REQUL RY INFORNATION DISTRIHUTI BYBTEN (R IDS)
ACCESSION NHR: 8610270448 DOC. DATE: 86/i0/27 NOTARlZED:
NO DOCKET I FACIL:50-400 Shearon Harris Nuclear Power Planti Unit ii Carolina 05000400 AUTH. NAME AUTHOR AFFILlATION HROCK> S.
AffiliationNot Assigned CONRADE P.
APFiliation Not Assigned RECIP. NANE RECIPIENT AFFILIATION DENTON> H. R.
Office oF Nuclear Reactor Regulationi Director (post 85ii25 BUHJECT:
Urges denial of util request For exemption from requirement for conduct of Pull participation exercise of emergency response plan within one gear before beginning commercial p lant op erat ion> per iOCFR50i *pp E.
DISTRIBUTION CODE:
YE03D COPIES RECEIVED: LTR ~ ENCL /
SI,ZE:
TITLE: Request for NRR Action (e. g.
- 2. 206 Petitions)
Fc Related Correspondenc NOTES: Application Por permit renewal Oiled.
05000400 RECIPIENT ID CODE/NAI'tE PMR-A PD2 LA HUCKLEY.H Oi INTERNAL: EDO/ACH COP IEB LTTR ENCL RECIPIENT ID CODE/NANE PMR-A PD2 PD ELD/HDSi NRR DIR COPIEB LTTR ENCL REQ FIL EXTERNAL: LPDR NBIC 04 03 05 NRC PDR 02 TOTAL NU>1HER OF COPIES REQUIRED:
LTTR i
ENCL ii
0 III 4$
>>4h f,
/
jVj v j
jh>>+ f gjgh J 4.
~ l
>>l-
~.
I 4
II t
I h
>>III lj II Ih' Jkjf 4
v Ig) p
!hh j
Ij h
I I
JL I
~ Il,f, 4 ~
lr 4
4
Dear Mr. Denton:
Shi0270448 861027 PDR ADOCK 05000400 H
PDR I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant, is permitted to operate at all.
Sincerely>
po>
o/(
pO ~
S)nels'r
- yr
)~)
SA g
J Mr. Harold Dentony-Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Denton:
~
~0, I wish to urge denial of CPS,I.'s request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company co>>dQct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
g6 g~
cpg~
Wd/4 8 2= Cro.
/aor h
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555