ML18004A551

From kanterella
Jump to navigation Jump to search
Package of Two Comments Urging Denial of Util Request for Exemption from Requirements of 10CFR50,App E to Conduct Full Participation Exercise of Emergency Response Plan within 1 Yr of Commercial Operation
ML18004A551
Person / Time
Site: Harris 
Issue date: 09/27/1986
From: Edwardslotstei, Jacobs W
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8610060158
Download: ML18004A551 (6)


Text

REGULA~ RY INFGRNATION DISTRIBUTI "

SYBTEN (RIDB>

ACCPSBIQN NBR: 8610060158 DOC. DATE: 86/09/27 NOTARIZED:

NO DOCKET FACIL: 50-400 Bheav on Hav ris Nucleav Poiiier Planti Unit ii Carolina 05000400

, AUTH. NAhlE AUTHOR AFFILIATION EDNARDB-LGTSTEI Affi 1 ia tion iNot Assigned JACOBS> N.

Affiliation Not Assigned RECIP. NANE RECIPIENT AFFILIATION DENTQN, H. R.

Offi. ce of hluc lear Reactor Reg ul at ione Div ec tov (p ost 851125

SUBJECT:

package of trio comments urging denial of util request fol exemption fv om v equirements of 10CFR50i App E to conduct full pav'ticipation exev cise of emev gencg respnse plan zi thin 1

gr of commev cial opev ation.

DISTRIBUTION CODE:

YE03D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: Request fov'RR Action (e. g.

2. 206 Petitions) 8r Related Correspondenc NOTES: Application fov pevmit v enetual filed.

05000400 RECIPIEhlT ID CODE/MANE PNR-A PD2 LA BUCNLEY> B 01 COPIEB LTTR ENCL REC IP IENT ID CODE/NANE PNR-A PD2 PD COP IES LTTR ENCL INTERNAL: EDG/ACB EI Il EXTERNAL:

I PDR NSIC 04 03 05 ELD/HDBi NRR DIR NRC PDR 02 TOTAL hIUi~IBER GF COPIES REQUIRED:

LTTR ENCL 11

E C

I '

I'I

'II

I<

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emdrgency Respon'se Plan for'ts Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, g4ands-Donna Edwards.Lotstetn I

1 g)~

128 Lesllo Drive Chapel Hill, NC Z7514 Qo 8610060158 860927 PDR ADQCK 05000400 PDR i

vgf

r l

Dear Hr. Denton:

q/gsJ~u 1

I wish to urge denial of CPS,L's requgpp for exemption from the requirement, unde> 40 CFR 50, Appendix E, that the Company conduct. a full participation exercise of the Emergency

Response

Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of tQe need, for changes in the evacua-tion plan, +Relieve this exercise should be conducted before the plant is permitted to operate at all. 7he pa~'m>9q

~4 fg~ ~p4tlcrA~ ct~~g nt4~p /hi~ O'P Sincerely,

+<4~ z<<~~<~/g p5

O.

A

-r

'0