Urges Denial of Util Request for Exemption from 10CFR50, App E Requirement for Full Participation Exercise of Emergency Response Plan within 1 Yr of Beginning Commercial Operation.Evacuation Plan Changes Needed
ML18004A597
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/15/1986
From: Aycock S, Burger A, Chalaron P, Connell K, Davis W, Donahue M, Dutrow K, Jorgensen C, Majyari P, Maya D, Moranski K, Peck C, Peck H, Savage C, Savage W, Shelp H, Sitz J, Snyder D, Stumpf L, Ward M, Wilson L, Yates R, Yates Y, Matt Young
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8610200326
Download: ML18004A597 (83)


Text

REQUL .QRY INFORMATION DISTRIBUT SYSTEN (RIDS)

ACCE'BSIQQ NBR: 8610200326 DOC. DATE: 86/10/15 NOTARIZED: NO DOCKET FAC IL: 50-400 Shearon Harris Nuclear Power Plant> Unit 1. Cav olina 05000400 AUTH. NANE AUTHOR AFFILIATION DUTRQWi V. Affiliation Not Assigned DAUISi W. Affiliation Not Assigned N.

('ARDS Affiliation Not Assigned REC IP. NANE RECIPIENT AFFILIATION DENTQNi H. R. Of fice of Nuclear Reactor Regulation> Direc tov (post 851125 SUB JECT: Uv'ges denial of util v'equest f ov exemption fv'om 10CFR50i App E requiv ement for full pav ticipation exev cise of emergency vesponse plan within 1 gr of beginning commev cial opev'ation. Evacuation plan changes needed.

DISTRIBUTION CODE: YEOBD COPIEB RECEIVED: LTR + ENCL( SIZE:

TITLE: Request fov NRR Action (e. g. 2. 206 Petitions) Zc Related Correspondenc NOTES: Application for pevmit v eneeal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/MANE LTTR ENCL ID CODE/NANE LTTR ENCL PWR-A PD2 LA PWR-A PD2 PD 1 BUCNLEY> B 01 INTERNAL EDQ/ACB ELD/HDS1 D NRR DIR REC FILE EXTERNAL: LPDR 03 NRC PDR 02 NSIC 05 TOTAL NUNBER OF CQP IES REGUI RED: LTTR 44 ENCL 11

I I

II

  • 'II 1

h I

H l

~

Dear Mr. Denton:

I wish to urge denial of CP&L's request for I exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation or the plant or before operating at greater than five percent of rated power.

-Because of the need for changes in the evacua-t'on son plan I I believe this exercise should be conducted before the plant is permitted t o operate at all. gpO Sincerely, pat~~. g

)y0

/

Bbi020032b 86i015 +

PDR ADQCK 05000400, H PDR

Dear Mr. Denton:

wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted operate at all.

Sincerely,

~

~

I

.g, Q 'I 8'l ~. ~~i< py5 DIa Ktll AK'+eIq

Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

t -~r Pj

Dear" Hr. Denton:

Qm wish to urge denial of CPSL's request for exemption from the'requirement, under 10 CFR Appendix E, that the Company qonduct a full participation exercise of the Igmergency Plan for its Shearon Harris nuclear power plant within one year before beginning comm<<ci>>

operation of the plant or before operating at greater than five percent of rated powers Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Si cerely,

F'td C' ~~

mc ~a~

v i'c' 0) i Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

=.-

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emerg6Vycy Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercia3.

operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Vg

/98'Rt v ~

OCT

~

t Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

>( a

7lti

Dear Mr..Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conducg a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear'power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercisa should be conducted before the plant is permitted to operate at all.

Sincerely,

i.4l Jw

'<<n 5 OCT

~A

/986 IX

> FF /

Mr. Harold Deixton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington -, DC= 20555

~ VL

Dear Mr; Denton:

wish to urge denial of CPS.L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Nashington, DC 20555

Dear..Mr.,

Denton:

wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50 Appendix E that the Company conduct a full participation exercise of- the Emerncy Response Plan for its Shearon Harris nucleai~power plant within one year before beginning commercial operation of the plant or before op<<ating greater than five percent of rated pow<<-

Because of the need for changes in the evacua-tion plan, l believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

gGH

~ PhA C

I; W7 ( - /sac Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,L's request for exemption from t e requiremen , under 10 CFR 50, Appendix E, that the Company cond~4 a full participation exercise of the Emergency Response Plan-for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated powers Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

$6Ha + Kiaclaigl: is 15

-'9'

,4 vlf

[~

~ ~

USA

/

Mr. Harol:d Denton, Director Office~of Nuclear Reaction Regulatiop Nucleai Regulatory Commission Washington, DC 20555

Dear'r".-",

Dent.on:

I wish to urge denial of CPEL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Flan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

GLUE TO UQyEO

" CEREBRAL PALg'y HELP DIS)g[EO lee l pygmy t

Mr. Harold Denton, Director Office of. Nuclear Reaction Regulatiop .

Nuclear Regulatory Commission Washington, DC 20555

PaAPd S~ ~

I7d 8 7A Ou/<~

cf y lH'((

/6'r.

Harold Denton, Director Office. of.'uclear Reaction Reguiatiop Nuclear Regulatory Commission Nashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CP&L's request for exemption from the requirement, under 10 CUR 50, Appendix E, that the Company cond~ a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant withj.n. one .year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regul'atory Commission Nashington, DC 20555

k

Dear Hr. Denton=:

~

I wish to urge denial of CPEL's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant withe.n. one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

-Because of the need for changes ig the evacua-tion plan, I believe this exercised should be cahducted before the plant is permitted to operate at,al Sincerely,

~S 0CT as~

L Mr. Harold Denton, Director Office of Nuclear Reaction Regu?atiop Nuclear Regulatory Commission Washingtoni DC 20555

De~ Mr . Den ton:

I wish to urge denial of CPS,L ' request for exemption from the requirement, under 1 0 CFR 50, Appendix E, tha t the Company ~onduc t a fu 1 1 parti.cipati on exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant withe.n one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power ~

Because of the need for changes in the evacua-tion plan, l believe this exercise should be conducted before the plant is permitted to operate at al 1 ~

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC'0555

Dear Mr. Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for-its Shearon Harris nuclear power plant within. one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

gGH laii~~>>

C) gp,: ~SA t/V Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Nashington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, Appendix E, that the Company

~er conddct a 10 CFR 50, full participation exercise of the Emergency Response Plan for:its Shearon Harris nuclear power plant withe.n. one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

ss~an&c4.

Ph4

") CCj lgg6 Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Hr'. Denton:

I wish to urge denial of CPSL's repast for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, 4~3 ~as

~~~ 4~~VO

Ã~~;

OP

<<se Mr. Harold Denton, Director Office of Nuclear Reaction Regu1atiop Nuclear Regulatory Commission Nashington, DC 20555

Dear-Mr. Denton:

I wish to urge denial of CPSI 's request for exemption from the requirement,. under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant with n. one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within. one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

-Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dea'r" Mr.'en ton:

I wish to urge denial of CP&L's request for exemption from'(he requirement, under 10 CPR 50, Appendix E, thaO the Company conduct a full participation e'xercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within. one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

g/ ~gl~"~ p. ,Sinclhii I~wis <

Mr. Harold Denton, Director Office of Nuclear Reaction ReguXatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Deqgon:

I wish to urge denial of CPSL's reqgMt for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

~aAE 6'co dg'EXTKA~ggfpV r~Hi fy~

f==-p,'=::PRf." '= Y

===.:=:Pi8 Qualm~ AAC. g7 YOUR @OS'g 'OMPACT Mr. Harold Denton, Director Office of Nuclear Reaction Reguiatiop Nuclear Regulatory Commission Washingtont DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the,.Company conduct a full participation exercise 'of the Emergency Response Plan for its Shearon Harris nuclear power plant within. one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerel

AJ Cs i.~~ ~~C P W'lexrD~w I-"ÃPBES

~ ~aa P/F@gg

~

Mr. Harold Denton, .Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission.

Washington, DC 20555

Dear Mr.'enton:

I wish to urge denial of CPS,L's request for exemption from. the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response plan for its Sh'baron Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, s4

~~+~QCAP c

'M

~AUGH 0) lr ocr i~so Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nucl'eai3 power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

i OCf le86 Mr . H'ar old Denton, Director Office= of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Nashington, DC 20555

if t

Dear Mr; D nton:

l wish to urge denial of CPS,L's request for exemption from the requirement, under gl CFR 50, Appendix E, that the Company condugt a full participation exercise o~the Emergency Response Plan for its Shearon Har~s nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sine rely,

'5/crab~

OCT

~1 Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555 J'

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant 's permitted to operate at all.

Sincerely,

~111 Q fQ j~~

f$ in /

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatio~

Nuclear Regulatory Commission Nashington> DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial ope"ation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

l wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CER 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

-Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at a l.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Hr. Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CI:R 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

-Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

'Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to .urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, g~

c GgE TO UHI7EOf'-

go CEBEBRAL PAI.S'F,jfj 15 OCT. HELP DlSNLEO P fk C

/ p SO6 Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington< DC 20555 l))fiflli)i~lili~li)iililsi(tidal

Dear,

.Hr. Denton:

r I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, pendix E, that the Company conduct a full A ppen part,~cipation exercise of the Emergency Response Flan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

/gal

Mr. Harold Denton, Director Office of Nuclear Reaction Regupatiop .

Nuclear Regulatory Commission Nashington, DC 20555

fIvi

Dear Mr. De ton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan -for its Shearon Harris nuclear power plant

.within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

H,y 4indai~s--

NE.AT Q,Y DELIVQAV o tao 4e

~~~ @le'~ sv4 igGQ Mr. Harold Denton, Director Office of Nuclear Reaction Regul~tiop Nuclear Regulatory Commission Washington, DC 20555

Denton:f.

4 I

Dear M . ~ ",

~ ~

4 'mk wish to urge denial of CPE,L's request for exemption from the requirement, ~nder 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan- for its Shearon Harris nuclear~power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for chahgek in the evacua-tion plan, I believe this'exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton< Director Office of Nuclear Reaction Regukatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that. the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon-Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant xs perm ted to operate at all.

Sincerely,

@II 11Clll Lc J)%ICT

/986 U Mr. Harold Denton, Director Office of Nuclear Reaction Regula.8tiop Nuclear Regulatory Commission Washington, -DC 20555

à f

Dear Hr,

Denton.>>

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CER 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

-Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regu3.atiop Nuclear ReguXatory Commission Washington, DC 20555

,'I

Dear Mr. Denton:

l I wis'h to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct+ a full participation exercise of the Emerency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the- plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regukatiop Nuclear Regulatory Commission Nashington, DC 20555 l i') illi iiililii ii)) i/iI i iiHil

Dea'r Mr. Denton:

I wish to urge denial of CP6L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear~power.plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

0

'I

~

Dear Mr". Denton:

I wish to urge denial of CPSL's'equest for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduc~ full parti.'cipation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within. one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

~Q8t mc ai ~w>>

PU CA ae I igloo Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergqpcy Response Plan for its-Shearon Harris nucleag+ower plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

isa e~

~~ ~ P Jul a

~ '5 OC7

/956 Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Hashington, DC 20555

p ~

Dear Hr. Denton:

~

I wish to urge denial of CP&L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company cond t a full participation exercise. of the Emergency Response Plan for its Shearon Harris nuclear power plant within. one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regu1atory Commission Washington, DC 20555 1ii fit tl<<iililiif) liili)i<<tl)f

Dear Hr; Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company condo/ a full parti.cipation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within. one year before beginning commercial

.operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Reguliatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPEL's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise .of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, I ~ ~