ML18004B583
| ML18004B583 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 11/12/1986 |
| From: | AFFILIATION NOT ASSIGNED |
| To: | Denton NRC |
| References | |
| NUDOCS 8611120116 | |
| Download: ML18004B583 (4) | |
Text
ACCES IQN NBR:
FAC IL: 50-400 AUTH. NN"1E REC IP. NAl'lE DENTON REGULAT Y INFORM'lATION DISTR lBUTIO YSTEl'i (R IDS) 8611120116 DOC. DATE: 86/11/12 NOTARIZED:
NO Sheav on Hav v is Nucleav Power Plant.
Unit li Cav olina AUTHOR AFFILIATION Affiliation Not Assigned RECIPIENT AFFILIATION NRC No Detai led Affiliation Given DOCKET 05000400
SUBJECT:
Uv'ges denial of util v equest for exemption from requirements of 10CFR50> App E re conduct af emergency response plan.
Exercise should be conducted before plant pevmitted to op ev'ate.
DIBTRIDOTION CODE:
YE03D COPIEB RECEIVED: LTR Jg ENCL Q BIIE:
/
TITLE: Request fov NRR Action (e. g.
- 2. 206 Petitions) h Related Correspondenc NOTES: *pplication fov pev mit v enewa1 fi 1 ed.
05000400 REC IP IENT ID CODE/NANE PNR-* PD2 LA BUCKLEY'S B 01 CQPlES LTTR ENCL RECIPIENT ID CODE/MANE PWR-A PD2 PD COP IES LTTR ENCL INTERNAL: EDO/ACB E
REG FI E EXTERNAL: LPDR NSIC 04 03 05 ELD/HDSi NRR DIR NRC PDR 02 0
TOTAL NUl')BER OF COPIES REQUIRED:
LTTR M ENCL 11
it, d
I'q
= iil' II
8011120116 SS1112 PDR ADOCK 05000400
~l1/
Deai'r. Denton:
I wish to urge denial of CP&L's request for exemption from the requirement, under 10 CFR 50;-
Appendix E, that the Company conduct a full pa'rt'icipation exercise of the Emergency
Response
Plan.for its Shearon Harris nuclear power plant wi'thin one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
jA'iriqlair~@%'
>p' A
<<< ~w>~~ z. i Mr. Harold Denton, Director Office of Nuclear Reaction Re'gulatiop Nuclear Regulatory Commissio Washington<