C ACCESSION "NBR:
FACIL:50-400 AU EE,.NZiMF, SC.AROMA,J.'ECIP;iVZIE CATEGORY 1
REGULATVRY INFORMATION DISTRIBUTION SYSTEM (RIDS) 9903260289 DOC.DATE: 99/03/19 NOTARIZED: NO Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTHOR AFFILIATION Carolina Power' Light Co.
RECIPIENT AFFILIATION DOCKET ¹ 05000400
SUBJECT:
Forwards "HNPP Operator Training Simulator, Simulator Certification Quadrennial Rept,"
& recpxired info'e simulator performance test results
& schedules, encl.
A T
E 0500040 NOTES:Application for permit renewal filed.
DISTRIBUTION CODE:
A005D COPIES RECEIVED:LTR L ENCL i SIZE:
+ 4 TITLE: Simulator Facility Certification - GL-90-08 RECIPIENT ID CODE/NAME FLANDERS,S COPIES LTTR ENCL 1
1 RECIPIENT ID CODE/NAME COPIES LTTR ENCL INTERN
- FILE CENTER 01 EXTERNAL: NRC PDR
-1 1
D N
HEklKSS NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTETH TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 3
ENCL 3
~'
c
~
~
r Carolina Power & tight Company PO Box 165 New Hill NC 27562 James Scarala Vice President Harris Nuclear Plant MPR 19 1S99 SERIAL: HNP-99-034 Director, Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEARPOWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 SIMULATORCERTIFICATIONQUADRENNIALREPORT
Dear Sir or Madam:
In accordance with 10 CFR 55.45(b)(5)(ii), Carolina Power 8c Light Company (CP8cL) is submitting the enclosed report for the Harris Nuclear Plant (HNP) Simulator.
This report is required every four years on the anniversary of the simulation facility certification.
By letter dated March 21, 1991, CPS'ubmitted to the NRC certification that the simulation facility for the HNP meets the Commissions regulations.
Enclosed are the NRC Form 474 and the required information concerning simulator performance test results and schedules for HNP.
Questions regarding this submittal may be referred to Mr. J. H. Eads at (919) 362-2646.
Sincerely, MGW Enclosures c:
Mr. J. B. Brady - NRC Senior Resident Inspector, HNP (w/o enclosures)
Mr. Rich Laufer - NRR Project Manager, HNP (w/o enclosures)
Mr. L. A. Reyes - NRC Regional Administrator, Region II(w/o enclosures) 9903260289 9903i9 PDR ADQCK 05000400 R
PDR 5413 Shearon Harris Road New Hill, NC Tel 919 362-2502 Fax 919 362-2095