REGULA Y INFORNATION DISTR IBUTI SYSTEN

( R IDS)

ACCESSION NBR: 8610100113 DQC. DATE: 86/OV/30 NOTARIZED:

NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Planti Unit ii Carolina 05000400 AUTH. MANE AUTHOR AFFILIATION LEITESS~ J.

AffiliationNot Assigned RECIP. NANE RECIPIENT AFFILIATION DENTON> H.

Office o8 Nuclear Reactor Regulation>

Director <post 851125

SUBJECT:

Urges denial o0 util request

+or exemption from requirement under 10CFR50i App E that Pull participation exercise oe emergency response plan be conducted for plant toithin 1 gr prior to commer c ial op erat ion.

DISTR IBUTION CODE YE03D COP IES RECEI VED: LTR ENCL SI ZE:

TITLE: Request for NRR Action (e. g.

2. 206 Petitions) h Related Correspondenc NOTES: App.lication %or permit reneu!al filed.

05000<00 RECIPIENT ID CODE/NANE PNR-A PD2 LA BUCKLEY,B 01 COPIES LTTR ENCL RECIP RENT ID CODE/NANE PMR-A PD2 PD COP IES LTTR ENCL 1

INTERNAL: EDO/ACB ELD/RED E

EXTERNAL: LPDR NSIC 04 03 05 ELD/HDS1 NRR DIR NRC PDR 02 TOTAL NUMBER OF COPIES REQUIRED: LTTR,~

ENCL 11

1 4

II Ci P

It 4

tt I,/

I

~

IP4 It P~t 4

ll

p2 I

e e

~

'ear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CPR 50, Appendix F., that the Company coqHuct a full participation exercise of the Emergency

Response

Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, gu5 0/g 8610100113 860930 PDR ADOCK 05000400 H

PDR