ML18004B575
| ML18004B575 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 11/01/1986 |
| From: | AFFILIATION NOT ASSIGNED |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8611060013 | |
| Download: ML18004B575 (4) | |
Text
REGULATORY INFORM)ATION DISTR IBUTIO SYSTEM'I (R IDS)
I
,ACCESSION NBR: 8/iI106001s DOC. DATE: S6/11/01 NO ARIZED:
NO DOCKET FAG IL: 50-400 Sheav'on Hav ris Nucleav Pouter Plant>
Unit ii Cav olina 05000400 AUTH. NANE AUTHOR AFFILIATION Aftiliation Not Assigned REC IP. NANE RECIPIENT AFFILIATION DENTON> H. R.
Office of Nucleav Reactor Regulationi Div ec tov (post 85ii25 SUB JECT:
Urges denial of util, request fov exemption fv'om iOCFR501 App E v equiv ement to conduct full participation exev cise of emergency v esponse plan i gr prior to commev'cial opev ation.
Exev cise should be conducted prior to any plant opev'ation.
DISTRIBUTION CODE:
YEOSD COPIES RECEIVED: LTR ENCL
" SI ZE:
TITLE: Request For NRR Action (e. g.
- 2. 206 Petiti ons)
Zc Related Correspondenc NOTES:Application fov permit v enewal +iled.
05000400 INTERNAL:
RECIPIENT ID CODE/MANE PWR-A PD2 LA BUCNLEY, 8 0i ELD ED 04 COPIES LTTR ENCL RECIPIENT ID CODE/MANE PWR-A PD2 PD ELD/HDSi NRR DIR COPIES LTTR ENCL EXTERNAL:
LPDR NSIC 03 05 NRC PDR 02 TOTAL NUi'IOER OF COFIEB REQUIRED:
LTTR 111. ENCL 11
,I 4
l~'
I g4 gy fl
'I Mr. Harold Denton, Director Office of Nuclear Reaction Regulatiop.
Nuclear Regulatory Commission Washington, DC 20555 8&11060013 8 OOP400 PDR ADGCK 05 PDR H
pe A~ y vv M.
C7)
HOV
Dear Mr. Dent,
cn'
~986 GlYE TO
.CEREggAL PAL>>
HELP)0fSABLED PEOPLE I wish to urge denial of CPS,L's request for exemption.from the requirement, ader 10 CFR 50, Appendix E, that the Company co/guet a full participation exercise of the EiVerg'ency Response plan for its Shearon Harris nucleai-'.power plant within one year before beginning commercial operation of the plant:or before operating at
'reater than five percent of rated power.
Because of the need for.. changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.
Sincerely, g5'