ML18004B593
| ML18004B593 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 11/12/1986 |
| From: | Riley W AFFILIATION NOT ASSIGNED |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8611180351 | |
| Download: ML18004B593 (6) | |
Text
ACCESSION NBR FAC IL: 50-400 AUTH. NAIVE RILEY').
RECIP. NANE DENTONi H.
RE('ULA' INFORNATION DISTRIBUTI YSTEN (RIDS>
8611180351 DOC. DATE: 86/11/12 NOTARIZED:
NQ DOCKET Shearon Harris Nucleav Power Planti Unit i. Carolina 05000400 AUTHOR AFFILIATION Affiliation Not Assigned RECIPIENT AFFILIATION Office of Nuclear Reactov Regulation.
Div ec tov (post 851125
SUBJECT:
Package of two comments urging denial of util v'equest fov exemption from v equiv ement pev 10CFR50> App E v e conduct of full pav'tie ipation exev c ise of emergency v esponse p lan.
DISTRIBUTION CODE:
YE03D COPIES RECEIVED: LTR ENCL SIZE:
TITLE: ',Request for NRR Action (e. g.
- 2. 206 Petitions)
Zc Related Correspondenc ri NOTES: Application for permit v enewal filed.
05000400 II RECIPIENT ID CODE/NANE PNR-A PD2 L*
BUCKLEY B 01 INTERNAL. EDO/ACB COPIES LTTR ENCL RECIPIENT ID CODE/NANE PWR-A PD2 PD ELD/HDS1 NRR DIR COPIES LTTR ENCL RE('ILE
'XTERNAL LPDR NSXC 04 03 05 NRC PDR 02 TOTAL NUj'ABER OF COPIES REQUIRED:
LTTR ~
ENCL ii
1 v'p k
g i
'I II
'h
~
If ""
~
f I '
Dear Mr. Denton:
I wish to urge denial of CPSL's request for exemption~Cgom the requirement, under 10 CFR 50<
Appendix 5,( that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,,
mhgat 1880 s 12 h0'J
/986 Hr. Harold Denton, Director Office of Nucle'ar Reaction Regulation Nuclear Regulakg~y Commission Washington, DC ~20555
~
5 3)ear Mr. Denton:
8611180351 861112 PDR ADQCK 05000400 H
PDR wisn to urge denial of Cp&L's re$ 9st for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power..
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
WC.
I9SS GIMME TO UNI t =t"-
cERE8aAL ~~i&"
HELP DlSABLED SIP)
Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555