ACCE'BSIQQ NBR:
FAC IL:50-400 AUTH. NANE DUTRQWi V.
DAUISi W.
('ARDS N.
REC IP. NANE DENTQNi H. R.
REQUL
.QRY INFORMATION DISTRIBUT SYSTEN (RIDS) 8610200326 DOC. DATE: 86/10/15 NOTARIZED:
NO DOCKET Shearon Harris Nuclear Power Plant>
Unit 1.
Cav olina 05000400 AUTHOR AFFILIATION AffiliationNot Assigned AffiliationNot Assigned Affiliation Not Assigned RECIPIENT AFFILIATION Office of Nuclear Reactor Regulation>
Direc tov (post 851125 05000400 SUB JECT:
Uv'ges denial of util v'equest fov exemption fv'om 10CFR50i App E requiv ement for full pav ticipation exev cise of emergency vesponse plan within 1 gr of beginning commev cial opev'ation. Evacuation plan changes needed.
DISTRIBUTION CODE:
YEOBD COPIEB RECEIVED: LTR + ENCL(
SIZE:
TITLE: Request fov NRR Action (e. g.
- 2. 206 Petitions)
Zc Related Correspondenc NOTES: Application for pevmit v eneeal filed.
RECIPIENT ID CODE/MANE PWR-A PD2 LA BUCNLEY> B 01 INTERNAL EDQ/ACB D
REC FILE COPIES LTTR ENCL RECIPIENT ID CODE/NANE PWR-A PD2 PD ELD/HDS1 NRR DIR COPIES LTTR ENCL 1
EXTERNAL: LPDR NSIC 03 05 NRC PDR 02 TOTAL NUNBER OF CQP IES REGUIRED:
LTTR 44 ENCL 11
I I
II
- 'II 1
h I
H l
~
Dear Mr. Denton:
gpO pat~~. g
)y0 Sincerely,
/
I wish to urge denial of CP&L's request for I
exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation or the plant or before operating at greater than five percent of rated power.
-Because of the need for changes in the evacua-t'on plan I believe this exercise should be son I
t conducted before the plant is permitted o
operate at all.
Bbi020032b 86i015 +
PDR ADQCK 05000400, H
Dear Mr. Denton:
wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted operate at all.
Sincerely, I~
.g, Q 'I 8'l ~. ~~i<
~ Ktll AK'+eIq py5 DIa
Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555
Dear" Hr. Denton:
t -~r Pj Qm wish to urge denial of CPSL's request for exemption from the'requirement, under 10 CFR Appendix E, that the Company qonduct a full participation exercise of the Igmergency Plan for its Shearon Harris nuclear power plant within one year before beginning comm<<ci>>
operation of the plant or before operating at greater than five percent of rated powers Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Si cerely,
C' F'td 0) i'c'
~~ v mc ~a~
i Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
=.-
Dear Mr. Denton:
I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emerg6Vycy Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercia3.
operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
Vg v
~ ~
OCT/98'Rt t
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
>(7lti
Dear Mr..Denton:
a
I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conducg a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear'power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercisa should be conducted before the plant is permitted to operate at all.
Sincerely,
i.4l Jw
'<<n 5 OCT
/986
~A IX
> FF /
Mr. Harold Deixton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington
-, DC=
20555
~
VL
Dear Mr; Denton:
wish to urge denial of CPS.L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Nashington, DC 20555
Dear..Mr.,
Denton:
wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50 Appendix E
that the Company conduct a full participation exercise of-the Emerncy
Response
Plan for its Shearon Harris nucleai~power plant within one year before beginning commercial operation of the plant or before op<<ating greater than five percent of rated pow<<-
Because of the need for changes in the evacua-tion plan, l believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
gGH
~ PhA C
I; W7 (
/sac Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Denton:
I wish to urge denial of CPS,L's request for exemption from t e requiremen
, under 10 CFR 50, Appendix E, that the Company cond~4 a full participation exercise of the Emergency
Response
Plan-for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated powers Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
$6Ha +
[~
,4 15 vlf
'-- -'9' Kiaclaigl: is
~ ~
/
Mr. Harol:d Denton, Director Office~of Nuclear Reaction Regulatiop Nucleai Regulatory Commission Washington, DC 20555
Dear'r".-",
Dent.on:
I wish to urge denial of CPEL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Flan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
GLUE TO UQyEO
" CEREBRAL PALg'y HELP DIS)g[EO pygmy lee l
t Mr. Harold Denton, Director Office of. Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
PaAPd S~
~
I7d 8 7A Ou/<~
cf y lH'((
/6'r.
Harold Denton, Director Office. of.'uclear Reaction Reguiatiop Nuclear Regulatory Commission Nashington, DC 20555
Dear Mr. Denton:
I wish to urge denial of CP&L's request for exemption from the requirement, under 10 CUR 50, Appendix E, that the Company cond~
a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant withj.n. one.year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regul'atory Commission Nashington, DC 20555
k
Dear Hr. Denton=:
~
I wish to urge denial of CPEL's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant withe.n. one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
-Because of the need for changes ig the evacua-tion plan, I believe this exercised should be cahducted before the plant is permitted to operate at,al Sincerely,
~S 0CT as~
L Mr. Harold Denton, Director Office of Nuclear Reaction Regu?atiop Nuclear Regulatory Commission Washingtoni DC 20555
De~ Mr.
Den ton:
I wish to urge denial of CPS,L '
request for exemption from the requirement, under 1 0 CFR 50, Appendix E, tha t the Company ~onduc t a fu 1 1 parti.cipati on exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant withe.n one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power
~
Because of the need for changes in the evacua-tion plan, l believe this exercise should be conducted before the plant is permitted to operate at al 1 ~
Sincerely,
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC'0555
Dear Mr. Denton:
I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for-its Shearon Harris nuclear power plant within. one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
gp,:
gGH C) laii~~>>
~SA t/V Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Nashington, DC 20555
Dear Mr. Denton:
I wish to urge denial of CPS,L's request for exemption from the requirement, ~er 10 CFR 50, Appendix E, that the Company conddct a full participation exercise of the Emergency
Response
Plan for:its Shearon Harris nuclear power plant withe.n. one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
ss~an&c4.
Ph4
") CCj lgg6 Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
Dear Hr'. Denton:
I wish to urge denial of CPSL's repast for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,4~3 ~as
<<se
Ã~~;
~~~
4~~VO OP Mr. Harold Denton, Director Office of Nuclear Reaction Regu1atiop Nuclear Regulatory Commission Nashington, DC 20555
Dear-Mr.
Denton:
I wish to urge denial of CPSI 's request for exemption from the requirement,. under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant with n. one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Denton:
I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within. one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
-Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
Dea'r" Mr.'enton:
I wish to urge denial of CP&L's request for exemption from'(he requirement, under 10 CPR 50, Appendix E, thaO the Company conduct a full participation e'xercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within. one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
g/ ~gl~"~
p.
,Sinclhii I~wis <
Mr. Harold Denton, Director Office of Nuclear Reaction ReguXatiop Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Deqgon:
I wish to urge denial of CPSL's reqgMt for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
~aAE r~Hi fy~
6'co Qualm~ AAC. g7 dg'EXTKA~ggfpV Y
f==-p,'=::PRf."'=
===.:=:Pi8
'OMPACT YOUR @OS'g Mr. Harold Denton, Director Office of Nuclear Reaction Reguiatiop Nuclear Regulatory Commission Washingtont DC 20555
Dear Mr. Denton:
I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the,.Company conduct a full participation exercise 'of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within. one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerel
AJ C s i.~~
~~C W'lexrD~w P
I-"ÃPBES
~~aa P/F@gg ~
Mr. Harold Denton,.Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission.
Washington, DC 20555
Dear Mr.'enton:
I wish to urge denial of CPS,L's request for exemption from. the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
plan for its Sh'baron Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
~~+~QCAP c s4
~AUGH'M 0) lr ocr i~so Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Denton:
I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nucl'eai3 power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
i OCf le86 Mr.
H'ar old Denton, Director Office= of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Nashington, DC 20555
if t
Dear Mr; D nton:
l wish to urge denial of CPS,L's request for exemption from the requirement, under gl CFR 50, Appendix E, that the Company condugt a full participation exercise o~the Emergency
Response
Plan for its Shearon Har~s nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sine rely,
'5 OCT
/crab~
~1 Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555 J'
Dear Mr. Denton:
I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant 's permitted to operate at all.
Sincerely,
~111 QfQj~~
f$ in /
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatio~
Nuclear Regulatory Commission Nashington>
DC 20555
Dear Mr. Denton:
I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial ope"ation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Denton:
l wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CER 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
-Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at a l.
Sincerely,
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
Dear Hr. Denton:
I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CI:R 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
-Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Denton:
I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
'Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Denton:
I wish to.urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely, g~ '
c go 15 OCT.
SO6 GgE TO UHI7EOf'-
CEBEBRAL PAI.S'F,jfj HELP DlSNLEO P fk C
/
p Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington<
DC 20555 l))fiflli)i~lili~li)iililsi(tidal
Dear,
.Hr. Denton:
r I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, A pendix E, that the Company conduct a full ppen part,~cipation exercise of the Emergency
Response
Flan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
/gal
Mr. Harold Denton, Director Office of Nuclear Reaction Regupatiop Nuclear Regulatory Commission Nashington, DC 20555
fIvi
Dear Mr. De ton:
I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan -for its Shearon Harris nuclear power plant
.within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
H,y o tao 4e
~~~ @le'~ sv4 igGQ 4indai~s--
NE.AT Q,Y DELIVQAV Mr. Harold Denton, Director Office of Nuclear Reaction Regul~tiop Nuclear Regulatory Commission Washington, DC 20555
- 4 f.
Dear M. Denton:
4
'mk
~
~
~
I wish to urge denial of CPE,L's request for exemption from the requirement,
~nder 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan-for its Shearon Harris nuclear~power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for chahgek in the evacua-tion plan, I believe this'exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
Mr. Harold Denton< Director Office of Nuclear Reaction Regukatiop Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Denton:
conducted before the plant xs perm operate at all.
I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that. the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon-Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be ted to Sincerely,
@II J)%ICT
/986 U
11Clll Lc Mr. Harold Denton, Director Office of Nuclear Reaction Regula.8tiop Nuclear Regulatory Commission Washington,
-DC 20555
à f
Dear Hr,
Denton.>>
I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CER 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
-Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
Mr. Harold Denton, Director Office of Nuclear Reaction Regu3.atiop Nuclear ReguXatory Commission Washington, DC 20555
Dear Mr. Denton:
,'I l
I wis'h to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct+
a full participation exercise of the Emerency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the-plant is permitted to operate at all.
Sincerely,
Mr. Harold Denton, Director Office of Nuclear Reaction Regukatiop Nuclear Regulatory Commission Nashington, DC 20555 l i')illiiiililiiii))i/iIiiiHil
Dea'r Mr. Denton:
I wish to urge denial of CP6L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear~power.plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
0
'I
~ -Dear Mr". Denton:.
I wish to urge denial of CPSL's'equest for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduc~ full parti.'cipation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within. one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
~Q8t PU CA igloo mc ai ~w>>
ae I Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Denton:
I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergqpcy
Response
Plan for its-Shearon Harris nucleag+ower plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
isa e~
~~
~ P Jul
~ '5 OC7
/956 a
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Hashington, DC 20555
Dear Hr. Denton:
~
p
~
I wish to urge denial of CP&L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company cond t
a full participation exercise. of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within. one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regu1atory Commission Washington, DC 20555 1ii fittl<<iililiif)liili)i<<tl)f
Dear Hr; Denton:
I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company condo/
a full parti.cipation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within. one year before beginning commercial
.operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Reguliatory Commission Washington, DC 20555
Dear Mr. Denton:
I wish to urge denial of CPEL's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise.of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely, I ~ ~