Urges Denial of Util Request for Exemption from Requirements of 10CFR50,App E to Conduct Full Participation Exercise of Emergency Response Plan within 1 Yr of Commercial Operation
ML18004B562
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/25/1986
From: Pendergrast C
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8610310297
Download: ML18004B562 (4)


Text

W!.A REQU RY INFORMATION DISTRIBUT BYSTEt't (RIDB)

ACCESSION NBR: 8610310297 DOC. DATE: 86/10/25 NOTARIZED:

NO DOCKET FACIL:50-400 Sheav on Harv is Nuclear Power Planti Unit 1. Carolina 05000400 AUTH. NANE AUTHOR AFFILIATION PENDER('RAST. C.

AFfiliation Not Assigned RECIP. NANE RECIPIENT AFFILIATION DENTONp H. R.

OFFi ce of Nuclear Reactor Regulation>

Div ec tor (p ost 851125

SUBJECT:

Urges denial of util v equest d'or exemption fv om v eguirements of 10CFR50. App E to conduct full pav tie ipation exev cise of emergency response plan within 1 gr oF commercial op erat ion.

DISTRIBUTION CODE:

YEOSD COPIES RECEIVED: LTR C ENCL SI ZE:

TITLE: Request for NRR Action (e. g.

2. 206 Petitions) i~c Related Correspondenc NOTES: Application for permit reneual filed.

05000400 RECIPIENT ID CODE/NANE PWR-A PD2 LA DUCKLEY,8 01 INTERNAL. EDO/ACD E

04 COPIEB LTTR ENCL REC lP IENT ID CODE/NANE PNR-A PD2 PD ELD/HDS1 NRR DIR COP IES LTTR ENCL EXTERNAL: LPDR NBIC 03 05 NRC PDR 02 TOTAL NUNBER OP COPIEB REQUIRED:

LTTR Q

ENCL

t t)

'I I'I

l3gi0310FP7 Bb1025 pgg ADOCK 05000400 PDR

Dear,

Mr. Dent,.on:

wig~Q to urge denial of CPSL's reqd'est for exemption from the requirement, under 10 CFR 50, Apperrdix E, that the Company condyle a full participation exercise of the Emergency

Response

Plan for its Shearon Harris nuclear power plant

-within one year before beginning commercial

.operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plaint is permitted to operate at all.

'@Hi +Q 1

PM)+~

25 OCT

@a~

Mr. Harold Denton, Director Office of Nuclear Reaction Regulation~

Nuclear Regulatory Commission Washington, DC 20555