ML18004B558
| ML18004B558 | |
| Person / Time | |
|---|---|
| Site: | Harris, Shoreham File:Long Island Lighting Company icon.png |
| Issue date: | 10/27/1986 |
| From: | Frauendofer B, Heigh D, Jerrica Johnson, Radtke R, Shriver D, Sonderson M, Stickland H AFFILIATION NOT ASSIGNED |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8610290409 | |
| Download: ML18004B558 (18) | |
Text
REQ ORY INFORNATIQN DISTRIBU N SYSTEII (R IDS)
ACCESSION NBR: 8610290409 DOC. DATE: 86/10/27 NOTARIZED:
NO DOCKET 0 FACIL: 50-400 Shearon Hav v is Nuclear Power Planti Unit i.
Cav olina 05000400 AUTH. NAHE AUTHOR AFFILIATION AFFiliation Not Assigned SQNDERSQNi l'1. L.
AffiliationNot Assigned STICKLANDiH. B Affiliation Not Assigned RECIP. NANE RECIPIENT AFFILIATION Office of Nucleav Reactor Regulationi Divector
<post 851125
SUBJECT:
Urges denial of util v equest for exemption fv om requiv ement of 10CFR50i App E that util conduct full pav'ticipation exercise of emergency v'esponse plan within 1 gr bef ov'e beginning c ommerc ial op erat ion of p lant.
DISTRIBUTION CODE:
YE03D COPIES RECEIVED: LTR ENCL SIZE:
TITLE: Request fov'RR Action (e. g.
2 206 Petitions) 8< Related Corv'espondenc NOTES: Application for permit renetoal filed.
05000400 RECIPIENT ID CODE/NAl'tE PNR-A PD2 LA BUCNLEY, B 01 COPIES LTTR ENCL RECIPIENT ID CODE/NAl'lE PWR-A PD2 PD COPIES LTTR ENCL INTERNAL: EDO/ACB E
Q FIl EXTERNAL:
LPDR NSIC 04 03 05 ELD/HDSi NRR DIR NRC PDR 02 TOTAL NUNBER OF COP1EB REQUIRED:
LTTR D1, ENCL
>>>>>>)
P, W> i.i
,I I'f U>>>It'>>I ClC>>>I
$ ~ I Ii I
)>>
J tf
~
W, i
- ~
It i
>> II
'Pj '>PQI I>>>"j'hk>>
i,i i I
>>P L
)>>, -I
~.
~ I>ill'>>
P i".
I't f>
't>> 'I
~if
,Ii
>> >lt>>
i AIW I
'i,>>
Dear Hr. Denton:
8hi0290409 86g0P7 PDR ADOCK 05000400 H
PDR I wish to urge denial of CPBL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full par ticipation exercise of the Emergency
Response
nt Plan for its Shearon Harris nuclear power plan within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
I)EX'!inruguv CD IA/ t /
ldg Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington<
DC 20555
t
Dear Mr. Denton:
I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear pover plant vithin one year before beginning commercial operation of the plant or before operating at greater than five percent of rated pover.
.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Vi
,N <
iri i w f
/s'il Hr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
Dear Hr. Denton:
I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
/g~
pg W
p) )fy 24 Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
lw
~
~
Dear Mr. Denton:
'I wish to urge denial of CPSL's request; for exemption from the requirement, under';"10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
~
> ig
<.X, C'od
~o an I 2l OCT
/an/>
'j
. s,.i~le(. ~,g I IVV 0'4 J f/ l Hr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Denton:
r' wish to urge denial of CP6L's request+for exemption from the requirement, under fO CPR 50, Appendix E, that the Company conduct, a full participation exercise of the Emergent
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is. permitted to operate at all.
Sincerely,
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington<
DC 20555
Dear'Mr. Denton:
I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
r g4
~
/g bA
, cn c
0<>
1480 vsn ~
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Nashington, DC 20555
Dear Mr. Dentonc V
I wish to urge, denial of CPLL's request for exemption from the requirement, under 10 CPB 50, Appendix E, that the Company.conduct a full participation exercise~of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Mashington, DC 20555
Dear Mr. Den@on:
I wish to urge denial of CPEL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
Hr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commissio Nashington, DC 20555 A
~
J Vlf<+>> tQ c