ML17353A639: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:r r'ATEGORY 1 REGULATON INFORMATION DISTRISUTION | {{#Wiki_filter:r r'ATEGORY 1 REGULATON INFORMATION DISTRISUTION %STEM (RIDE) | ||
%STEM (RIDE)DOCKET FACIL:50-250 Turkey Point Plant, Unit 3",-Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION KNORR,J.E. | DOCKET FACIL:50-250 Turkey Point Plant, Unit 3",- Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Flora,da Power 6 Light Co. | ||
Flora,da Power 6 Light Co.HOVEY,R.J. | HOVEY,R.J. Florida Power 6 Light Co. | ||
Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION | RECIP.NAME RECIPIENT AFFILIATION | ||
==SUBJECT:== | ==SUBJECT:== | ||
Monthl ing repts for Mar 1996 for Turkey Point units 1 a.960415 r.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL L | Monthl ing repts for Mar 1996 for Turkey Point units 1 a . 960415 r. | ||
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT 415"2083)TO ELZMZNATE YOUR NAME FROM DZSTRZBUTZON LZSTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUERED: LTTR 9 ENCL~9 | DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: | ||
TITLE: Monthly Operating Report (per Tech Specs) | |||
NOTES: | |||
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CENTER 1 1 1 NRR/DRPM/PECB 1 1 1 1 EXTERNAL I L TCO BRYCE F J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RZDS" RECZPZENTS: | |||
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT 415"2083) TO ELZMZNATE YOUR NAME FROM DZSTRZBUTZON LZSTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUERED: LTTR 9 ENCL ~ 9 | |||
APR go)gg6 L-96-092 10 CFR 550.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen: | APR go )gg6 L-96-092 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen: | ||
Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, R.J.Hovey Vice President Turkey Point Plant JEK Attachments cc: S.D.Ebneter, Regional Administrator, Region II,USNRC.T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 220028 9604220l.69 960335.PDR ADQCK 05000250 R PDR an FPL Group company | Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4. | ||
Very truly yours, R. J. Hovey Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC. | |||
T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 220028 9604220l.69 960335. | |||
PDR ADQCK 05000250 R PDR an FPL Group company | |||
K | |||
~ JI | |||
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE | AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | ||
REPORT MONTH No Date Type Duration (Hours)Reason | UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 03/01/96 683 03/02/96 692 03/03/96 702 03/04/96 677 03/05/96 706 03/06/96 700 03/07/96 695 03/08/96 696 03/09/96 706 03/10/96 711 03/11/96 711 03/12/96 712 03/13/96 708 03/14/96 705 03/15/96 702 03/16/96 698 03/17/96 696 03/18/96 695 03/19/96 693 03/20/96 701 03/21/96 706 03/22/96 707 03/23/96 707 03/24/96 704 03/25/96 702 03/26/96 698 03/27/96 500 03/28/96 0 03/29/96 229 03/30/96 676 03/31/96 684 | ||
REPORT MONTH Unit 4 operated at essentially 100<reactor power on March 1, 1996 continuing a T,,/power coast down prior to the scheduled refueling outage.A power reduction to approximately 604 power was made on March 2.A further power reduction to 304 was made on March 3.The unit was shut down for the cycle 16 refueling | UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. | ||
0 lf~-1~~la g'e R | UNIT NAME: | ||
h~~~~g4 ww | DATE COMPLETED BY TELEPHONE: | ||
REPORT MONTH No Date Type Duration (Hours) | |||
Reason* Ymthod of Event code'o=ponent Systen code'ause 6 Corrective Action to Prevent Recurrence Reactor'icensee Shutting Down Reportt 08 960327 34.5 96-006 IP RELAYX NON-SAFETY RELAY ACTUATION F - Forced Reason Method Exhibit G - Instructions Exhibit 1 - Sane Source S - Scheduled A Equipnent Failure 1 - Yenual for Preparation of Data B - Ymintenance or Test 2 - Yanual Scran Entry Sheets Licensee C - Refueling 3 - Auto atic Scrau Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161) | |||
E - Operator Training 6 5 - Load Reduction License Exanination 9 - Other (Explain) | |||
F - Adninlstratlve G - Operational Error (Explain) | |||
H - Other (Explain) | |||
'F | |||
'1~ | |||
OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 4/ 8/96 PREPARED BY 8. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS | |||
: 1. UNIT NAME: TURKEY POINT UNIT 3 | |||
: 2. REPORTING PERIOD: MARCH 1996 | |||
: 3. LICENSED THERMAL POWER (MWT): 2200 | |||
: 4. NAMEPLATE RATING (GROSS MWE): 760 | |||
: 5. DESIGN ELECTRICAL RATING (NET : 693 | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MATE]: 699 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEHB NUMBER 3 THROUGH 7) | |||
SINCE LAST REPORT, GIVE REASONS: | |||
: 9. I | |||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | |||
MONTHLY -YTD- CUMULATIVE | |||
: 11. HOURS IN REPORT PERIOD: 744 2184 204441.6 | |||
: 12. NUMBER OF HOURS REACTOR 719. 6 2013.9 138919.7 | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4 | |||
: 14. HOURS GENERATOR ON-LINE 709.5 1980.1 136875.8 | |||
: 15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 121.8 T532139 4T63'366 2%5T94385 | |||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH7 510722 1373032 91610017 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 487269 1308954 86722350 | |||
: 19. UNIT SERVICE FACTOR 95.4 90.7 67.0 | |||
: 20. UNIT AVAILABILITYFA 95.4 90.7 67.0 | |||
: 21. CAPACITY FACTOR (USING MD 98.3 90.0 64.6 | |||
: 22. CAPACITY FACTOR (USING DER NET) 94.5 86.5 61.2 | |||
: 23. UNIT FORCED OUTAGE RATE 4.6 9.3 10.7 | |||
: 24. SHUTDOWNS SCHEDULED OVER NONE | |||
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | |||
DOCKET NO. | |||
UNIT DATE: | |||
COMPLETED BY: | |||
TELEPHONE: | |||
REPORT MONTH Unit 3 began operation for the month at 100% reactor power. On March 27, the actuation of a non-safety relay caused a main steam generator feedwater pump trip. As a result the plant was manually tripped. A reactor startup occurred on March 29. The reactor returned to 100% power on March 30 and remained at essentially that level through the remainder of the month. | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | |||
UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 03/01/96 654 03/02/96 397 03/03/96 311 03/04/96 0 03/05/96 0 03/06/96 0 03/07/96 0 03/08/96 0 03/09/96 0 03/10/96 0 03/11/96 0 03/12/96 0 03/13/96 0 03/14/96 0 03/15/96 0 03/16/96 0 03/17/96 0 03/18/96 0 03/19/96 0 03/20/96 0 03/21/96 0 03/22/96 0 03/23/96 0 03/24/96 0 03/25/96 0 03/26/96 0 03/27/96 0 03/28/96 0 03/29/96 0 03/30/96 0 03/31/96 0 | |||
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. | |||
UNIT NAME: | |||
DATE: | |||
COMPLETED BY TELEPHONE: | |||
REPORT MONTH No Date Type Duration (Hours) | |||
Reason'ethod of Reactor'icensee Shutting Event Reports Code'omponent System Code'ause & Corrective Action to Prevent Recurrence Down 01 960302 0.0 N/A N/A N/A Reduced powez prior to refueling F - Forced Reason Method Exhibit G - Instructions Exhibit - Same Source | |||
- A Equipment 1 Manual for Preparation of 1 | |||
s scheduled B - YnintenanceFailure or Test 2 - Manual Scram Data Entzy Sheets Licensee C Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161) | |||
E Operator Training 6 5 - Load Reduction License Examination 9 - Other (Explain) | |||
F - Administrative G - Operational Error (Explain) | |||
H - Other (Explain) | |||
I E | |||
OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 4/ 8/96 PREPARED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS | |||
: 1. UNIT NAME: TURKEY POINT UNIT 4 | |||
: 2. REPORTING PERIOD: MARCH 1996 | |||
: 3. LICENSED THERMAL POWER (MWT): 2200 | |||
: 4. NAMEPLATE RATING (GROSS MWE): 760 | |||
: 5. DESIGN ELECTRICAL RATING (NET : 693 | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MHE): 699 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEHS NUMBER 3 THROUGH 7) | |||
SINCE LAST REPORT, GIVE REASONS: | |||
9. | |||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | |||
MONTHLY -YTD- CUMULATIVE | |||
: 11. HOURS IN REPORT PERIOD: 744 2184 198173.0 | |||
: 12. NUMBER, OF HOURS REACTOR 72.4 1512.4 134998.2 | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6 | |||
: 14. HOURS GENERATOR ON-LINE 72.2 1512.2 130905.4 | |||
: 15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 577.2 TT3083 Y2'72928 YTEF46185 | |||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWHJ 34730 1081294 88620435 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 32680 1032192 83917107 | |||
: 19. UNIT SERVICE FACTOR 9.7 69.2 66.1 | |||
: 20. UNIT AVAILABILITYFA 9.7 69.2 66.3 | |||
: 21. CAPACITY FACTOR (USING MD 6.6 71.0 64.5 | |||
: 22. CAPACITY FACTOR (USING DER NET) 6.3 68.2 61. 1 | |||
: 23. UNIT FORCED OUTAGE RATE 0.0 0.0 10.2 | |||
: 24. SHUTDOWNS SCHEDULED OVER NONE | |||
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 4-8-96 | |||
DOCKET NO. | |||
UNIT DATE: | |||
COMPLETE BY TELEPHONE: | |||
REPORT MONTH Unit 4 operated at essentially 100< reactor power on March 1, 1996 continuing a T,,/power coast down prior to the scheduled refueling outage. A power reduction to approximately 604 power was made on March 2. A further power reduction to 304 was made on March 3. The unit was shut down for the cycle 16 refueling outage on March 4 and remained shut down for the remainder of the month. | |||
0 lf ~ | |||
-1 ~ ~ | |||
la g | |||
'e R 4 | |||
iiLQqWWQW'e+ | |||
h | |||
~ ~ | |||
~~ | |||
g4 ww Ii E << i<Ab AO M}} |
Latest revision as of 21:23, 3 February 2020
ML17353A639 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 03/31/1996 |
From: | Hovey R, Knorr J FLORIDA POWER & LIGHT CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
L-96-092, L-96-92, NUDOCS 9604220169 | |
Download: ML17353A639 (17) | |
Text
r r'ATEGORY 1 REGULATON INFORMATION DISTRISUTION %STEM (RIDE)
DOCKET FACIL:50-250 Turkey Point Plant, Unit 3",- Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Flora,da Power 6 Light Co.
HOVEY,R.J. Florida Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthl ing repts for Mar 1996 for Turkey Point units 1 a . 960415 r.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CENTER 1 1 1 NRR/DRPM/PECB 1 1 1 1 EXTERNAL I L TCO BRYCE F J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RZDS" RECZPZENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT 415"2083) TO ELZMZNATE YOUR NAME FROM DZSTRZBUTZON LZSTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUERED: LTTR 9 ENCL ~ 9
APR go )gg6 L-96-092 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, R. J. Hovey Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC.
T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 220028 9604220l.69 960335.
PDR ADQCK 05000250 R PDR an FPL Group company
K
~ JI
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 03/01/96 683 03/02/96 692 03/03/96 702 03/04/96 677 03/05/96 706 03/06/96 700 03/07/96 695 03/08/96 696 03/09/96 706 03/10/96 711 03/11/96 711 03/12/96 712 03/13/96 708 03/14/96 705 03/15/96 702 03/16/96 698 03/17/96 696 03/18/96 695 03/19/96 693 03/20/96 701 03/21/96 706 03/22/96 707 03/23/96 707 03/24/96 704 03/25/96 702 03/26/96 698 03/27/96 500 03/28/96 0 03/29/96 229 03/30/96 676 03/31/96 684
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME:
DATE COMPLETED BY TELEPHONE:
REPORT MONTH No Date Type Duration (Hours)
Reason* Ymthod of Event code'o=ponent Systen code'ause 6 Corrective Action to Prevent Recurrence Reactor'icensee Shutting Down Reportt 08 960327 34.5 96-006 IP RELAYX NON-SAFETY RELAY ACTUATION F - Forced Reason Method Exhibit G - Instructions Exhibit 1 - Sane Source S - Scheduled A Equipnent Failure 1 - Yenual for Preparation of Data B - Ymintenance or Test 2 - Yanual Scran Entry Sheets Licensee C - Refueling 3 - Auto atic Scrau Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161)
E - Operator Training 6 5 - Load Reduction License Exanination 9 - Other (Explain)
F - Adninlstratlve G - Operational Error (Explain)
H - Other (Explain)
'F
'1~
OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 4/ 8/96 PREPARED BY 8. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS
- 1. UNIT NAME: TURKEY POINT UNIT 3
- 2. REPORTING PERIOD: MARCH 1996
- 3. LICENSED THERMAL POWER (MWT): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET : 693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MATE]: 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEHB NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. I
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE
- 11. HOURS IN REPORT PERIOD: 744 2184 204441.6
- 12. NUMBER OF HOURS REACTOR 719. 6 2013.9 138919.7
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
- 14. HOURS GENERATOR ON-LINE 709.5 1980.1 136875.8
- 15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 121.8 T532139 4T63'366 2%5T94385
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH7 510722 1373032 91610017
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 487269 1308954 86722350
- 19. UNIT SERVICE FACTOR 95.4 90.7 67.0
- 20. UNIT AVAILABILITYFA 95.4 90.7 67.0
- 21. CAPACITY FACTOR (USING MD 98.3 90.0 64.6
- 22. CAPACITY FACTOR (USING DER NET) 94.5 86.5 61.2
- 23. UNIT FORCED OUTAGE RATE 4.6 9.3 10.7
- 24. SHUTDOWNS SCHEDULED OVER NONE
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
DOCKET NO.
UNIT DATE:
COMPLETED BY:
TELEPHONE:
REPORT MONTH Unit 3 began operation for the month at 100% reactor power. On March 27, the actuation of a non-safety relay caused a main steam generator feedwater pump trip. As a result the plant was manually tripped. A reactor startup occurred on March 29. The reactor returned to 100% power on March 30 and remained at essentially that level through the remainder of the month.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 03/01/96 654 03/02/96 397 03/03/96 311 03/04/96 0 03/05/96 0 03/06/96 0 03/07/96 0 03/08/96 0 03/09/96 0 03/10/96 0 03/11/96 0 03/12/96 0 03/13/96 0 03/14/96 0 03/15/96 0 03/16/96 0 03/17/96 0 03/18/96 0 03/19/96 0 03/20/96 0 03/21/96 0 03/22/96 0 03/23/96 0 03/24/96 0 03/25/96 0 03/26/96 0 03/27/96 0 03/28/96 0 03/29/96 0 03/30/96 0 03/31/96 0
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY TELEPHONE:
REPORT MONTH No Date Type Duration (Hours)
Reason'ethod of Reactor'icensee Shutting Event Reports Code'omponent System Code'ause & Corrective Action to Prevent Recurrence Down 01 960302 0.0 N/A N/A N/A Reduced powez prior to refueling F - Forced Reason Method Exhibit G - Instructions Exhibit - Same Source
- A Equipment 1 Manual for Preparation of 1
s scheduled B - YnintenanceFailure or Test 2 - Manual Scram Data Entzy Sheets Licensee C Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161)
E Operator Training 6 5 - Load Reduction License Examination 9 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
I E
OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 4/ 8/96 PREPARED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS
- 1. UNIT NAME: TURKEY POINT UNIT 4
- 2. REPORTING PERIOD: MARCH 1996
- 3. LICENSED THERMAL POWER (MWT): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET : 693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MHE): 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEHS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
9.
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE
- 11. HOURS IN REPORT PERIOD: 744 2184 198173.0
- 12. NUMBER, OF HOURS REACTOR 72.4 1512.4 134998.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
- 14. HOURS GENERATOR ON-LINE 72.2 1512.2 130905.4
- 15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 577.2 TT3083 Y2'72928 YTEF46185
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWHJ 34730 1081294 88620435
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 32680 1032192 83917107
- 19. UNIT SERVICE FACTOR 9.7 69.2 66.1
- 20. UNIT AVAILABILITYFA 9.7 69.2 66.3
- 21. CAPACITY FACTOR (USING MD 6.6 71.0 64.5
- 22. CAPACITY FACTOR (USING DER NET) 6.3 68.2 61. 1
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 10.2
- 24. SHUTDOWNS SCHEDULED OVER NONE
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 4-8-96
DOCKET NO.
UNIT DATE:
COMPLETE BY TELEPHONE:
REPORT MONTH Unit 4 operated at essentially 100< reactor power on March 1, 1996 continuing a T,,/power coast down prior to the scheduled refueling outage. A power reduction to approximately 604 power was made on March 2. A further power reduction to 304 was made on March 3. The unit was shut down for the cycle 16 refueling outage on March 4 and remained shut down for the remainder of the month.
0 lf ~
-1 ~ ~
la g
'e R 4
iiLQqWWQW'e+
h
~ ~
~~
g4 ww Ii E << i<Ab AO M