ML18004A552

From kanterella
Jump to navigation Jump to search
Urges Denial of Util Request for Exemption from full-scale Drill of Evacuation Plan.Problems W/May 1985 Drill Underline Need for Addl Drill
ML18004A552
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/27/1986
From: Crossen C
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8610060390
Download: ML18004A552 (4)


Text

REGUL/ QRY INFQR>WTIQN DIBTRlaUTI ~ SYSTEN (R IDS)

ACCESSION NBR: Gbi0060390 DOC. DATE: 86/09/27 NOTARIZED: NQ DOCKET FACIL: 50-400 Shearon Harris Nuclear Power Planti Unit i. Carolina 05000400 AUTH. NANE AUTHOR AFFILIATION CROSBEN> C. R. Affiliation Not Assigned RECIP. NANE RECIPIENT AFFILIATION DENTQNp H. R. Office of Nuclear Reactor Regulationi Director (post 85ii25

SUBJECT:

Urges denial of util request for exemption from ful 1-scale drill of evacuation plan. Problems e/Nag 1'785 drill underline need f or add 1 dri 1 l.

DISTRIBUTION CODE: YE03D COPI EB RECEIVED: LTR ENCL SI ZE:

TITLE: Request for NRR Action (e. g. 2. 206 Petitions) 0 Related Correspondenc NOTES: Application for permit renewal -Fi led. 05000400 RECIPIENT COP IEB RECIP I ENT COP IEB ID CODE/NANE LTTR ENCL ID CODE/MANE LTTR ENCL PMR-A PD2 LA PWR-A PD2 PD BUCl(LEY, 8 Oi INTERNAL: EDO/ACB ELD/HDSi ELD/R NRR DIR 04 EXTERNAL: LPDR 03 NRC PDR 02 NSIC 05 C)

TOTAL NUNBER OF COPIES REQUIRED: LTTR ii ENCL

I f,

~ -'

t'

Harold Denton Office of Nuclear Reactor Regulation Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I am writing to insist that you do not grant CPErL's request for an exemption from a full-scale Shearon Harris Nuclear Power Plant.

drill of the evacuation plan for the This full-scale drill is required by law and was part of an agreement made between CPErL and the Chatham County Board of Commissioners, under which the Board agreed to rejoin the evacuation plan.

A full scale drill is needed because there were problems with the drill conducted in May of 1985, and because there have been changes made to the plan since that time.

Both Lee and Chatham Counties have instituted some changes, and only a full-scale drill will reveal whether those changes will resolve the many problems raised after the 1985 drill, and since that time.

A "scaled down" drill involving only a test of notification procedures, and without the participation of all state level participants in the plan, is simply not adequate to test the plan's effectiveness, nor to ensure that local residents will be adequately protected in the event of an accident.

I do not believe that CML should be allowed to be exempt from the law, especially since they have led our public officials to believe that a full-scale drill will be conducted this summer or fall.

Yours sincerely,