Informs NRC of Mod to Commitment for Hnp,Re Comprehensive Review of Implementation of TS Sr.Upon Completion of Listed Reviews,Surveillance Procedure Review Project Will Be Considered Complete
ML18016A860
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/15/1999
From: Scarola J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-99-017, HNP-99-17, NUDOCS 9903240092
Download: ML18016A860 (7)


Text

CATEGORY 1 REGULAT Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:9903240092 DOC.DATE: 99/03/15 NOTARIZED: NO DOCKET FACIL:50-400'hearon Harris Nuclear Power Plant, Unit 1, Carol'ina 05000400 AUTH.NA'ME . AUTHOR AFFILIATION SCAROLA,J. Carolina Power S Light Co.

RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Informs NRC of mod to commitment for HNP,re comprhensive review of implementation of TS SR.Upon completion of listed reviews, surveillance procedure review project will be consider ed comp le te .

DISTRIBUTION CODE: A001D TITLE: OR COPIES RECEIVED: LTR Submittal: General Distribution I ENCL 0 SIZE:

E NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES 0 ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 PD2-1 PD FLANDERS,S INTERNAL: ACRS NRR/DE/ECGB/A NRR/DE/EMCB NRR/DRCH/HICB NRR/DSSA/SPLB NRR/DSSA/SRXB NRR/SPSB JUNG,I NUDOCS-ABSTRACT OGC/HDS2 EXTERNAL: NOAC NRC PDR WASTETH NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COP1ES REQUIRED: LTTR 15 ENCL 35

L Carolina Power 8 Ught Company James Scarola PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant NR l5 l9S9 SERIAL: HNP-99-017 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 SURVEILLANCEPROCEDURE REVIEW PROJECT

Dear Sir or Madam:

The purpose of this letter is to inform you of a modification to a commitment for the Harris Nuclear Plant (HNP). We have discussed in numerous letters and meetings our commitment to perform a comprehensive review of the implementation of our Technical Specification surveillance requirements (reference LER 95-007, LER 96-002-13, LER 97-012, and HNP letters dated February 11, 1997 and June.19, 1998). This review has also been mentioned in several other letters, although not specifically as a corrective action (LER 97-021-02, LER 97-023, LER 97-024, LER 98-005, and LER 98-006).

In an effort to focus our resources in the most important areas, we have decided to modify the scope of our commitment. The previous scope was to review surveillance requirements which will be retained in Technical Specifications (TS) when we convert to the Improved Technical Specifications (ITS). Approximately 40% of the project has been completed to date, and the overall project was recently re-evaluated. Since a large portion of the reviews have been completed, and the number of findings resulting in TS violations or LERs have been minimal, a decision was made to focus resources on the most important areas in the TS and not perform a detailed review of all the remaining surveillance requirements. As a result, it was decided that the scope of the remaining reviews will include:

(1) TS similar to those in which the previous significant problems have been found, and (2) TS addressing the top systems contributing most to core damage (from the HNP Probabitistic Safety Assessment).,;, ' '

r I y$ ,

Upon completion of these reviews, the Sur'veillanc'e Pro'cedure Review project will'be considered complete. This project, in conjunction with the work performed in response" to Generic Letter 96-01, "Testing of Safety-Related Logic Circuits," will provide a comprehensive review of the implementation of TS surveillance requirements at HNP.

9903240092 9903i5

'n n{'83 PDR ADQCK 05000400 P PDR 5413 Shearon Harris Road New Hill, NC Tel 919 362-2502 Fax 919 362-2095

l P

ll i la~i 4"j 0

) l i ~

F

' 'la .

s ~)

1 IP;KLf P

r ~ ~ n~ >e S

,K 2I &~."'I

~r ~

Document Control Desk HNP-99-OXX/ Page 2 In summary~ previous commitments to perform this project should be replaced with the scope described in this letter. Current plans are to complete the Surveillance Procedure Review project in 1999.

Questions regarding this matter may be referred to Ms. D. B. Alexander at (919) 362-2315.

Sincerely, ONW/onw c: Mr. J. B. Brady (NRC Senior Resident Inspector)

Mr. Rich Laufer (NRR Project Manager, HNP)

Mr. L. A. Reyes (NRC Regional Administrator, Region II)

~ h

'I

>la'

~ t

Document Control Desk HNP-99-OXX/ Page 3 bc: Ms. D. B. Alexander Mr. W. J. Hindman Mr. G. E. Attarian Mr. C. S. Hinnant Mr. R. H. Bazemore Mr. W. D. Johnson Mr. H. K. Chernoff (RNP) Mr. G. J. Kline Mr. B. H. Clark Ms. W. C. Langston (PE8.RAS File)

Mr. W. F. Conway Mr. R. D. Martin Mr. G. W. Davis Mr. T. C. Morton Mr. W. J. Dorman (BNP) Mr. J. M. Taylor Mr. R. J. Field Nuclear Records Mr. K. N. Harris File: HI/A-2D Ms. L. N. Hartz File: H-X-0511