ML18022A402
| ML18022A402 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 09/16/1986 |
| From: | Beatty L, Dendle M AFFILIATION NOT ASSIGNED |
| To: | Denton NRC |
| References | |
| NUDOCS 8609160353 | |
| Download: ML18022A402 (7) | |
Text
REQULA Y INFORMATION DISTR IBUTI SYSTEN (R IDS)
ACCESSION NBR: 8609160353 DOC. DATE: 86/09/16 NOTARIZED:
NQ FACIL: 50-400 Shearon Harris Nuclear Power Planti Unit i> Carolina AUTH. NAME AUTHOR AFFILIATION DENDLE> N.
Affiliation Not Assigned Affiliation Not Assigned BEATTY>L. V.
Affi1iation Not Assigned REC IP. NANE RECIPIENT AFFILIATION DENTQN NRC No Detailed *ffi 1 iation Qiven DOCKET 05000400
SUBJECT:
Urges denial of util request for exemption from requirementI under iOCFR50i App E> to conduct full participation exercise of emergency response plan within. i gr before beginning operation of p 1 ant.
DISTRIBUTION CODE:
YEOED COPIES RECEIVED: LTR I ENCL 8 SIZE:
TITLE: Request for NRR Action (e. g.
- 2. 206 Petitions) 8< Related Correspondenc NOTES: Application for permit renewal +iled.
05000400 RECIPIENT 1D CODE/NAl'1E PNR-A PD2 LA BUCKLEY, B Oi INTERNAL: EDQ/ACB ELD/ E 04 COP IES LTTR ENCL RECIPIENT ID CODE/MANE PWR-A PD2 PD ELD/HDSi NRR DIR COPIES LTTR ENCL EXTERNAL: LPDR NSIC 03 05 NRC PDR 02 TOTAL NU"1BER OF COPIES REQUIRED:
LTTR ii ENCL
I V
)
R 'tl I'>>
- 4) il i
t t'>>I t
't>>
I
.*) )'7 V.
"."- i
>>'. >>) P 9>>')PX
~
) )) fftt >>
>> I>>
tlat ft >>, i)')
I
(
)V f "t V
I '
t! I.V" ti,
<>>.t 0:f I)))
t, "I i i"
>>V I
I VV I
.">>X f.(>>
'0'-
<" 'Y'3 it)')9" >>
lt rV
>> -QQRI>>q" J P+~,
'>> '>>>>>> ti 4
<'V,, f)
VP f,>>J l >>>>'i
=
I h>>t (I, t i t,'I
~,VIV
'>>i fl l P.
I a>>>>
t,Q
, ')i V i>>
Dear Mi. Denton:
I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that, the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or-before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely, 8609160353 860916!
PDR ADOCK 05000400 H
~
PDR l
Dear Mr. Denton:
wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the C3mpany conduct~a 'full participation exercise~"of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
4'4l,a as~
Rl e
Oe
~
4
Dear Mr. Denton:
,r J
I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,