Text
REQUL Y INFORNATION DISTRIBUTI
.SYSTEN (RIDS)
ACCESSION NBR: 8610100043 DOC. DATE: 86/10/01 NOTARIZED:
NO DOCKET FACIL:50-400 Shearon Harr is Nuclear Power Planti Unit i~ Carolina 05000400 AUTH. NANE AUTHOR AFFILIATION QREENEi N.
AffiliationNot Assigned RECIP. NAIVE RECIPIENT AFFILIATION DENTONp H.
Office of Nuclear Reactor Regulationi Director (post 851125
SUBJECT:
Urges NRC denial of util request For exemption from requirements of full-scale drill of evacuation plan.
Full-scale drill needed to resolve deficiencies in 1985 exercise 5 to address util h counties rev to plan.
DISTRIBUTION CODE YE03D COPIES RECEIVED: LTR ENCL SI ZE:
TITLE: Request for NRR Action (e. g.
- 2. 206 Petitions)
~ Related Correspondenc NOTES: Application for permit renewal filed.
05000400 RECIPIENT ID CODE/MANE PWR-A PD2 LA BUCKLEY'S B 01 INTERNAL EDO/ACB COPIES LTTR ENCL RECIPIENT ID CODE/NAME PWR-A PD2 PD ELD/HDS1 NRR DIR COPIES LTTR ENCL REQ FIL EXTERNAL: LPDR NSIC 04 03 05 NRC PDR 02 TOTAL NU<BER OF COPIES REQUIRED:
LTTR 11 ENCL
(>>
"~
N
. >> I >>
~
tt
(>>
r tt(g
'((()
>>I';>>>>
Harold Denton Office of Nuclear Reactor Regulation Nuclear Regulatory Commission Washington, DC 20555 Qg > 4)c Hog p gf gc>>ym c9 J,P~I,
Dear Mr. Denton:
I am writing to insist that you do not grant CP8rL's request for an exemption from a full-scale drill of the evacuation plan for the Shearon Harris Nuclear Power Plant.
This full-scale drill is required by law and was part of an agreement made between CPkL and the Chatham County Board of Commissioners, under which the Board agreed to rejoin the evacuation plan.
A full scale drill is needed because there were problems with the drill conducted in May of 1985, and because there have been changes made to the plan since that time.
Both Lee and Chatham Counties have instituted some
- changes, and only a full-scale drill will reveal whether those changes will resolve the many problems raised after the 1985 drill, and since that time.
A "scaled down" drill involving only a test of notification procedures, and without the participation of all state level participants in the plan, is simply not adequate to test the plan's effectiveness, nor to ensure that local residents will be adequately protected in the event of an accident.
I do not believe that CPRL should be allowed to be exempt from the law, especially since they have led our public officials to believe that a full-scale drill will be conducted this summer or fall.
Yours sincerely, PDR o0003 861001 DOCg 05pppypp PDR
~
~ Q.,
C Cy
~ C
-j, /C</ ~ >3)M C"
t I
0 8< C'j /~'uckc.~ (Baca& 4c,Dc/~
iP.c.~~
Ln g Q C