ML17353A857: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/31/1996
| issue date = 07/31/1996
| title = Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr
| title = Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr
| author name = HOVEY R J, KNORR J E
| author name = Hovey R, Knorr J
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULAT Y INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9608200148 DOC.DATE: 96/07/31 NOTARIZED:
{{#Wiki_filter:REGULAT   Y INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO DOCKET I FACIL:50-'250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 5t)~251.Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION KNORR,J.E.
ACCESSION NBR:9608200148           DOC.DATE: 96/07/31       NOTARIZED: NO         DOCKET I FACIL:50-'250 Turkey Point       Plant, Unit 3, Florida       Power and Light C 05000250 5t)~251. Turkey Point     Plant, Unit 4, Florida       Power and Light C 05000251 AUTH.NAME             AUTHOR AFFILIATION KNORR,J.E.           Florida Power 6 Light Co.
Florida Power 6 Light Co.HOVEY,R.J.
HOVEY,R.J.           Florida Power 6 Light Co.
Florida Power 6 Light Co.RECIP.NAME RECIPIENT A(FILIATION
RECIP.NAME             RECIPIENT A(FILIATION ltr.for                for Turkey Point Plant


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for July 1996 for Turkey Point Plant Units 3 a 4.W/960813 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR L ENCL I SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD2-3 PD COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME CROTEAU,R COPIES LTTR ENCL 1 1 Q 4 0 R INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 1 1 1 1 ILE CE R NOAC 1 1 1 1 1 1 D E~N NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating repts           July   1996 Units   3 a 4.W/960813 DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)           L    ENCL  I  SIZE:
PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL"'9 T
NOTES:
AUG g3 tggg L-96-203 10 CFR 550.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
Q RECIPIENT            COPIES            RECIPIENT             COPIES                4 ID CODE/NAME           LTTR ENCL        ID CODE/NAME          LTTR ENCL            0 PD2-3   PD               1     1     CROTEAU,R                 1   1 R
Re: Turkev Point Units 3 and 4 Docket Nos.50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the July 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, gj R.J.Hov y Vice President Turkey Point Plant JEK Attachments cc: S.D.Ebneter, Regional Administrator, Region II, USNRC T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9608200i48 96073i PDR ADOCK 05000250 R PDR, an FpL Group companY
INTERNAL: AEOD/SPD/RRAB               1    1      ILE  CE      R          1    1 NRR/DRPM/PECB             1    1                                1    1 EXTERNAL: LITCO BRYCE,J H             1     1     NOAC                     1   1 NRC PDR                  1     1 D
E
                                                                                                ~
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR             9   ENCL   "   '9


AVERAGE DAIL IT POWER LEVEL MONIH Julu.1W6 DOCKET NO.50-250 UNIT Turkey Point 43 DATE Aug 06, 1996 COMPLETED BY J.E.Knorr TELEPHONE (305)246-6757 DAY 07/01/96 07/02/96 07/03/96 07/04/96 07/05/96 07/06/96 07/07/96 07/08/96 07/09/96 07/10/96 07/11/96 07/12/96 07/13/96 07/14/96 07/15/96 07/16/96 07/17/96 07/18/96 07/19/96 07/20/96 07/21/96 07/22/96 07/23/96 07/24/96 07/25/96 07/26/96 07/27/96 07/28/96 07/29/96 07/30/96 07/31/96 AVERAGE DAILY POWER LEVEL (MWe-Net)675 674 673 673 674 674 672 672 670 673 674 676 673 674 673 677 679 679 678 673 669 664 666 669 673 676 680 680 680 679 674 UNIT SHUTDOHNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
T AUG g3 tggg L-96-203 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn:     Document Control Desk Washington, D. C. 20555 Gentlemen:
REPORT MONTH No.Da'te Duration (Hours)Reason Method or Shutting Down s Reactor'icensee Event Reports Spstqa Compon()nt Code Cause C Corrective Action to Prevent Recurrence N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Haintenance or Test C-Re f ue ling D-Regulatory restriction E-Operator Training 6 License Examination F-Administrative C-Operational Error (Explain)H-Other (Explain)Method 1-Nanual 2-Nanual Scram 3 Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)xhibit C-Instructions p or Preparation of Data Entrv Sheets Licensee Event Report (LER)File (NUREG-0161)
Re:   Turkev Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and    4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the July 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Exhibit 1-Same Source OP ING DATA REPORT DOCKET NO DATE PREPARED BY TELEPHONE 50-250 08/06/96 J.E.Knorr (305)246-6757 1.UNIT NAME: TURKEY POINT UNIT 3 2.REPORTING PERIOD: July, 1996 3.UCENSED THERMAL POWER (MWI): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET MWE): 693 6.MAXIMUM DEPENDABLE CAPACflY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACllY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACIIY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.RESONS FOR RESTRICTION.
Very truly yours, gj R. J. Hov y Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9608200i48 96073i PDR  ADOCK      05000250 R                        PDR, an FpL Group companY
IF ANY: 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRmCAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-UNE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILllY FACTOR 21.CAPACllY FACTOR (USING MDC NET)22.CAPACflY FACTOR (USING DER NET)23.UNff FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: None MONTHLY 7440 7440 OJ)744J)0.0 1632370 525945 501469 100.0 100.0 1012 973 0.0-YTD-5111.0 4940.9 0.0 4907.1 0.0 10542615 3442835 3282270 96.0 968)963 92.6 4.0 CUMULATIVE 207368.6 141846.7 844A 139802.9 121.8 291573634 93679820 88696166 67A 67A 642 61.7 10.5 25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
DOCKET NO.UNIT'ATE COMPLETED BY: TELEPHONE:
.'K=25Q.REPORT MONTH Unit 3 operated at approximately 100%reactor power for the month of July 1996.
AVERAGE DAIL IT POWER LEVEL MONIH Julu.1W6 DOCKET NO.50-251 UNIT Turkey Point 44 DATE Aug 06, 1996 COMPLETED BY J.E.Knorr TELEPHONE (305)246-6757 DAY 07/01/96 07/02/96 07/03/96 07/04/96 07/05/96 07/06/96 07/07/96 07/08/96 07/09/96 07/10/96 07/11/96 07/12/96 07/13/96 07/14/96 07/15/96 07/16/96 07/17/96 07/18/96 07/19/96 07/20/96 07/21/96 07/22/96 07/23/96 07/24/96 07/25/96 07/26/96 07/27/96 07/28/96 07/29/96 07/30/96 07/31/96 AVERAGE DAILY POWER LEVEL (MWe-Net)664 658 659 660 658 657 654 653 651 653 656 530 0 0 185 611 663 666 664 661 657 654 655 657 661 663 665 663 658 656 654 UNff SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH JULY 1996 DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
50-251 Turkey Point P 4 Aug 06.1996 J.E.Knorr (305)2486757 No.Date Type 1 Duration (Hours)Reason 2 Method of Shutting Down 3 Ucensee Event Report 4 System Code 4 Component Code 5 Cause and Corrective Action to Prevent Recurrence:
00001014 07/12/96 N/A HH VALVEX Reduced power to repair valve on feedwater reheater 00001015 07/15/96 0.0 N/A HH INSTRU Feedwater level control 00001016 07/16/96 0.0 N/A HH PUMPXX Main feed pump seal repair 1.F Forced S Scheduled 2.A-Equipment Failure (Explain)B-Maintenance or test C-Refueling D-Regulatory Restriction E-Operator Training.LIcense Examination F-Administraitive G-Operational Error (Explain)H-Other (Explain)3.1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)4.Exibit G-Instructions for Preparation of Data Entry Sheets ucensee Event Report (LER)File (NUREG4161) 5.Exibit I-Same Source U
0 TING DATA REPORT DOCKET NO DATE PREPARED BY TELEPHONE 50-251 08/13/96 J.E.Knorr (305)546-6757 l.UNIT NAME: TURKEY POINT UNIT 4 2.REPORTING PERIOD: July, 1996 3.UCENSED THERMAL POWER (MUR): 2200 4.NAMEPlATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET MW9: 693 6.MAXIMUM DEPENDABLE CAPACIlY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACIIY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACI1Y RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE lAST REPORT.GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.RESONS FOR RESTRICTION, IF ANY: 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-UNE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENE RATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAllABIUIY FACTOR 21.CAPACIIY FACTOR (USING MDC NET)22.CAPACIlY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: None MONTHLY 744.0 7449 0.0 688.9 OJ)1480079 465202 442170 92.6 92.6 892 85.8 7A-YTD-5111.0 4294.1 OJ)4173.6 OJI 8889299 2856594 2716117 81.7 81.7 79.8 76.7 1.9 CUMUIATIVE 13871 2)137780.9 166.6 133566.7 5772 282562556 90377735 85601032 66A 66A 63.9 88.6 10.0 25.IF SHUTDOWN AT END OF REPORT PERIOD.ESTIMATED DATE OF STARTUP:


DOCKET NO.UNIT: DATE COMPLETE BY: TELEPHONE:
AVERAGE DAIL      IT POWER LEVEL DOCKET NO. 50- 250 UNIT         Turkey Point 43 DATE        Aug 06, 1996 COMPLETED BY J. E. Knorr TELEPHONE    (305) 246-6757 MONIH Julu. 1W6 DAY        AVERAGE DAILY POWER LEVEL (MWe-Net) 07/01/96              675 07/02/96              674 07/03/96              673 07/04/96              673 07/05/96              674 07/06/96              674 07/07/96              672 07/08/96              672 07/09/96              670 07/10/96              673 07/11/96              674 07/12/96              676 07/13/96              673 07/14/96              674 07/15/96              673 07/16/96              677 07/17/96              679 07/18/96              679 07/19/96              678 07/20/96              673 07/21/96              669 07/22/96              664 07/23/96              666 07/24/96              669 07/25/96              673 07/26/96              676 07/27/96              680 07/28/96              680 07/29/96              680 07/30/96              679 07/31/96              674
REPORT MONTH Unit 4 operated at approximately 100%reactor power until July 12.The unit was taken off line to repair a valve associated with the feedwater heaters.Feedwater heater level control repairs and work on a main feed pump seal was also completed.
 
The Unit returned to 100%power on July 16 and remained at approximately that level for the remainder of the month of July.  
UNIT SHUTDOHNS AND              POWER REDUCTIONS DOCKET NO.
'I\1 0 j}}
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
REPORT MONTH No.        Da'te      Duration      Reason        Method                  Spstqa        Compon()nt    Cause  C Corrective Action to (Hours)                      or            Event                  Code              Prevent Recurrence Reactor'icensee Shutting Down Reports s
N/A F --  Forced          Reason A  Equipment  Failure Method 1 - Nanual xhibit C - Instructions or Preparation Exhibit  1 - Same Source Scheduled                                                                                  of Data 2 - Nanual Scram S                                                                                      p B  Haintenance or Test                                  Entrv Sheets Licensee f
C  Re ue ling                3
                                                        -- Automatic Scram      Event Report (LER)  File D
E -- Regulatory restriction Operator Training 6 4
5 Continued Load Reduction (NUREG-0161)
License Examination            Other (Explain)
F - Administrative 9
C - Operational Error (Explain)
H - Other (Explain)
 
OP      ING DATA REPORT DOCKET NO                  50 -250 DATE                      08/06/96 PREPARED BY              J.E. Knorr TELEPHONE            (305) 246-6757
: 1. UNIT NAME:        TURKEY POINT        UNIT 3
: 2. REPORTING PERIOD:      July, 1996
: 3. UCENSED THERMAL POWER      (MWI):                        2200
: 4. NAMEPLATE RATING (GROSS MWE):                              760
: 5. DESIGN ELECTRICAL RATING (NET MWE):                        693
: 6. MAXIMUMDEPENDABLE CAPACflY(GROSS MWE):                    699
: 7. MAXIMUMDEPENDABLE CAPACllY(NET MWE):                      666
: 8. IF CHANGES OCCUR IN CAPACIIY RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
: 10. RESONS FOR RESTRICTION. IF ANY:
MONTHLY            - YTD-      CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                                      7440          5111.0          207368.6
: 12. NUMBER OF HOURS REACTOR WAS CRmCAL                          7440          4940.9          141846.7
: 13. REACTOR RESERVE SHUTDOWN HOURS                                OJ)            0.0            844A
: 14. HOURS GENERATOR ON-UNE                                      744J)        4907.1          139802.9
: 15. UNIT RESERVE SHUTDOWN HOURS                                    0.0            0.0            121.8
: 16. GROSS THERMAL ENERGY GENERATED      (MWH)                1632370      10542615        291573634
: 17. GROSS ELECTRICAL ENERGY GENERATED      (MWH)              525945        3442835          93679820
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                      501469        3282270          88696166
: 19. UNIT SERVICE FACTOR                                          100.0            96.0              67A
: 20. UNIT AVAILABILllYFACTOR                                      100.0            968)              67A
: 21. CAPACllYFACTOR    ( USING MDC NET)                          1012            963              642
: 22. CAPACflYFACTOR ( USING DER NET )                              973            92.6              61.7
: 23. UNff FORCED OUTAGE RATE                                        0.0            4.0              10.5
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
None
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
 
DOCKET NO.        .'K=25Q.
UNIT'ATE COMPLETED BY:
TELEPHONE:
REPORT MONTH Unit 3 operated at approximately 100%    reactor power for the month of July 1996.
 
AVERAGE DAIL      IT POWER LEVEL DOCKET NO. 50-251 UNIT        Turkey Point 44 DATE        Aug 06, 1996 COMPLETED BY J. E. Knorr TELEPHONE    (305) 246-6757 MONIH Julu. 1W6 DAY        AVERAGE DAILY POWER LEVEL (MWe-Net) 07/01/96              664 07/02/96              658 07/03/96              659 07/04/96              660 07/05/96              658 07/06/96              657 07/07/96              654 07/08/96              653 07/09/96              651 07/10/96              653 07/11/96              656 07/12/96              530 07/13/96                0 07/14/96                0 07/15/96              185 07/16/96              611 07/17/96              663 07/18/96              666 07/19/96              664 07/20/96              661 07/21/96              657 07/22/96              654 07/23/96              655 07/24/96              657 07/25/96              661 07/26/96              663 07/27/96              665 07/28/96              663 07/29/96              658 07/30/96              656 07/31/96              654
 
UNff SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.            50-251 UNIT NAME:    Turkey Point P 4 DATE:            Aug 06. 1996 COMPLETED BY:      J. E. Knorr REPORT MONTH    JULY 1996                                                TELEPHONE:      (305) 2486757 No.          Date  Type Duration        Reason      Method of      Ucensee      System      Component                    Cause and Corrective 1  (Hours)            2      Shutting      Event      Code                                              Action to Down      3 Report 4            4      Code 5                      Prevent Recurrence:
00001014      07/12/96                                                    N/A          HH          VALVEX  Reduced power to repair valve on feedwater reheater 00001015      07/15/96          0.0                                      N/A          HH          INSTRU Feedwater level control 00001016      07/16/96          0.0                                      N/A          HH        PUMPXX  Main feed pump seal repair
: 1. F Forced              2. A - Equipment Failure (Explain)                  3. 1-Manual                    4. Exibit G - Instructions for S Scheduled              B - Maintenance or test                            2- Manual Scram                Preparation of Data Entry C - Refueling                                      3- Automatic Scram              Sheets ucensee Event Report D - Regulatory Restriction                          4- Continued                    (LER) File (NUREG4161)
E - Operator Training .LIcense Examination          5- Load Reduction F - Administraitive                                                              5.
G - Operational Error (Explain) 9- Other (Explain)              Exibit I - Same Source H - Other (Explain)
 
U 0      TING DATA REPORT DOCKET NO                    50 -251 DATE                      08/13/96 PREPARED BY              J. E. Knorr TELEPHONE            (305) 546-6757
: l. UNIT NAME:        TURKEY POINT      UNIT 4
: 2. REPORTING PERIOD:      July, 1996
: 3. UCENSED THERMAL POWER (MUR):                              2200
: 4. NAMEPlATE RATING (GROSS MWE):                              760
: 5. DESIGN ELECTRICAL RATING (NET MW9:                          693
: 6. MAXIMUMDEPENDABLE CAPACIlY(GROSS MWE):                      699
: 7. MAXIMUMDEPENDABLE CAPACIIY(NET MWE):                        666
: 8. IF CHANGES OCCUR IN CAPACI1Y RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE lAST REPORT.
GIVE REASONS:
: 9. POWER LEVELTO WHICH RESTRICTED, IF ANY (NET MWE)
: 10. RESONS FOR RESTRICTION, IF ANY:
MONTHLY          - YTD-      CUMUIATIVE
: 11. HOURS IN REPORT PERIOD:                                     744.0        5111.0            13871 2)
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                        7449          4294.1          137780.9
: 13. REACTOR RESERVE SHUTDOWN HOURS                                  0.0            OJ)              166.6
: 14. HOURS GENERATOR ON-UNE                                      688.9        4173.6          133566.7
: 15. UNIT RESERVE SHUTDOWN HOURS                                    OJ)            OJI              5772
: 16. GROSS THERMAL ENERGY GENE RATED (MWH)                    1480079        8889299          282562556
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)                    465202        2856594          90377735
: 18. NET ELECTRICAL ENERGY GENERATED    (MWH)                  442170        2716117          85601032
: 19. UNIT SERVICE FACTOR                                          92.6            81.7              66A
: 20. UNIT AVAllABIUIY  FACTOR                                      92.6            81.7              66A
: 21. CAPACIIYFACTOR      ( USING MDC NET )                        892            79.8              63.9
: 22. CAPACIlY FACTOR ( USING DER NET )                            85.8            76.7              88.6
: 23. UNIT FORCED OUTAGE RATE                                        7A            1.9              10.0
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
None
: 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
 
DOCKET NO.
UNIT:
DATE COMPLETE BY:
TELEPHONE:
REPORT MONTH Unit 4 operated at approximately 100% reactor power until July
: 12. The unit was taken off line to repair a valve associated with the feedwater heaters. Feedwater heater level control repairs and work on a main feed pump seal was also completed.
The Unit returned to 100% power on July 16 and remained at approximately that level for the remainder of the month of July.
 
    'I \
1 0     j}}

Latest revision as of 21:21, 3 February 2020

Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr
ML17353A857
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/31/1996
From: Hovey R, Knorr J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-203, NUDOCS 9608200148
Download: ML17353A857 (15)


Text

REGULAT Y INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9608200148 DOC.DATE: 96/07/31 NOTARIZED: NO DOCKET I FACIL:50-'250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 5t)~251. Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power 6 Light Co.

HOVEY,R.J. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT A(FILIATION ltr.for for Turkey Point Plant

SUBJECT:

Monthly operating repts July 1996 Units 3 a 4.W/960813 DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs) L ENCL I SIZE:

NOTES:

Q RECIPIENT COPIES RECIPIENT COPIES 4 ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD2-3 PD 1 1 CROTEAU,R 1 1 R

INTERNAL: AEOD/SPD/RRAB 1 1 ILE CE R 1 1 NRR/DRPM/PECB 1 1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

E

~

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL " '9

T AUG g3 tggg L-96-203 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkev Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the July 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, gj R. J. Hov y Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9608200i48 96073i PDR ADOCK 05000250 R PDR, an FpL Group companY

AVERAGE DAIL IT POWER LEVEL DOCKET NO. 50- 250 UNIT Turkey Point 43 DATE Aug 06, 1996 COMPLETED BY J. E. Knorr TELEPHONE (305) 246-6757 MONIH Julu. 1W6 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 07/01/96 675 07/02/96 674 07/03/96 673 07/04/96 673 07/05/96 674 07/06/96 674 07/07/96 672 07/08/96 672 07/09/96 670 07/10/96 673 07/11/96 674 07/12/96 676 07/13/96 673 07/14/96 674 07/15/96 673 07/16/96 677 07/17/96 679 07/18/96 679 07/19/96 678 07/20/96 673 07/21/96 669 07/22/96 664 07/23/96 666 07/24/96 669 07/25/96 673 07/26/96 676 07/27/96 680 07/28/96 680 07/29/96 680 07/30/96 679 07/31/96 674

UNIT SHUTDOHNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH No. Da'te Duration Reason Method Spstqa Compon()nt Cause C Corrective Action to (Hours) or Event Code Prevent Recurrence Reactor'icensee Shutting Down Reports s

N/A F -- Forced Reason A Equipment Failure Method 1 - Nanual xhibit C - Instructions or Preparation Exhibit 1 - Same Source Scheduled of Data 2 - Nanual Scram S p B Haintenance or Test Entrv Sheets Licensee f

C Re ue ling 3

-- Automatic Scram Event Report (LER) File D

E -- Regulatory restriction Operator Training 6 4

5 Continued Load Reduction (NUREG-0161)

License Examination Other (Explain)

F - Administrative 9

C - Operational Error (Explain)

H - Other (Explain)

OP ING DATA REPORT DOCKET NO 50 -250 DATE 08/06/96 PREPARED BY J.E. Knorr TELEPHONE (305) 246-6757

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: July, 1996
3. UCENSED THERMAL POWER (MWI): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUMDEPENDABLE CAPACflY(GROSS MWE): 699
7. MAXIMUMDEPENDABLE CAPACllY(NET MWE): 666
8. IF CHANGES OCCUR IN CAPACIIY RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. RESONS FOR RESTRICTION. IF ANY:

MONTHLY - YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 7440 5111.0 207368.6
12. NUMBER OF HOURS REACTOR WAS CRmCAL 7440 4940.9 141846.7
13. REACTOR RESERVE SHUTDOWN HOURS OJ) 0.0 844A
14. HOURS GENERATOR ON-UNE 744J) 4907.1 139802.9
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 1632370 10542615 291573634
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 525945 3442835 93679820
18. NET ELECTRICAL ENERGY GENERATED (MWH) 501469 3282270 88696166
19. UNIT SERVICE FACTOR 100.0 96.0 67A
20. UNIT AVAILABILllYFACTOR 100.0 968) 67A
21. CAPACllYFACTOR ( USING MDC NET) 1012 963 642
22. CAPACflYFACTOR ( USING DER NET ) 973 92.6 61.7
23. UNff FORCED OUTAGE RATE 0.0 4.0 10.5
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:

None

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO. .'K=25Q.

UNIT'ATE COMPLETED BY:

TELEPHONE:

REPORT MONTH Unit 3 operated at approximately 100% reactor power for the month of July 1996.

AVERAGE DAIL IT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point 44 DATE Aug 06, 1996 COMPLETED BY J. E. Knorr TELEPHONE (305) 246-6757 MONIH Julu. 1W6 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 07/01/96 664 07/02/96 658 07/03/96 659 07/04/96 660 07/05/96 658 07/06/96 657 07/07/96 654 07/08/96 653 07/09/96 651 07/10/96 653 07/11/96 656 07/12/96 530 07/13/96 0 07/14/96 0 07/15/96 185 07/16/96 611 07/17/96 663 07/18/96 666 07/19/96 664 07/20/96 661 07/21/96 657 07/22/96 654 07/23/96 655 07/24/96 657 07/25/96 661 07/26/96 663 07/27/96 665 07/28/96 663 07/29/96 658 07/30/96 656 07/31/96 654

UNff SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: Turkey Point P 4 DATE: Aug 06. 1996 COMPLETED BY: J. E. Knorr REPORT MONTH JULY 1996 TELEPHONE: (305) 2486757 No. Date Type Duration Reason Method of Ucensee System Component Cause and Corrective 1 (Hours) 2 Shutting Event Code Action to Down 3 Report 4 4 Code 5 Prevent Recurrence:

00001014 07/12/96 N/A HH VALVEX Reduced power to repair valve on feedwater reheater 00001015 07/15/96 0.0 N/A HH INSTRU Feedwater level control 00001016 07/16/96 0.0 N/A HH PUMPXX Main feed pump seal repair

1. F Forced 2. A - Equipment Failure (Explain) 3. 1-Manual 4. Exibit G - Instructions for S Scheduled B - Maintenance or test 2- Manual Scram Preparation of Data Entry C - Refueling 3- Automatic Scram Sheets ucensee Event Report D - Regulatory Restriction 4- Continued (LER) File (NUREG4161)

E - Operator Training .LIcense Examination 5- Load Reduction F - Administraitive 5.

G - Operational Error (Explain) 9- Other (Explain) Exibit I - Same Source H - Other (Explain)

U 0 TING DATA REPORT DOCKET NO 50 -251 DATE 08/13/96 PREPARED BY J. E. Knorr TELEPHONE (305) 546-6757

l. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: July, 1996
3. UCENSED THERMAL POWER (MUR): 2200
4. NAMEPlATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MW9: 693
6. MAXIMUMDEPENDABLE CAPACIlY(GROSS MWE): 699
7. MAXIMUMDEPENDABLE CAPACIIY(NET MWE): 666
8. IF CHANGES OCCUR IN CAPACI1Y RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE lAST REPORT.

GIVE REASONS:

9. POWER LEVELTO WHICH RESTRICTED, IF ANY (NET MWE)
10. RESONS FOR RESTRICTION, IF ANY:

MONTHLY - YTD- CUMUIATIVE

11. HOURS IN REPORT PERIOD: 744.0 5111.0 13871 2)
12. NUMBER OF HOURS REACTOR WAS CRITICAL 7449 4294.1 137780.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 OJ) 166.6
14. HOURS GENERATOR ON-UNE 688.9 4173.6 133566.7
15. UNIT RESERVE SHUTDOWN HOURS OJ) OJI 5772
16. GROSS THERMAL ENERGY GENE RATED (MWH) 1480079 8889299 282562556
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 465202 2856594 90377735
18. NET ELECTRICAL ENERGY GENERATED (MWH) 442170 2716117 85601032
19. UNIT SERVICE FACTOR 92.6 81.7 66A
20. UNIT AVAllABIUIY FACTOR 92.6 81.7 66A
21. CAPACIIYFACTOR ( USING MDC NET ) 892 79.8 63.9
22. CAPACIlY FACTOR ( USING DER NET ) 85.8 76.7 88.6
23. UNIT FORCED OUTAGE RATE 7A 1.9 10.0
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:

None

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:

DOCKET NO.

UNIT:

DATE COMPLETE BY:

TELEPHONE:

REPORT MONTH Unit 4 operated at approximately 100% reactor power until July

12. The unit was taken off line to repair a valve associated with the feedwater heaters. Feedwater heater level control repairs and work on a main feed pump seal was also completed.

The Unit returned to 100% power on July 16 and remained at approximately that level for the remainder of the month of July.

'I \

1 0 j