{{#Wiki_filter:REQULA Y INFORMATION DISTR IBUTI SYSTEN (R IDS)ACCESSION NBR: 8609160353 DOC.DATE: 86/09/16 NOTARIZED:
{{#Wiki_filter:REQULA       Y INFORMATION DISTR     IBUTI   SYSTEN (R IDS)
NQ FACIL: 50-400 Shearon Harris Nuclear Power Planti Unit i>Carolina AUTH.NAME AUTHOR AFFILIATION DENDLE>N.Affiliation Not Assigned Affiliation Not Assigned BEATTY>L.V.Af f i 1iation Not Assigned REC IP.NANE RECIPIENT AFFILIATION DENTQN NRC-No Detailed*f f i 1 iation Qiven DOCKET 05000400
ACCESSION NBR: 8609160353           DOC. DATE:   86/09/16 NOTARIZED: NQ               DOCKET FACIL: 50-400 Shearon     Harris Nuclear       Power   Planti Unit i> Carolina       05000400 AUTH. NAME           AUTHOR     AFFILIATION DENDLE> N.           Affiliation Not       Assigned Affiliation Not       Assigned BEATTY> L. V.       Aff i 1iation Not     Assigned REC IP. NANE         RECIPIENT AFFILIATION DENTQN               NRC No     Detailed   *ff i iation 1         Qiven


==SUBJECT:==
==SUBJECT:==
Urges denial of util request for exemption from requirementI under iOCFR50i App E>to conduct full participation exercise of emergency response plan within.i gr before beginning operation of p 1 ant.DISTRIBUTION CODE: YEOED COPIES RECEIVED: LTR I ENCL 8 SIZE: TITLE: Request for NRR Action (e.g.2.206 Petitions) 8<Related Correspondenc NOTES: Application for permit renewal+i led.05000400 RECIPIENT 1D CODE/NAl'1E PNR-A PD2 LA BUCKLEY, B Oi INTERNAL: EDQ/ACB ELD/E 04 COP IES LTTR ENCL RECIPIENT ID CODE/MANE PWR-A PD2 PD ELD/HDSi NRR DIR COPIES LTTR ENCL EXTERNAL: LPDR NSIC 03 05 NRC PDR 02 TOTAL NU"1BER OF COPIES REQUIRED: LTTR i i ENCL I V)R'tl I'>>4)il i>>t>>t'>>I t't>>I.*))'7 V."."-i>>'.>>)P 9>>')PX~>>)))fftt>>>>I>>tlat ft>>, i)')I ()V f"t'<V I't!I.V" ti,<>>.t 0:f I)))t,"I i i">>V I I VV I.">>X f.(>>'0'-<"'Y&#x17d;3 it)')9">>lt rV>>-QQRI>>q" J P+~,'>>'>>>>>>ti 4<'V,, f)VP f,>>J l>>>>'i=I h>>t (I, t i t,'I~,VIV'>>i fl l P.I>>a>>>>t,Q ,')i V i>>
Urges denial of       util   request for exemption from requirementI under iOCFR50i App E>     to conduct   full participation exercise of emergency response plan within. i gr before beginning operation of     p 1 ant.
DISTRIBUTION CODE: YEOED         COPIES RECEIVED: LTR I ENCL         8   SIZE:
TITLE: Request   for NRR   Action (e. g. 2. 206 Petitions) 8<     Related Correspondenc NOTES: Application for permit renewal +i led.                                         05000400 RECIPIENT             COP IES            RECIPIENT          COPIES 1D CODE/NAl'1E         LTTR ENCL        ID CODE/MANE        LTTR ENCL PNR-A PD2 LA                             PWR-A PD2 PD BUCKLEY, B     Oi INTERNAL: EDQ/ACB                                   ELD/HDSi ELD/ E                                  NRR DIR 04 EXTERNAL: LPDR             03                       NRC PDR         02 NSIC            05 TOTAL NU"1BER OF COPIES REQUIRED: LTTR               ii  ENCL


==Dear Mi.Denton:==
I V
I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that, the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or-before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, 8609160353 860916!PDR ADOCK 05000400 H~PDR l
                                                                                                                                                      )
R 'tl I'>>
: 4) il                    i    >>                              >>
t t
                                                                                                                                                                              't>>
t                          I
                                                                                                                                                      '>>I
        .*) )'7 V. "."-  i  >>'. >>)
P I    (    V      I' fftt 9>>')PX
                    ~  >>      ) ))              >>                                        t! I.V" ti,                        t,
                    >>  I>>      tlat ft i)')
                                          >>,            )V f "t '<
                                                                            <>>.t    0:f I)))
i  i"        >>V                        I VV
                                                                                                                                                                        >>>>'i "I
I                                I
                          .">>X      f.(>>              lt                >>  -QQRI>>q"            P+~,     '>> '>>>>>>    ti 4    <'V,,
f)                      f,>>J l              =
I
'0'- <" 'Y'3              it)') 9"          >>      rV J
VP i t,'I                                             l P.
(I,     h>>t t
                                                                                                ~,VIV          '>>i fl
                                                                                                                                    >> a>>>>
I t,Q
                                                                              ')i V i>>


==Dear Mr.Denton:==
==Dear Mi. Denton:==
wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the C3mpany conduct~a'full participation exercise~"of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely,


4'4l,a as~Rl e Oe~4
I wish to urge denial of  CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that, the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or-before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at  all.
Sincerely, 8609160353 860916!
PDR  ADOCK 05000400 H        ~     PDR  l


==Dear Mr.Denton:==
==Dear Mr. Denton:==
  ,r J I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely,}}
 
wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the C3mpany conduct~a 'full participation exercise~"of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
 
4' 4l,a as~
Rl                    ,r e
Oe ~                J 4
 
==Dear Mr. Denton:==
 
I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,}}

Latest revision as of 19:02, 3 February 2020

Urges Denial of Util Request for Exemption from Requirement, Under 10CFR50,App E,To Conduct Full Participation Exercise of Emergency Response Plan within 1 Yr Before Beginning Operation of Plant
ML18022A402
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/16/1986
From: Beatty L, Dendle M
AFFILIATION NOT ASSIGNED
To: Denton
NRC
References
NUDOCS 8609160353
Download: ML18022A402 (7)


Text

REQULA Y INFORMATION DISTR IBUTI SYSTEN (R IDS)

ACCESSION NBR: 8609160353 DOC. DATE: 86/09/16 NOTARIZED: NQ DOCKET FACIL: 50-400 Shearon Harris Nuclear Power Planti Unit i> Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION DENDLE> N. Affiliation Not Assigned Affiliation Not Assigned BEATTY> L. V. Aff i 1iation Not Assigned REC IP. NANE RECIPIENT AFFILIATION DENTQN NRC No Detailed *ff i iation 1 Qiven

SUBJECT:

Urges denial of util request for exemption from requirementI under iOCFR50i App E> to conduct full participation exercise of emergency response plan within. i gr before beginning operation of p 1 ant.

DISTRIBUTION CODE: YEOED COPIES RECEIVED: LTR I ENCL 8 SIZE:

TITLE: Request for NRR Action (e. g. 2. 206 Petitions) 8< Related Correspondenc NOTES: Application for permit renewal +i led. 05000400 RECIPIENT COP IES RECIPIENT COPIES 1D CODE/NAl'1E LTTR ENCL ID CODE/MANE LTTR ENCL PNR-A PD2 LA PWR-A PD2 PD BUCKLEY, B Oi INTERNAL: EDQ/ACB ELD/HDSi ELD/ E NRR DIR 04 EXTERNAL: LPDR 03 NRC PDR 02 NSIC 05 TOTAL NU"1BER OF COPIES REQUIRED: LTTR ii ENCL

I V

)

R 'tl I'>>

4) il i >> >>

t t

't>>

t I

'>>I

.*) )'7 V. "."- i >>'. >>)

P I ( V I' fftt 9>>')PX

~ >> ) )) >> t! I.V" ti, t,

>> I>> tlat ft i)')

>>, )V f "t '<

<>>.t 0:f I)))

i i" >>V I VV

>>>>'i "I

I I

.">>X f.(>> lt >> -QQRI>>q" P+~, '>> '>>>>>> ti 4 <'V,,

f) f,>>J l =

I

'0'- <" 'Y'3 it)') 9" >> rV J

VP i t,'I l P.

(I, h>>t t

~,VIV '>>i fl

>> a>>>>

I t,Q

')i V i>>

Dear Mi. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that, the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or-before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, 8609160353 860916!

PDR ADOCK 05000400 H ~ PDR l

Dear Mr. Denton:

wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the C3mpany conduct~a 'full participation exercise~"of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

4' 4l,a as~

Rl ,r e

Oe ~ J 4

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,