ML18022A402

From kanterella
Jump to navigation Jump to search
Urges Denial of Util Request for Exemption from Requirement, Under 10CFR50,App E,To Conduct Full Participation Exercise of Emergency Response Plan within 1 Yr Before Beginning Operation of Plant
ML18022A402
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/16/1986
From: Beatty L, Dendle M
AFFILIATION NOT ASSIGNED
To: Denton
NRC
References
NUDOCS 8609160353
Download: ML18022A402 (7)


Text

REQULA Y INFORMATION DISTR IBUTI SYSTEN (R IDS)

ACCESSION NBR: 8609160353 DOC. DATE: 86/09/16 NOTARIZED: NQ DOCKET FACIL: 50-400 Shearon Harris Nuclear Power Planti Unit i> Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION DENDLE> N. Affiliation Not Assigned Affiliation Not Assigned BEATTY> L. V. Aff i 1iation Not Assigned REC IP. NANE RECIPIENT AFFILIATION DENTQN NRC No Detailed *ff i iation 1 Qiven

SUBJECT:

Urges denial of util request for exemption from requirementI under iOCFR50i App E> to conduct full participation exercise of emergency response plan within. i gr before beginning operation of p 1 ant.

DISTRIBUTION CODE: YEOED COPIES RECEIVED: LTR I ENCL 8 SIZE:

TITLE: Request for NRR Action (e. g. 2. 206 Petitions) 8< Related Correspondenc NOTES: Application for permit renewal +i led. 05000400 RECIPIENT COP IES RECIPIENT COPIES 1D CODE/NAl'1E LTTR ENCL ID CODE/MANE LTTR ENCL PNR-A PD2 LA PWR-A PD2 PD BUCKLEY, B Oi INTERNAL: EDQ/ACB ELD/HDSi ELD/ E NRR DIR 04 EXTERNAL: LPDR 03 NRC PDR 02 NSIC 05 TOTAL NU"1BER OF COPIES REQUIRED: LTTR ii ENCL

I V

)

R 'tl I'>>

4) il i >> >>

t t

't>>

t I

'>>I

.*) )'7 V. "."- i >>'. >>)

P I ( V I' fftt 9>>')PX

~ >> ) )) >> t! I.V" ti, t,

>> I>> tlat ft i)')

>>, )V f "t '<

<>>.t 0:f I)))

i i" >>V I VV

>>>>'i "I

I I

.">>X f.(>> lt >> -QQRI>>q" P+~, '>> '>>>>>> ti 4 <'V,,

f) f,>>J l =

I

'0'- <" 'Y'3 it)') 9" >> rV J

VP i t,'I l P.

(I, h>>t t

~,VIV '>>i fl

>> a>>>>

I t,Q

')i V i>>

Dear Mi. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that, the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or-before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, 8609160353 860916!

PDR ADOCK 05000400 H ~ PDR l

Dear Mr. Denton:

wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the C3mpany conduct~a 'full participation exercise~"of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

4' 4l,a as~

Rl ,r e

Oe ~ J 4

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,