Event Reports Code'omponent System          Code'ause                &  Corrective Action to Prevent Recurrence Down 01        960302            0.0                                       N/A    N/A            N/A        Reduced powez  prior to refueling F - Forced            Reason                        Method                    Exhibit  G - Instructions      Exhibit    -  Same Source
  -                  A  Equipment                  1  Manual              for Preparation of 1
s  scheduled B  - YnintenanceFailure or Test      2 - Manual Scram Data Entzy Sheets Licensee C  Refueling                3  - Automatic Scram      Event Report (LER) File D  - Regulatory restriction    4  - Continued            (NUREG-0161)
E  Operator  Training 6      5  - Load Reduction License Examination      9 - Other (Explain)
F  -  Administrative G - Operational Error (Explain)
H  -  Other (Explain)
 
I E
 
OPERATING DATA REPORT DOCKET NO          50 - 251 DATE                4/ 8/96 PREPARED BY    J. E. KNORR TELEPHONE      305/246/6757 OPERATING STATUS
: 1. UNIT NAME: TURKEY POINT    UNIT  4
: 2. REPORTING PERIOD:      MARCH 1996
: 3. LICENSED THERMAL POWER (MWT):                  2200
: 4. NAMEPLATE RATING (GROSS MWE):                    760
: 5. DESIGN ELECTRICAL RATING (NET        :          693
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MHE):        699
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):          666
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEHS  NUMBER 3 THROUGH    7)
SINCE LAST REPORT, GIVE REASONS:
9.
: 10. REASONS FOR RESTRICTIONS,  IF ANY:
MONTHLY  -YTD-    CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                          744      2184        198173.0
: 12. NUMBER, OF HOURS REACTOR                          72.4    1512.4     134998.2
: 13. REACTOR RESERVE SHUTDOWN HOURS                    0.0        0.0         166.6
: 14. HOURS GENERATOR ON-LINE 72.2    1512.2     130905.4
: 15. UNIT RESERVE SHUTDOWN HO                          0.0       0.0        577.2 TT3083  Y2'72928   YTEF46185
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWHJ          34730  1081294     88620435
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)            32680  1032192     83917107
: 19. UNIT SERVICE FACTOR                                9.7      69.2         66.1
: 20. UNIT AVAILABILITYFA                                9.7      69.2         66.3
: 21. CAPACITY FACTOR (USING MD                          6.6      71.0         64.5
: 22. CAPACITY FACTOR (USING DER NET)                    6.3      68.2         61. 1
: 23. UNIT FORCED OUTAGE RATE                            0.0        0.0          10.2
: 24. SHUTDOWNS SCHEDULED OVER NONE
: 25. IF   SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:     4-8-96
 
DOCKET NO.
UNIT DATE:
COMPLETE BY TELEPHONE:
REPORT MONTH Unit 4 operated at essentially 100< reactor power on March 1, 1996 continuing a T,,/power coast down prior to the scheduled refueling outage. A power reduction to approximately 604 power was made on March 2. A further power reduction to 304 was made on March 3. The unit was shut down for the cycle 16 refueling outage on March 4 and remained shut down for the remainder of the month.
 
0 lf ~
                            -1                     ~ ~
la g
              'e R 4
iiLQqWWQW'e+
h
                                          ~ ~
                                                  ~~
g4 ww Ii E << i<Ab                         AO M}}

Latest revision as of 21:23, 3 February 2020

Monthly Operating Repts for Mar 1996 for Turkey Point Units 1 & 2.W/960415 Ltr
ML17353A639
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/31/1996
From: Hovey R, Knorr J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-092, L-96-92, NUDOCS 9604220169
Download: ML17353A639 (17)


Text

r r'ATEGORY 1 REGULATON INFORMATION DISTRISUTION %STEM (RIDE)

DOCKET FACIL:50-250 Turkey Point Plant, Unit 3",- Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Flora,da Power 6 Light Co.

HOVEY,R.J. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthl ing repts for Mar 1996 for Turkey Point units 1 a . 960415 r.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CENTER 1 1 1 NRR/DRPM/PECB 1 1 1 1 EXTERNAL I L TCO BRYCE F J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RZDS" RECZPZENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT 415"2083) TO ELZMZNATE YOUR NAME FROM DZSTRZBUTZON LZSTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUERED: LTTR 9 ENCL ~ 9

APR go )gg6 L-96-092 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC.

T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 220028 9604220l.69 960335.

PDR ADQCK 05000250 R PDR an FPL Group company

K

~ JI

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 03/01/96 683 03/02/96 692 03/03/96 702 03/04/96 677 03/05/96 706 03/06/96 700 03/07/96 695 03/08/96 696 03/09/96 706 03/10/96 711 03/11/96 711 03/12/96 712 03/13/96 708 03/14/96 705 03/15/96 702 03/16/96 698 03/17/96 696 03/18/96 695 03/19/96 693 03/20/96 701 03/21/96 706 03/22/96 707 03/23/96 707 03/24/96 704 03/25/96 702 03/26/96 698 03/27/96 500 03/28/96 0 03/29/96 229 03/30/96 676 03/31/96 684

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE COMPLETED BY TELEPHONE:

REPORT MONTH No Date Type Duration (Hours)

Reason* Ymthod of Event code'o=ponent Systen code'ause 6 Corrective Action to Prevent Recurrence Reactor'icensee Shutting Down Reportt 08 960327 34.5 96-006 IP RELAYX NON-SAFETY RELAY ACTUATION F - Forced Reason Method Exhibit G - Instructions Exhibit 1 - Sane Source S - Scheduled A Equipnent Failure 1 - Yenual for Preparation of Data B - Ymintenance or Test 2 - Yanual Scran Entry Sheets Licensee C - Refueling 3 - Auto atic Scrau Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training 6 5 - Load Reduction License Exanination 9 - Other (Explain)

F - Adninlstratlve G - Operational Error (Explain)

H - Other (Explain)

'F

'1~

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 4/ 8/96 PREPARED BY 8. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: MARCH 1996
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET  : 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MATE]: 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEHB NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. I
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 2184 204441.6
12. NUMBER OF HOURS REACTOR 719. 6 2013.9 138919.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 709.5 1980.1 136875.8
15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 121.8 T532139 4T63'366 2%5T94385
17. GROSS ELECTRICAL ENERGY GENERATED (MWH7 510722 1373032 91610017
18. NET ELECTRICAL ENERGY GENERATED (MWH) 487269 1308954 86722350
19. UNIT SERVICE FACTOR 95.4 90.7 67.0
20. UNIT AVAILABILITYFA 95.4 90.7 67.0
21. CAPACITY FACTOR (USING MD 98.3 90.0 64.6
22. CAPACITY FACTOR (USING DER NET) 94.5 86.5 61.2
23. UNIT FORCED OUTAGE RATE 4.6 9.3 10.7
24. SHUTDOWNS SCHEDULED OVER NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO.

UNIT DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH Unit 3 began operation for the month at 100% reactor power. On March 27, the actuation of a non-safety relay caused a main steam generator feedwater pump trip. As a result the plant was manually tripped. A reactor startup occurred on March 29. The reactor returned to 100% power on March 30 and remained at essentially that level through the remainder of the month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 03/01/96 654 03/02/96 397 03/03/96 311 03/04/96 0 03/05/96 0 03/06/96 0 03/07/96 0 03/08/96 0 03/09/96 0 03/10/96 0 03/11/96 0 03/12/96 0 03/13/96 0 03/14/96 0 03/15/96 0 03/16/96 0 03/17/96 0 03/18/96 0 03/19/96 0 03/20/96 0 03/21/96 0 03/22/96 0 03/23/96 0 03/24/96 0 03/25/96 0 03/26/96 0 03/27/96 0 03/28/96 0 03/29/96 0 03/30/96 0 03/31/96 0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY TELEPHONE:

REPORT MONTH No Date Type Duration (Hours)

Reason'ethod of Reactor'icensee Shutting Event Reports Code'omponent System Code'ause & Corrective Action to Prevent Recurrence Down 01 960302 0.0 N/A N/A N/A Reduced powez prior to refueling F - Forced Reason Method Exhibit G - Instructions Exhibit - Same Source

- A Equipment 1 Manual for Preparation of 1

s scheduled B - YnintenanceFailure or Test 2 - Manual Scram Data Entzy Sheets Licensee C Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161)

E Operator Training 6 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

I E

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 4/ 8/96 PREPARED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: MARCH 1996
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET  : 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MHE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEHS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9.

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 2184 198173.0
12. NUMBER, OF HOURS REACTOR 72.4 1512.4 134998.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 72.2 1512.2 130905.4
15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 577.2 TT3083 Y2'72928 YTEF46185
17. GROSS ELECTRICAL ENERGY GENERATED (MWHJ 34730 1081294 88620435
18. NET ELECTRICAL ENERGY GENERATED (MWH) 32680 1032192 83917107
19. UNIT SERVICE FACTOR 9.7 69.2 66.1
20. UNIT AVAILABILITYFA 9.7 69.2 66.3
21. CAPACITY FACTOR (USING MD 6.6 71.0 64.5
22. CAPACITY FACTOR (USING DER NET) 6.3 68.2 61. 1
23. UNIT FORCED OUTAGE RATE 0.0 0.0 10.2
24. SHUTDOWNS SCHEDULED OVER NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 4-8-96

DOCKET NO.

UNIT DATE:

COMPLETE BY TELEPHONE:

REPORT MONTH Unit 4 operated at essentially 100< reactor power on March 1, 1996 continuing a T,,/power coast down prior to the scheduled refueling outage. A power reduction to approximately 604 power was made on March 2. A further power reduction to 304 was made on March 3. The unit was shut down for the cycle 16 refueling outage on March 4 and remained shut down for the remainder of the month.

0 lf ~

-1 ~ ~

la g

'e R 4

iiLQqWWQW'e+

h

~ ~

~~

g4 ww Ii E << i<Ab AO M