Forwards Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept, IAW 10CFR55.45(b)(5)(ii). NRC Form 474 & Required Info Re Simulator Performance Test Results & Schedules Also Encl
ML18016A863
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/19/1999
From: Scarola J
CAROLINA POWER & LIGHT CO.
To:
NRC (Affiliation Not Assigned)
Shared Package
ML18016A865 List:
References
HNP-99-034, HNP-99-34, NUDOCS 9903260289
Download: ML18016A863 (3)


Text

CATEGORY 1 REGULATVRY INFORMATION DISTRIBUTION SYSTEM (RIDS)

C ACCESSION "NBR: 9903260289 DOC.DATE: 99/03/19 NOTARIZED: NO DOCKET ¹ FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AU EE,.NZiMF, AUTHOR AFFILIATION SC.AROMA,J.'ECIP;iVZIE Carolina Power' Light Co.

RECIPIENT AFFILIATION

SUBJECT:

Forwards "HNPP Operator Training Simulator, Simulator Certification Quadrennial Rept," IAW 10CFR55.45(b)(5)(ii).

NRC Form 474 & recpxired info'e simulator performance test A results & schedules, encl.

DISTRIBUTION CODE: A005D TITLE: Simulator COPIES RECEIVED:LTR Facility Certification - L GL-90-08 ENCL i SIZE: +4 T E

NOTES:Application for permit renewal filed. 0500040 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL FLANDERS,S 1 1 INTERN  : FILE CENTER 01 EXTERNAL: NRC PDR -1 1 D

N WASTETH HEklK SS NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 3 ENCL 3

~

c

~ ~ r Carolina Power & tight Company James Scarala PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant MPR 19 1S99 SERIAL: HNP-99-034 Director, Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 SIMULATORCERTIFICATION QUADRENNIALREPORT

Dear Sir or Madam:

In accordance with 10 CFR 55.45(b)(5)(ii), Carolina Power 8c Light Company (CP8cL) is submitting the enclosed report for the Harris Nuclear Plant (HNP) Simulator. This report is required every four years on the anniversary of the simulation facility certification. By letter dated March 21, 1991, CPS'ubmitted to the NRC certification that the simulation facility for the HNP meets the Commissions regulations.

Enclosed are the NRC Form 474 and the required information concerning simulator performance test results and schedules for HNP.

Questions regarding this submittal may be referred to Mr. J. H. Eads at (919) 362-2646.

Sincerely, MGW Enclosures c: Mr. J. B. Brady - NRC Senior Resident Inspector, HNP (w/o enclosures)

Mr. Rich Laufer - NRR Project Manager, HNP (w/o enclosures)

Mr. L. A. Reyes - NRC Regional Administrator, Region II (w/o enclosures) 9903260289 9903i9 PDR ADQCK 05000400 R PDR 5413 Shearon Harris Road New Hill, NC Tel 919 362-2502 Fax 919 362-2095