A'CCESSION NBR FAC IL:50-400 AUTH. NAffE BAZZARRE> T. A BEATTY,B.
REC IP. NAf'fE DENTON> H. R.
REQUL3RY INFORNATION DIBTRIBUTl
'BYBTEN (RIDE) 8610310271 DOC. DATE: 86/10/23 NOTARIZED:
NO DOCKET Shearon Harris Nuclear Power Plant>
Unit 1> Carolina 05000400 AUTHOR AFFILIATION AffiliationNot Assigned AffiliationNot Assigned RECIPIENT AFFILIATION Office of Nuc)ear Reactor Regulation.
Director (post 851125
SUBJECT:
Package of three postcards urging denial of util request for exemption from requirement o+
10CFR50> App E to conduct full participation exercise of emergency response plan within 1
gr of commercial operation.
DISTRIBUTION CODE:
YE03D COPIES RECEIVED: LTR ENCL SIZE:
TITLE: Request for NRR Action (e. g.
- 2. 206 Petitions) h Related Correspondenc NOTES: Application.for permit renewal filed.
05000400 RECIPIENT ID CODE/NANE PLJR-A PD2 LA BUCKLEY> B Oi INTERNAL: EDO/ACB COPIES LTTR ENCL REC IPIENT ID CODE/NAf'fE PWR-A PD2 PD ELD/HDSi NRR DIR COPIES LTTR ENCL C FILE EXTERNAL: LPDR NSIC 04 03 05 NRC PDR 02 TOTAL NUNBER OF COPIES REQUIRED:
LTTR 11 ENCL
~ I I g h
I[" E))
l I ),
)
~
~
IJ A
I "II )tI)
I
)I
)" r' q )-
Aik>
W 'l'J[
E
[I I
> ( gj g ~
>Vh>
I
>)
~
'I v
Ah f)
8610310271 Sbi023 PDR ADQCK 05000400
Dear Hr. Denton:
H PDR
~%
I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
plan for its Shearon Harris nuclear, power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.
Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Denton:
I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct
"-a full participation exercise of the Emergency
Response
plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than,five percent of rated power.
Because of the-need for changes in the evacua-tion plan, I >eleve this exercise should be conducted before the plant is permitted to operate at all-=
Sincerely,
Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC, 20555
Dear Hr. Denton:
I wish to urge de'nial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency
Response
Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater.
than five percent of rated power.
Becau e of the need for changes in the evacua-tion pan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely,
E()
2') v f.
lgpI>
FsciPA~k~i~ >~
E(PIP).(
Pl CO
)'P( T)'OJRPO~T('/i Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555 ji(jiiI)'((((jinni(Ii)(()'(i'((())'()