ML18004A584

From kanterella
Jump to navigation Jump to search
Package of Three Citizen Comments Urging Denial of Util Request for Exemption from 10CFR50 App E Requirement for Conduct of Full Participation Exercise of Emergency Response Plan for Plant within 1 Yr Before Operation Above 5% Power
ML18004A584
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/16/1986
From: Doris Lewis, Scherger M, Ken Wilson
AFFILIATION NOT ASSIGNED
To: Denton
NRC
References
NUDOCS 8610160005
Download: ML18004A584 (8)


Text

I REGULA RY lNFORNATION DISTR IBUTI,BYBTEN (R IDB)

ACCESSION NOR: 8610160005 DOC. DATE: 86/10/16 NOTARIZED: NO DOCKET FAC IL: 50-400 Bheav on Hav v is Nucleav Powev Plant> Unit 1> Cav olina 05000400 AUTH. NANE AUTHOR AFFILIATION WILSON> K. Affiliation Not Assigned LEW IS> D.'P Affiliation Not Assigned SCHERQER N. D; Affiliation Not Assigned RECIP. NANE RECIPIENT AFFILIATION DENTON NRC No Detailed Affiliation Given

SUBJECT:

Package of thv ee citizen comments uv ging denial of util v eguest fov exemption fv om 10CFR50 App E requirement for conduct of full pav'ticipation exercise of emergency v esponse plan fov plant within 1 gr before operqOion above 5/ power.

DISTRIBUTION CODE: YEOSD COP IES RECEIVED: LTR ENCL BI ZE:

TITLE: Request fov NRR Action (e. g. 2. 206 Petitions) 8c Related Corv espondenc NOTES: Application fov pevmit v enewal filed. 05000400 REC IP IENT COP IEB RECIPIENT COP IEB ID CODE/MANE LTTR ENCL ID CODE/NANE LTTR ENCL PWR-A PD2 LA PWR-A PD2 PD f gUCKLEY 9 01 ,l INTERNAL: EDO/ACB ELD/HDB1 l ELD/RFD NRR DIR Q IL 04 jl EXTERNAL: LPDR 03 I NRC PDR 02 ) i 1

NBIC 05 l

TOT*L NU>IBER CF CCPIEB REQUIRED: LTTR I t ENCL

't qJ t

li 1

. +~>~=-skag -A Qa~r ~ @la. < t 8610160005 Sb1016

Dear Mr. Denton:

PDR ADOCK 05000400 H PDR I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

09

) $ o(i

),GH, y tL".xr.

'lg ~

- PA;PP~iF 6i .

7 OCT ipse CDPt'ACF YOUR CO! T~Scaaop

)CE Ll Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555 l>>l)lit>>>>l)l>>l)l)) l)1>>) ll)l

Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

'c PM g = r t5) 7 lCY

Dear Mr. Denton:

Iea6 I wish to urge denial of CPBL's request for exemption from the requirement, under 10 CFR 50,

. Appendix E, that the Company -conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, E believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, I

)y5

Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, undeY 10 CFR 50, Appendix E, that the Company c~o duct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, D.