ML17354A758: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/31/1997
| issue date = 12/31/1997
| title = Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr
| title = Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr
| author name = HOVEY R J, MOWREY C L
| author name = Hovey R, Mowrey C
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULAT Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)ACCESSION NBR:9801220010 DOC.DATE: 97/12/31 NOTARIZED:
{{#Wiki_filter:CATEGORY 1 REGULAT     Y INFORMATION DISTRIBUTIO         SYSTEM (RIDS)
NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C.50-251'urkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION MOWREY,C.L.
ACCESSION NBR:9801220010           DOC.DATE:   97/12/31     NOTARIZED: NO               DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and                   Light   C 05000250
Florida Power&.Light Co.HOVEY, R.J.Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000250 05000251
        .50-251'urkey Point Plant, Unit 4, Florida Power and                 Light   C 05000251 AUTH.NAME             AUTHOR AFFILIATION MOWREY,C.L.           Florida   Power &. Light Co.
HOVEY, R. J.         Florida   Power & Light Co.
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for Dec 1997 for Turkey Point, Unit 3 4.W/980112 ltr.DISTRXBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: A T RECIPIENT ID CODE/NAME PD2-3 PD COPIES RECIPIENT LTTR ENCL" ID CODE/NAME 1 1 CROTEAU,R COPIES LTTR ENCL 1 1 INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1'1 1 1 1 ILE CENTER GN2 NOAC 1 1 1 1 1 1 D N I NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating repts         for Dec 1997   for Turkey Point, Unit       3 4.W/980112   ltr.                                                                   A DISTRXBUTION CODE: IE24D         COPIES RECEIVED:LTR         ENCL       SIZE:                   T TITLE: Monthly Operating Report (per Tech Specs)
PLEASE HELP US'TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9  
NOTES:
~'!
RECIPIENT            COPIES              RECIPIENT             COPIES ID CODE/NAME         LTTR ENCL "       ID CODE/NAME         LTTR ENCL PD2-3 PD                  1     1       CROTEAU,R                 1     1 INTERNAL: AEOD/SPD/RRAB               1    '
JANI 23998 L-98-002 10 CFR 550.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the December 1997 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, R.J.Hovey Vice President Turkey Point Plant CLM Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 980i2200i0 97i23i PDR ADOCK 05000250 R PDR~QgL.1'iele4~)j IIIIIII IIIII IIIII IIIII IIIII IIIII IIIIIIII an FPL Group company AVERAGE DAILY UNIT POWER LEVEL MONTH December, 1997 DOCKET NO.50-250 UNIT Turkey Point g3 DATE Jan 05, 1998 COMPLETED BY C.L.Mowrey TELEPHONE (305)246-6204 DAY 12/01/97 12/02/97 12/03/97 12/04/97 12/05/97 12/06/97 12/07/97 12/08/97 12/09/97 12/10/97 12/11/97 12/12/97 12/13/97 12/14/97 12/15/97 12/16/97 12/17/97 12/18/97 12/19/97 12/20/97 12/21/97 12/22/97 12/23/97 12/24/97 12/25/97 12/26/97 12/27/97 12/28/97 12/29/97 12/30/97 12/31/97 AVERAGE DAILY POWER LEVEL (MWe-Net)721 727 727 725 729 735 738 737 732 720 716 716 717 722 732 735 738 737 737 734 729 721 720 717 717 714 715 727 732 735 736 DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT UNIT 3 Janua 5 1998 C.L.Mowre REPORTING PERIOD December 1997 (MonthNear) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 744.0" 744.0 0.0 7666.3 7571.8 0.0 153117.8 150958.9 121.8 6.Net Electrical Energy (MWH)540845.0 5252350.0 96412556.0 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.50-250 UNIT NAME: T~IP I'ATE: J~999 COMPLETED BY: C.L.M TELEPEDNB:
1        ILE  CENTER              1      1 OC/DBA/PAD               1              GN2                      1      1 EXTERNAL: LITCO BRYCE,J H             1     1       NOAC                     1     1 NRC PDR                  1     1 D
QMP 9-REPORT MONTH December 1997 No.Date Type Duration (Hours)Reason'ethod of Shutting Dawn Reactor'ause 4 Corrective Action Co~ents N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training a License Exanination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scran 3-Autcctatic Scran 4-Continued 5-Load Reduction 9-Other (Explain)  
N I
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US'TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               9   ENCL     9
 
~
 
JANI 23998 L-98-002 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:     Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the December 1997 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, R. J. Hovey Vice President Turkey Point Plant CLM Attachments cc: Regional Administrator, Region   II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 980i2200i0 97i23i PDR R
ADOCK     05000250 PDR
                                                                                              ~ QgL.
1'iele4~)
j IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII an FPL Group company
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 250 UNIT         Turkey Point g3 DATE         Jan 05, 1998 COMPLETED BY C. L. Mowrey TELEPHONE   (305) 246 - 6204 MONTH      December, 1997 DAY         AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/97                 721 12/02/97                 727 12/03/97                 727 12/04/97                 725 12/05/97                 729 12/06/97                 735 12/07/97                 738 12/08/97                 737 12/09/97                 732 12/10/97                 720 12/11/97                 716 12/12/97                 716 12/13/97                 717 12/14/97                 722 12/15/97                 732 12/16/97                 735 12/17/97                 738 12/18/97                 737 12/19/97                 737 12/20/97                 734 12/21/97                 729 12/22/97                 721 12/23/97                 720 12/24/97                 717 12/25/97                 717 12/26/97                 714 12/27/97                 715 12/28/97                 727 12/29/97                 732 12/30/97                 735 12/31/97                 736
 
DOCKET NO.                     50-250 UNIT NAME                      TURKEY POINT UNIT 3 DATE                            Janua   5 1998 COMPLETED BY                    C. L. Mowre TELEPHONE REPORTING PERIOD December 1997 (MonthNear)
: 1. Design Electrical Rating (MWe-Net)             720
: 2. Maximum Dependable Capacity (MWe-Net)           693 MONTH       -YTD-   CUMULATIVE
: 3. Number of Hours Reactor Was Critical                   744.0    7666.3    153117.8
: 4. Number of Hours Generator Was On Line                 744.0    7571.8    150958.9
: 5. Unit Reserve Shutdown Hours                             0.0       0.0       121.8
: 6. Net Electrical Energy (MWH)                       540845.0 5252350.0   96412556.0
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.           50-250 UNIT NAME:           T~IP COMPLETED BY:
J~999     I'ATE:
C. L. M TELEPEDNB:           QMP     9-REPORT MONTH December 1997 No.         Date Type     Duration       Reason'ethod       of               Corrective Action Reactor'ause 4
(Hours)                  Shutting                Co~ents Dawn N/A F - Forced             Reason                      Method S - Scheduled         A - Equipment Failure       1  Manual B - Maintenance or Test     2 - Manual Scran C - Refueling               3  - Autcctatic Scran D - Regulatory restriction   4  - Continued E - Operator Training a     5  - Load Reduction License Exanination     9  - Other (Explain)
F - Administrative G - Operational Error (Explain)
H   Other (Explain)


==SUMMARY==
==SUMMARY==
OF<OPERATING EXPERIENCE DOCKET NO.50-250 UNIT:~ki N DATE: CDNPLETEDBY:
OF< OPERATING EXPERIENCE DOCKET NO.
C.I'HLEPHDNE:
UNIT:
REPORT MONTH December 1997 Unit 3 operated at essentially 100%power for the entire month of December.
DATE:
AVERAGE DAILY UNIT POWER LEVEL MONTH December, 1997 DOCKET NO.50-251 UNIT Turkey Point g4 DATE Jan 05, 1998 COMPLETED BY C.L.Mowrey TELEPHONE (305)246-6204 DAY 12/01/97 12/02/97 12/03/97 12/04/97 12/05/97 12/06/97 12/07/97 12/08/97 12/09/97 12/10/97 12/11/97 12/12/97 12/13/97 12/14/97 12/15/97 12/16/97 12/17/97 12/18/97 12/19/97 12/20/97 12/21/97 12/22/97 12/23/97 12/24/97 12/25/97 12/26/97 12//27/97 12/28/97 12/29/97 12/30/97 12/31/97 AVERAGE DAILY POWER LEVEL (MWe-Net)719 725 727 725 728 735 737 737 734 725 715 713 714 720 730 736 735 735 735 731 727 724 718 7'I6 715 712 713 725 730 730 733 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT UNIT 4 Janua 5 1998 C.L.Mowre Lu-"'" REPORTING PERIOD December 1997 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 744.0 744.0 0.0 7854.5 7810.5 0.0 149307.5 144976.5 577.2 6.Net Electrical Energy (MWH)539998.0 5442559.0 93491637.0 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.50-251 DNIT NAME: T I P I 66 DATE: N~CDMPLETEDEY:
                                                                        ~ki 50-250 N
C~L.T E EDNA:~6 REPORT MONTH December 1997 Date Type Duration (Hours)Reasons Method of Shutting Down Reactor'ause
CDNPLETEDBY:         C.
&Corrective Action to Prevent Recurrence H/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued S-Load Reduction 9-Other (Explain)
I'HLEPHDNE:
'
REPORT MONTH December 1997 Unit 3 operated at essentially 100% power for the entire month of December.
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 251 UNIT         Turkey Point g4 DATE         Jan 05, 1998 COMPLETED BY C. L. Mowrey TELEPHONE   (305) 246 - 6204 MONTH      December, 1997 DAY         AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/97                   719 12/02/97                 725 12/03/97                 727 12/04/97                 725 12/05/97                 728 12/06/97                 735 12/07/97                 737 12/08/97                 737 12/09/97                 734 12/10/97                 725 12/11/97                 715 12/12/97                 713 12/13/97                 714 12/14/97                 720 12/15/97                   730 12/16/97                 736 12/17/97                 735 12/18/97                 735 12/19/97                 735 12/20/97                 731 12/21/97                 727 12/22/97                 724 12/23/97                 718 12/24/97                 7'I6 12/25/97                 715 12/26/97                 712 12//27/97                 713 12/28/97                 725 12/29/97                 730 12/30/97                 730 12/31/97                 733
 
OPERATING DATA REPORT DOCKET NO.                     50-251 UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD December 1997 Janua TURKEY POINT UNIT 4 5 1998 C. L. Mowre Lu (Month/Year)
: 1. Design Electrical Rating (MWe-Net)             720
: 2. Maximum Dependable Capacity (MWe-Net)           693 MONTH     -YTD-   CUMULATIVE
: 3. Number of Hours Reactor Was Critical                 744.0    7854.5    149307.5
: 4. Number of Hours Generator Was On Line                 744.0    7810.5    144976.5
: 5. Unit Reserve Shutdown Hours                             0.0       0.0       577.2
: 6. Net Electrical Energy (MWH)                       539998.0 5442559.0   93491637.0
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
N~
50-251 DNIT NAME:             T I   P I 66 DATE:
CDMPLETEDEY: C~L.
T E EDNA:             ~6 REPORT MONTH December 1997 Date Type     Duration       Reasons     Method                 & Corrective Action to (Hours)                    of                  Prevent Recurrence Reactor'ause Shutting Down H/A F - Forced             Reason                      Method S - Scheduled         A - Equipment Failure       1 - Manual B - Maintenance or Test     2 - Manual Scram C - Refueling               3 - Automatic Scram D - Regulatory restriction   4 - Continued E - Operator Training &     S - Load Reduction License Examination     9  Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETE BY: TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO.           50-251 UNIT:                Turke Point 84 DATE:                Janua 5 1998 COMPLETE BY:          ~C.
50-251 Turke Point 84 Janua 5 1998~C.305 246-6204 REPORT MONTH December 1997 Unit 4 operated at approximately 100%power for the entire month of December.}}
TELEPHONE:            305 246-6204 REPORT MONTH December 1997 Unit 4 operated at approximately 100% power for the entire month of December.}}

Latest revision as of 21:14, 3 February 2020

Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr
ML17354A758
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/31/1997
From: Hovey R, Mowrey C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-98-002, L-98-2, NUDOCS 9801220010
Download: ML17354A758 (12)


Text

CATEGORY 1 REGULAT Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:9801220010 DOC.DATE: 97/12/31 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250

.50-251'urkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION MOWREY,C.L. Florida Power &. Light Co.

HOVEY, R. J. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Dec 1997 for Turkey Point, Unit 3 4.W/980112 ltr. A DISTRXBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: T TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL " ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 '

1 ILE CENTER 1 1 OC/DBA/PAD 1 GN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

N I

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US'TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

~

JANI 23998 L-98-002 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the December 1997 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant CLM Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 980i2200i0 97i23i PDR R

ADOCK 05000250 PDR

~ QgL.

1'iele4~)

j IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII an FPL Group company

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 250 UNIT Turkey Point g3 DATE Jan 05, 1998 COMPLETED BY C. L. Mowrey TELEPHONE (305) 246 - 6204 MONTH December, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/97 721 12/02/97 727 12/03/97 727 12/04/97 725 12/05/97 729 12/06/97 735 12/07/97 738 12/08/97 737 12/09/97 732 12/10/97 720 12/11/97 716 12/12/97 716 12/13/97 717 12/14/97 722 12/15/97 732 12/16/97 735 12/17/97 738 12/18/97 737 12/19/97 737 12/20/97 734 12/21/97 729 12/22/97 721 12/23/97 720 12/24/97 717 12/25/97 717 12/26/97 714 12/27/97 715 12/28/97 727 12/29/97 732 12/30/97 735 12/31/97 736

DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE Janua 5 1998 COMPLETED BY C. L. Mowre TELEPHONE REPORTING PERIOD December 1997 (MonthNear)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 7666.3 153117.8
4. Number of Hours Generator Was On Line 744.0 7571.8 150958.9
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 540845.0 5252350.0 96412556.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: T~IP COMPLETED BY:

J~999 I'ATE:

C. L. M TELEPEDNB: QMP 9-REPORT MONTH December 1997 No. Date Type Duration Reason'ethod of Corrective Action Reactor'ause 4

(Hours) Shutting Co~ents Dawn N/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 Manual B - Maintenance or Test 2 - Manual Scran C - Refueling 3 - Autcctatic Scran D - Regulatory restriction 4 - Continued E - Operator Training a 5 - Load Reduction License Exanination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H Other (Explain)

SUMMARY

OF< OPERATING EXPERIENCE DOCKET NO.

UNIT:

DATE:

~ki 50-250 N

CDNPLETEDBY: C.

I'HLEPHDNE:

REPORT MONTH December 1997 Unit 3 operated at essentially 100% power for the entire month of December.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 251 UNIT Turkey Point g4 DATE Jan 05, 1998 COMPLETED BY C. L. Mowrey TELEPHONE (305) 246 - 6204 MONTH December, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/97 719 12/02/97 725 12/03/97 727 12/04/97 725 12/05/97 728 12/06/97 735 12/07/97 737 12/08/97 737 12/09/97 734 12/10/97 725 12/11/97 715 12/12/97 713 12/13/97 714 12/14/97 720 12/15/97 730 12/16/97 736 12/17/97 735 12/18/97 735 12/19/97 735 12/20/97 731 12/21/97 727 12/22/97 724 12/23/97 718 12/24/97 7'I6 12/25/97 715 12/26/97 712 12//27/97 713 12/28/97 725 12/29/97 730 12/30/97 730 12/31/97 733

OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD December 1997 Janua TURKEY POINT UNIT 4 5 1998 C. L. Mowre Lu (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 744.0 7854.5 149307.5
4. Number of Hours Generator Was On Line 744.0 7810.5 144976.5
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 539998.0 5442559.0 93491637.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

N~

50-251 DNIT NAME: T I P I 66 DATE:

CDMPLETEDEY: C~L.

T E EDNA: ~6 REPORT MONTH December 1997 Date Type Duration Reasons Method & Corrective Action to (Hours) of Prevent Recurrence Reactor'ause Shutting Down H/A F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training & S - Load Reduction License Examination 9 Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point 84 DATE: Janua 5 1998 COMPLETE BY: ~C.

TELEPHONE: 305 246-6204 REPORT MONTH December 1997 Unit 4 operated at approximately 100% power for the entire month of December.