Urges Denial of Util Request for Exemption from Requirement for Conduct of Full Participation Exercise of Emergency Response Plan within 1 Yr Before Beginning Commercial Plant Operation,Per 10CFR50,App E
ML18004B543
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/27/1986
From: Brock S, Conrad P
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8610270448
Download: ML18004B543 (6)


Text

REQUL RY INFORNATION DISTRIHUTI BYBTEN (R IDS)

ACCESSION NHR: 8610270448 DOC. DATE: 86/i0/27 NOTARlZED: NO DOCKET I FACIL: 50-400 Shearon Harris Nuclear Power Planti Unit ii Carolina 05000400 AUTH. NAME AUTHOR AFFILlATION HROCK> S. Affiliation Not Assigned CONRADE P. APFiliation Not Assigned RECIP. NANE RECIPIENT AFFILIATION DENTON> H. R. Office oF Nuclear Reactor Regulationi Director (post 85ii25 BUHJECT: Urges denial of util request For exemption from requirement for conduct of Pull participation exercise of emergency response plan within one gear before beginning commercial p lant op erat i on> per iOCFR50i *p p E.

DISTRIBUTION CODE: YE03D TITLE: Request for COPIES RECEIVED: LTR NRR Action (e. g. 2. 206

~ ENCL Petitions) Fc

/Related SI,ZE:

Correspondenc NOTES: Application Por permit renewal Oiled. 05000400 RECIPIENT COP IEB RECIPIENT COPIEB ID CODE/NAI'tE LTTR ENCL ID CODE/NANE LTTR ENCL PMR-A PD2 LA PMR-A PD2 PD HUCKLEY. H Oi INTERNAL: EDO/ACH ELD/HDSi NRR DIR REQ FIL 04 EXTERNAL: LPDR 03 NRC PDR 02 NBIC 05 TOTAL NU>1HER OF COPIES REQUIRED: LTTR i ENCL ii

0 III 4$ >>4h f, /

jVj v j jh>>+ f gjgh J

>>l- 4.

~.

~ lI 4 t I II h

>>III lj II Ih' >>

Jkjf 4 v Ig) p !hh j Ij I 4~

~ Il,f, lr 4 h  ! I I JL 4

Shi0270448 861027

Dear Mr. Denton:

PDR ADOCK 05000400 H

PDR I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant, is permitted to operate at all.

Sincerely>

po>

o/(

S)nels'r -

yr pO ~ )~)

SA g

J Mr. Harold Dentony- Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

~ ~

0,

Dear Mr. Denton:

I wish to urge denial of CPS,I.'s request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company co>>dQct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

g6 g~ cpg~

Wd/4 8 . 2= Cro. h

/aor Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555