ML18004B559
| ML18004B559 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 10/30/1986 |
| From: | Jackie Cook, Hunt H, Jetter J, Rachel Johnson, Mcadams D, Pressley C, Prine N, Ray P, Laura Smith AFFILIATION NOT ASSIGNED |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8610300241 | |
| Download: ML18004B559 (24) | |
Text
f RE Y INFORNATION DISTR IB SYSTEl'l (R IDS)
ACCESSION NBR: 86i030024i DOC. DATE: 86/10/30 NOTARIZED:
NO DOCKET FACIL:50-400 Bhearon Harris Nuclear Poeer Plant>
Unit i> Carolina 05000400 AUTH. NANE AUTHOR AFFILIATION NCADAl'lS> D.
AffiliationNot Assigned PREBSLEY> C. S.
Affiliation Not Assigned SNITH> L. R.
AfFiliation Not Assigned RECIP. NANE REC IP IENT AFFILIATION DENTON> H. R.
Office of Nuclear Reactor Regulation.
Director (post 85ii25
SUBJECT:
Package of ii comments urging denial of util request fol exemption from requirements for full participation exercise oF emergency response plan within i gr of commercial operation or before operation at more than 5/ power
~
DIBTRIDVTION CODE:
TEOBD COPIEB RECEIVED: LTR 0 ENCL g BI ZE: / /
TITLE: Request for NRR Action (e. g.
- 2. 206 Petitions) 8r Related Correspondenc NOTES: Application For permit renewal filed.
05000400 RECIPIENT ID CODE/NANE PNR-A PD2 LA
)3UCKLEY, 9 Oi INTERNAL: EDO/ACB 04 COP IEB LTTR ENCL REC IPIENT ID CODE/MANE PWR-A PD2 PD ELD/HDBi NRR DIR COP lES LTTR ENCL EXTERNAL:
LPDR NBIC 03 05 NRC PDR 02 TOTAL NUl"lBER OF COPIEB REQUIRED:
LTTR ~
ENCL ii
~
'f 0
t d
J
'I'l"3 o
C L
I
(
'l~~
~ ~
t
~Kwo A Dear. Mr.
Bbi0300241 86i030 PDR ADOCK 05000400 Denton:
PDR I wish to urge denial of CPSL's request for exemption from-the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within on@ year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for chang'es in the evacua-tion plan, I believe this exercise should be conducted before the plant is pej;mgtted Co operate at all.
Sincerely,
2T OCT ISIS 441.+ ~~~~~ag~
Dirrg1P~
/
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
Dear Hr. Denton:
wish to urge denial of CPBL's request for exemption from the requirement, under 10 CFR 50, Appendix 'E, that the Company conduct.
a full participation exercise of the Emergency
Response
Plan for its Shearon Harris 'nuclear power plant within one year before beginning commercial operation of the plant or before operating at grater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely+
. ~
'V Q7Q Q7 OCT
/986
%E
.twgjiqsug )
r i i r <,r
~
Hr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Nashington,'C 20555
y r
Dear Hr. Denton:
0 I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company.conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan,'
believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
@H. /g PM zr ocr l98S Hr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Denton:
I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before becj>nning commercial operation of the plant-orf$efore operating at js
'rater than five percent'f rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
>fr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555 I
r N+5 t
Dear Mr.=Denton:
I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full
.participation exercise of the Emergency
Response
Flan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant iq permitted to operate at all.
Hr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Denton:
I wish to urge denial of CP&L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely, C Q.
fklLLQ sP rUQ& l~(D&~ 7M<cE5 FIG)yn Wg
SE.
x PM gP+m65' 1
zrct7r 0
1986 Mr. Harold Denton, Director Office of Nuclear -Reaction Regulhtiop Nuclear Regulatory Commission Washington, DC 20555 l<<l<1l(<<<<'l<l<<l<l<<t< l<<<ll<)
Dear Mr; Denton:
I wish to urge denial of CPSL's requesti for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan'for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all~o<lt Sincerely, S<a. W~S'6~/
galeiy4, ABCgWm
~
of Ci!QfiiA'~
~3801-C Western Blvd:
vaganti
~ vive c.l VUO f9'19) 82'1-2059 Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555 lg
Dear Mr. Denton:
I wish to urge denial of CPEL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant wi~in one year before beginning commercial ope'ration of the plant or before operating at gre4ter than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nucl'ear Regulatory Commission Washington, DC 20555
Dear Mr. Denton:
I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response,'lan for its Shearon Harris nuclear poorer plant wit.hin one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
yGH. y PM
<<3 IJ) 2T OOT I9SS Gl'IIE CEREBR
- - ALQ HELP Dlog E
O'E
~n I Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Denton:
wish to urge denial of CPS,L's request for exemption from the requirement, undeIrQ10 CFR 50, Appendix E, that the Company conduct' full participation exercise of the Emergency
Response
plan. for its Shearon Harris nuclear power plant withe.n one year before beginning commercial operation of the plant or before operating at greaVer than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
Dear Plr. Dentoh:
I wish to urge*denial of CPGL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is p rmitted to operate at all.
Sincerely,
Hr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555