Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr ML17354A6221997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Turkey Point. W/970909 Ltr ML17354A6051997-07-31031 July 1997 Monthly Operating Repts for July 1997 for TPS.W/970806 Ltr ML17354A5731997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2.W/970710 Ltr ML17354A5261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Turkey Point Units 3 & 4.W/970612 Ltr ML17354A5071997-04-30030 April 1997 Monthly Operating Repts for April 1997 for TPS.W/970512 Ltr ML17354A4631997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Turkey Point Units 3 & 4.W/970408 Ltr ML17354A4351997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Turkey Point,Units 3 & 4.W/970311 Ltr ML17354A4131997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Turkey Point,Units 3 & 4.W/970213 Ltr ML17354A3851996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr ML17354A3631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Turkey Point Units 3 & 4.W/961211 Ltr ML17354A3461996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Turkey Point,Units 1 & 2.W/961113 Ltr ML17354A2981996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4.W/961014 Ltr ML17353A8831996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Turkey Point Units 3 & 4.W/960912 Ltr ML17353A8571996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr ML17353A7731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Turkey Point Units 3 & 4.W/960710 Ltr ML17353A7301996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Turkey Point Units 3 & 4.W/960612 Ltr ML17353A6971996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Turkey Point Units 3 & 4.W/960513 Ltr ML17353A6391996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Turkey Point Units 1 & 2.W/960415 Ltr ML17353A5971996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr ML17353A5601996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Turkey Points 3 & 4.W/960213 Ltr ML17353A5361995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Turkey Point Units 3 & 4.W/960112 Ltr ML17353A4831995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Turkey Point Units 3 & 4.W/undated Ltr ML17353A4441995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Turkey Point Units 3 & 4.W/951115 Ltr ML17353A4111995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Turkey Point Units 3 & 4.W/951012 Ltr ML17353A3541995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 4.W/950912 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
Text
REGULAT Y INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9608200148 DOC.DATE: 96/07/31 NOTARIZED: NO DOCKET I FACIL:50-'250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 5t)~251. Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power 6 Light Co.
HOVEY,R.J. Florida Power 6 Light Co.
RECIP.NAME RECIPIENT A(FILIATION ltr.for for Turkey Point Plant
SUBJECT:
Monthly operating repts July 1996 Units 3 a 4.W/960813 DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs) L ENCL I SIZE:
NOTES:
Q RECIPIENT COPIES RECIPIENT COPIES 4 ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD2-3 PD 1 1 CROTEAU,R 1 1 R
INTERNAL: AEOD/SPD/RRAB 1 1 ILE CE R 1 1 NRR/DRPM/PECB 1 1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D
E
~
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL " '9
T AUG g3 tggg L-96-203 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
Re: Turkev Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the July 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, gj R. J. Hov y Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9608200i48 96073i PDR ADOCK 05000250 R PDR, an FpL Group companY
AVERAGE DAIL IT POWER LEVEL DOCKET NO. 50- 250 UNIT Turkey Point 43 DATE Aug 06, 1996 COMPLETED BY J. E. Knorr TELEPHONE (305) 246-6757 MONIH Julu. 1W6 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 07/01/96 675 07/02/96 674 07/03/96 673 07/04/96 673 07/05/96 674 07/06/96 674 07/07/96 672 07/08/96 672 07/09/96 670 07/10/96 673 07/11/96 674 07/12/96 676 07/13/96 673 07/14/96 674 07/15/96 673 07/16/96 677 07/17/96 679 07/18/96 679 07/19/96 678 07/20/96 673 07/21/96 669 07/22/96 664 07/23/96 666 07/24/96 669 07/25/96 673 07/26/96 676 07/27/96 680 07/28/96 680 07/29/96 680 07/30/96 679 07/31/96 674
UNIT SHUTDOHNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
REPORT MONTH No. Da'te Duration Reason Method Spstqa Compon()nt Cause C Corrective Action to (Hours) or Event Code Prevent Recurrence Reactor'icensee Shutting Down Reports s
N/A F -- Forced Reason A Equipment Failure Method 1 - Nanual xhibit C - Instructions or Preparation Exhibit 1 - Same Source Scheduled of Data 2 - Nanual Scram S p B Haintenance or Test Entrv Sheets Licensee f
C Re ue ling 3
-- Automatic Scram Event Report (LER) File D
E -- Regulatory restriction Operator Training 6 4
5 Continued Load Reduction (NUREG-0161)
License Examination Other (Explain)
F - Administrative 9
C - Operational Error (Explain)
H - Other (Explain)
OP ING DATA REPORT DOCKET NO 50 -250 DATE 08/06/96 PREPARED BY J.E. Knorr TELEPHONE (305) 246-6757
- 1. UNIT NAME: TURKEY POINT UNIT 3
- 2. REPORTING PERIOD: July, 1996
- 3. UCENSED THERMAL POWER (MWI): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MWE): 693
- 6. MAXIMUMDEPENDABLE CAPACflY(GROSS MWE): 699
- 7. MAXIMUMDEPENDABLE CAPACllY(NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACIIY RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. RESONS FOR RESTRICTION. IF ANY:
MONTHLY - YTD- CUMULATIVE
- 11. HOURS IN REPORT PERIOD: 7440 5111.0 207368.6
- 12. NUMBER OF HOURS REACTOR WAS CRmCAL 7440 4940.9 141846.7
- 13. REACTOR RESERVE SHUTDOWN HOURS OJ) 0.0 844A
- 14. HOURS GENERATOR ON-UNE 744J) 4907.1 139802.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1632370 10542615 291573634
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 525945 3442835 93679820
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 501469 3282270 88696166
- 19. UNIT SERVICE FACTOR 100.0 96.0 67A
- 20. UNIT AVAILABILllYFACTOR 100.0 968) 67A
- 21. CAPACllYFACTOR ( USING MDC NET) 1012 963 642
- 22. CAPACflYFACTOR ( USING DER NET ) 973 92.6 61.7
- 23. UNff FORCED OUTAGE RATE 0.0 4.0 10.5
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
DOCKET NO. .'K=25Q.
UNIT'ATE COMPLETED BY:
TELEPHONE:
REPORT MONTH Unit 3 operated at approximately 100% reactor power for the month of July 1996.
AVERAGE DAIL IT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point 44 DATE Aug 06, 1996 COMPLETED BY J. E. Knorr TELEPHONE (305) 246-6757 MONIH Julu. 1W6 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 07/01/96 664 07/02/96 658 07/03/96 659 07/04/96 660 07/05/96 658 07/06/96 657 07/07/96 654 07/08/96 653 07/09/96 651 07/10/96 653 07/11/96 656 07/12/96 530 07/13/96 0 07/14/96 0 07/15/96 185 07/16/96 611 07/17/96 663 07/18/96 666 07/19/96 664 07/20/96 661 07/21/96 657 07/22/96 654 07/23/96 655 07/24/96 657 07/25/96 661 07/26/96 663 07/27/96 665 07/28/96 663 07/29/96 658 07/30/96 656 07/31/96 654
UNff SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: Turkey Point P 4 DATE: Aug 06. 1996 COMPLETED BY: J. E. Knorr REPORT MONTH JULY 1996 TELEPHONE: (305) 2486757 No. Date Type Duration Reason Method of Ucensee System Component Cause and Corrective 1 (Hours) 2 Shutting Event Code Action to Down 3 Report 4 4 Code 5 Prevent Recurrence:
00001014 07/12/96 N/A HH VALVEX Reduced power to repair valve on feedwater reheater 00001015 07/15/96 0.0 N/A HH INSTRU Feedwater level control 00001016 07/16/96 0.0 N/A HH PUMPXX Main feed pump seal repair
- 1. F Forced 2. A - Equipment Failure (Explain) 3. 1-Manual 4. Exibit G - Instructions for S Scheduled B - Maintenance or test 2- Manual Scram Preparation of Data Entry C - Refueling 3- Automatic Scram Sheets ucensee Event Report D - Regulatory Restriction 4- Continued (LER) File (NUREG4161)
E - Operator Training .LIcense Examination 5- Load Reduction F - Administraitive 5.
G - Operational Error (Explain) 9- Other (Explain) Exibit I - Same Source H - Other (Explain)
U 0 TING DATA REPORT DOCKET NO 50 -251 DATE 08/13/96 PREPARED BY J. E. Knorr TELEPHONE (305) 546-6757
- l. UNIT NAME: TURKEY POINT UNIT 4
- 2. REPORTING PERIOD: July, 1996
- 3. UCENSED THERMAL POWER (MUR): 2200
- 4. NAMEPlATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MW9: 693
- 6. MAXIMUMDEPENDABLE CAPACIlY(GROSS MWE): 699
- 7. MAXIMUMDEPENDABLE CAPACIIY(NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACI1Y RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE lAST REPORT.
GIVE REASONS:
- 9. POWER LEVELTO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. RESONS FOR RESTRICTION, IF ANY:
MONTHLY - YTD- CUMUIATIVE
- 11. HOURS IN REPORT PERIOD: 744.0 5111.0 13871 2)
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 7449 4294.1 137780.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 OJ) 166.6
- 14. HOURS GENERATOR ON-UNE 688.9 4173.6 133566.7
- 15. UNIT RESERVE SHUTDOWN HOURS OJ) OJI 5772
- 16. GROSS THERMAL ENERGY GENE RATED (MWH) 1480079 8889299 282562556
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 465202 2856594 90377735
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 442170 2716117 85601032
- 19. UNIT SERVICE FACTOR 92.6 81.7 66A
- 20. UNIT AVAllABIUIY FACTOR 92.6 81.7 66A
- 21. CAPACIIYFACTOR ( USING MDC NET ) 892 79.8 63.9
- 22. CAPACIlY FACTOR ( USING DER NET ) 85.8 76.7 88.6
- 23. UNIT FORCED OUTAGE RATE 7A 1.9 10.0
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
DOCKET NO.
UNIT:
DATE COMPLETE BY:
TELEPHONE:
REPORT MONTH Unit 4 operated at approximately 100% reactor power until July
- 12. The unit was taken off line to repair a valve associated with the feedwater heaters. Feedwater heater level control repairs and work on a main feed pump seal was also completed.
The Unit returned to 100% power on July 16 and remained at approximately that level for the remainder of the month of July.
'I \
1 0 j