ML18004B559

From kanterella
Jump to navigation Jump to search
Package of 11 Comments Urging Denial of Util Request for Exemption from Requirements for Full Participation Exercise of Emergency Response Plan within 1 Yr of Commercial Operation or Before Operation at More than 5% Power
ML18004B559
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/30/1986
From: Jackie Cook, Hunt H, Jetter J, Rachel Johnson, Mcadams D, Pressley C, Prine N, Ray P, Laura Smith
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8610300241
Download: ML18004B559 (24)


Text

f RE Y INFORNATION DISTR IB SYSTEl'l (R IDS)

ACCESSION NBR: 86i030024i DOC. DATE: 86/10/30 NOTARIZED: NO DOCKET FACIL: 50-400 Bhearon Harris Nuclear Poeer Plant> Unit i> Carolina 05000400 AUTH. NANE AUTHOR AFFILIATION NCADAl'lS> D. Affiliation Not Assigned PREBSLEY> C. S. Affiliation Not Assigned SNITH> L. R. AfFiliation Not Assigned RECIP. NANE REC I P I ENT AFFILIATION DENTON> H. R. Office of Nuclear Reactor Regulation. Director (post 85ii25

SUBJECT:

Package exemption of ii comments urging denial of util request fol from requirements for full participation exercise oF emergency response plan within i gr of commercial operation or before operation at more than 5/ power ~

DIBTRIDVTION CODE: TEOBD COPIEB RECEIVED: LTR 0 ENCL gRelated BI ZE: //

TITLE: Request for NRR Action (e. g. 2. 206 Petitions) 8r Correspondenc NOTES: Application For permit renewal filed. 05000400 RECIPIENT COP IEB I REC IP ENT COP lES ID CODE/NANE LTTR ENCL ID CODE/MANE LTTR ENCL PNR-A PD2 LA PWR-A PD2 PD

)3UCKLEY, 9 Oi INTERNAL: EDO/ACB ELD/HDBi NRR DIR 04 EXTERNAL: LPDR 03 NRC PDR 02 NBIC 05 TOTAL NUl"lBER OF COPIEB REQUIRED: LTTR ~ ENCL ii

~ 'f 0

t d

J

'I'l"3

  • o C L

I

(

'l~~ ~ ~ Bbi 0300241 86i 030 t ~Kwo A PDR ADOCK 05000400

Dear. Mr. Denton:

PDR I wish to urge denial of CPSL's request for exemption from-the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within on@ year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for chang'es in the evacua-tion plan, I believe this exercise should be conducted before the plant is pej;mgtted Co operate at all.

Sincerely,

441.+ ~~~~~a Dirrg1P~

g~

2T OCT ISIS

/

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Hr. Denton:

wish to urge denial of CPBL's request for exemption from the requirement, under 10 CFR 50, Appendix 'E, that the Company conduct. a full participation exercise of the Emergency Response Plan for its Shearon Harris 'nuclear power plant within one year before beginning commercial operation of the plant or before operating at grater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely+

.~

%E

'V Q7Q Q7 OCT

/986 r twgjiqsug )

i i r <,r ~

Hr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Nashington,'C 20555

r y

Dear Hr. Denton:

0 I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company .conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan,' believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

@H. /g PM zr ocr l98S Hr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before becj>nning commercial jsefore operating at operation of the plant- orf$

than five percent'f rated power.

'rater Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

>fr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555 I

r N+5 t

Dear Mr.=Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full

.participation exercise of the Emergency Response Flan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant iq permitted to operate at all.

Hr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CP&L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, C

Q.

fklLLQ sP rUQ& l~(D&~ 7M<cE5 FIG)yn Wg

SE.

x PM gP+m65' 1 zrct7r 0 1986 Mr. Harold Denton, Director Office of Nuclear -Reaction Regulhtiop Nuclear Regulatory Commission Washington, DC 20555 l<<l< 1l(<<<<'l<l<<l<l<< l<<<ll<)

t<

Dear Mr; Denton:

I wish to urge denial of CPSL's requesti for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan'for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all~o<lt Sincerely, S<a. W~S'6~/

galeiy4, ABC gWm

~ of Ci!QfiiA'~

~ 3801-C Western Blvd:

vaganti ~ vive c.l VUO f9'19) 82'1-2059 .

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555 lg

Dear Mr. Denton:

I wish to urge denial of CPEL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant wi~in one year before beginning commercial ope'ration of the plant or before operating at gre4ter than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nucl'ear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency for its Harris nuclear poorer plant Response,'lan Shearon wit.hin one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

yGH. y PM .. Gl'IIE

<<3 2T OOT IJ) CEREBR  :- ALQ I9SS HELP Dlog E O'E

~n I Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

wish to urge denial of CPS,L's request for exemption from the requirement, undeIrQ10 CFR 50, Appendix E, that the Company conduct' full participation exercise of the Emergency Response plan. for its Shearon Harris nuclear power plant withe.n one year before beginning commercial operation of the plant or before operating at greaVer than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Plr. Dentoh:

I wish to urge*denial of CPGL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is p rmitted to operate at all.

Sincerely,

Hr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555