ML17352A531: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 03/31/1994 | | issue date = 03/31/1994 | ||
| title = Monthly Operating Repts for Mar 1994 for Turkey Point Units 3 & 4.W/940413 Ltr | | title = Monthly Operating Repts for Mar 1994 for Turkey Point Units 3 & 4.W/940413 Ltr | ||
| author name = | | author name = Mowrey C, Plunkett T | ||
| author affiliation = FLORIDA POWER & LIGHT CO. | | author affiliation = FLORIDA POWER & LIGHT CO. | ||
| addressee name = | | addressee name = | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ACCELERATED DISTMBUTION DEMONSTRATION SYSTEM t | {{#Wiki_filter:t ACCELERATED DISTMBUTION DEMONSTRATION SYSTEM t | ||
NO FACIL:50-250 Turkey Point Plant,, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATXON MOWREY,C.L. | ~ | ||
Florida Power&Light Co.PLUNKETT,T.F. | REGULATORY INFORMATION DISTRXBUTION SYSTEM (RIDS) | ||
Florida Power&Light.Co. | ACCESSXON NBR:9404180387 DOC.DATE: 94/03/31 NOTARXZED: NO DOCKET g FACIL:50-250 Turkey Point Plant,, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATXON MOWREY,C.L. Florida Power & Light Co. | ||
PLUNKETT,T.F. | |||
RECIP.NAME Florida RECIPIENT AFFILXATION Power & Light. Co. gR I | |||
==SUBJECT:== | ==SUBJECT:== | ||
Monthly operating repts for Mar 1994 for Turkey Point Units 3&4.W/940413 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: | Monthly operating repts for Mar 1994 for Turkey Point Units D 3 & 4.W/940413 ltr. | ||
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: | |||
TITLE: Monthly Operating Report (per Tech Specs) | |||
NOTES: A RECIPIENT COPIES RECIPIENT COPXES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 PD 1 1 CROTEAU,R 1 1 D | |||
INTERNAL: AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 NRR/DRIL/RPEB E~IMS OEAB01 N~RJJ30 1 1 | |||
1 1 RGN2 1 | |||
1 1 | |||
1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 D | |||
D D | |||
NOTE TO ALL "RIDS" RECIPIENTS'LEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED! | |||
TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11 | |||
FPL',pp | FPL',pp i8 L-94-086 "i934 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen: | ||
Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1994 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, T.F.Plunkett Vice President Turkey Point Plant TFP/CLM/cm Attachments cc: S.D..Ebneter, Regional Administrator, Region II, USNRC T | Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1994 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4. | ||
Very truly yours, T. F. Plunkett Vice President Turkey Point Plant TFP/CLM/cm Attachments cc: S. D..Ebneter, Regional Administrator, Region II, USNRC T P. Johnson, | |||
~ Senior Resident Inspector, USNRC, Turkey Point Plant g ~OQ QQ5 9404180387 940331 I. | |||
PDR R | |||
ADOCK 05000250 | |||
, PDR I | |||
I( | |||
an Fpt Group company | |||
1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point 3 DATE COMPLETED BY A ril 11 1994 C. L. Mowre TELEPHONE 305-246-6204 MONTH MARCH 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 3/01/94 691 3/02/94 692 3/03/94 695 3/04/94 700 3/05/94 698 3/06/94 693 3/07/94 687 3/08/94 682 3/09/94 680 3/10/94 677 3/11/94 681 3/12/94 690 3/13/94 691 3/14/94 687 3/15/94 687 3/16/94 687 3/17/94 684 3/18/94 684 3/19/94 682 3/20/94 677 3/21/94 663 3/22/94 663 3/23/94 660 3/24/94 665 3/25/94 667 3/26/94 666 3/27/94 665 3/28/94 667 3/29/94 668 3/30/94 673 3/31/94 677 | |||
UNIT SHUTDOWNS: AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: Turke Point $ 3 DATE: | |||
COMPLETED BY: | |||
A ril C. L. Mowre 11 1994 TELEPHONE: 305 246-6204 REPORT MONTH MARCH 1994 No. Date Duration Reason2 Method of Licensee System Component Cause S Corrective Action to Type'/A (Hours) Shutting Event Code code Prevent Recurrence Down Reports Reactor N/A N/A N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method Exhibit G - instructions Exhibit - Same Source S - Scheduled A Equipment Failure 1 - Manual for Preparation of Data 1 | |||
B - Maintenance or Test Refueling 2 - Manual Scram Entry Sheets Licensee C 3 Automatic Scram Event Report (LER) File D - Regulatory restriction 4 Continued (NUREG-0161) | |||
E - Operator Training S 5 - Load Reduction License Examination 9 - Other (Explain) | |||
F - Administrative G - Operational Error (Explain) | |||
H - Other (Explain) | |||
OPERATING DATA REPORT DOCKET NO 50 250 DATE 4/1 1/94 COMPLETED BY C. L. MOWREY TELEPHONE 305/246/6204 OPERATING STATUS | |||
: 1. UNIT NAME: TURKEY POINT UNIT 3 | |||
: 2. REPORTING PERIOD: MARCH 1994 | |||
: 3. LICENSED THERMAL POWER (MWT): 2200 | |||
: 4. NAMEPLATE RATING (GROSS MWE): 760 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWE): 693 | |||
: 6. MAXIMUM DEPEMDAELE CAPACITY (DRESS M~WE 699 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) | |||
SINCE LAST REPORT, GIVE REASONS: | |||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) | |||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | |||
MONTHLY -YTD- CUMULATIVE | |||
: 11. HOURS IN REPORT PERIOD: 744 2160 186897.6 | |||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2160.0 123420.2 | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4 | |||
: 14. HOURS GENERATOR ON-LINE 744.0 2112.2 121645.5 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS 121.8 | |||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1637553 4612879 252752717 | |||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 529680 1507515 81089331 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 505949 1437959 76707464 | |||
: 19. UNIT SERVICE FACTOR 100.0 97.8 65. 1 | |||
: 20. UNIT AVAILABILITYFACTOR 100.0 97.8 65.2 | |||
: 21. CAPACITY FACTOR (USING MDC NET) 102. 1 100.0 62.6 | |||
: 22. CAPACITY FACTOR (USING DER NET) 98. 1 96. 1 59.2 | |||
: 23. UNIT FORCED OUTAGE RATE 0.0 2.2 11.7 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 014 REFUELING OUTAGE, APRII 1994 | |||
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE DOCKET NO. | OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE: | ||
50-250 Turke Point 3 A ril 11 | COMPLETED BY A | ||
C. | |||
ril 11 L. Mowre 1994 TELEPHONE: 305 246-6204 REPORT MONTH MARCH 1994 Unit 3 began the month at essentially 100% and maintained that level throughout the month. | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point DATE COMPLETED BY A ril 11 1994 C. L. Mowre 4 | |||
TELEPHONE 305-246-6204 MONTH MARCH 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 3/01/94 696 3/02/94 696 3/03/94 698 3/04/94 703 3/05/94 701 3/06/94 698 3/07/94 692 3/08/94 688 3/09/94 686 3/10/94 257 3/11/94 0 3/12/94 0 3/13/94 0 3/14/94 0 3/15/94 0 3/16/94 0 3/17/94 0 3/18/94 351 3/19/94 619 3/20/94 676 3/21/94 672 3/22/94 671 3/23/94 671 3/24/94 670 3/25/94 672 3/26/94 673 3/27/94 673 3/28/94 674 3/29/94 675 3/30/94 682 3/31/94 685 | |||
~ ~ | |||
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: | |||
DATE COMPLETED BY: C. L. Mowre A ril 11 1994 TELEPHONE 305 246-6204 REPORT MONTH MARCH 1994 No. Date Type Duration Reason Yethod of Licensee System Cause 4 Corrective Action to (Hours) Shutting Event Code Component Code Prevent Recurrence Down Reportf Reactor 02 031094 184.77 251-94-002 PIPEXX Shutdown to repair Yovable Incore Detector Flux Yapper Guide Tube 03 031894 0.0 N/A CC PIPEXX Steam Generator Chemistry Hold-point at 30% | |||
F - Forced Reason Yethod Exhibit 0 Instructions Exhibit - Same Source S Scheduled A - Equipment Failure 1 - Yanual for Preparation of Data 1 | |||
B Haintenance or Test 2 - Yanual Scram Entry Sheets Licensee C Refueling 3 Automatic Scram Event Report (LER) File D Regulatory restriction 4 - Continued (NUREG-0161) | |||
E - Operator Training 4 5 Load Reduction License Examination 9 Other (Explain) | |||
F Administrative G Operational Error (Explain) | |||
H Other (Explain) | |||
~ ~ | |||
OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 4/11/94 COMPLETED BY C. L. MOWREY TELEPHONE 305/246/6204 OPERATING STATUS | |||
: 1. UNIT NAME: TURKEY POINT UNIT 4 | |||
: 2. REPORTING PERIOD: MARCH 1994 | |||
: 3. LICENSED THERMAL POWER (MWT): 2200 | |||
: 4. NAMEPLATE RATING (GROSS MWE): 760 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWE): 693 | |||
: 6. MAXIMUM DEPENDASLE CAPACITY (GRDSE M~WE: 699 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) | |||
SINCE LAST REPORT, GIVE REASONS: | |||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) | |||
: 10. REASONS FOR RESTRICTIONS> IF ANY: | |||
MONTHLY -YTD- CUMULATIVE | |||
: 11. HOURS IN REPORT PERIOD: 744 2160 180629.0 | |||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 568.9 1984. 9 119265.2 | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6 | |||
: 14. HOURS GFNERATOR ON-LINE 559.2 1975. 2 115300.2 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS 577.3 | |||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1210387 4279371 243339326 | |||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 392485 1396955 77750925 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 372330 1330585 73565817 | |||
: 19. UNIT SERVICE FACTOR 75.2 = | |||
91.4 63.8 | |||
: 20. UNIT AVAILABILITYFACTOR 75.2 91.4 64.2 | |||
: 21. CAPACITY FACTOR (USING MOC NET) 75.1 92.5 62. 1 | |||
: 22. CAPACITY FACTOR M(USING DER NET) 72.2 88.9 58.8 | |||
: 23. UNIT FORCED OUTAGE RATE 24.8 8.5 12.7 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE | |||
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | |||
~ ~ | |||
~~ | ~ | ||
'UMMARY OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point DATE COMPLETE BY: | |||
A ril 11 1994 C. L. Mowre 4 | |||
TELEPHONE: 305 246-6204 REPORT MONTH MARCH 1994 Unit 4 began the month of March at essentially 100% power. On March 10, 1994, the unit was shut down to repair a leak on a guide tube for the Movable Incore Detector flux mapping system. | |||
Following completion of the repair, the unit had a hold-point at 30% for steam generator chemistry. The unit was returned to essentially 100% power on March 19, and remained at that level through the end of the month.}} | |||
The unit was returned to essentially 100%power on March 19, and remained at that level through the end of the month.}} |
Latest revision as of 07:36, 22 October 2019
ML17352A531 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 03/31/1994 |
From: | Mowrey C, Plunkett T FLORIDA POWER & LIGHT CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
L-94-086, L-94-86, NUDOCS 9404180387 | |
Download: ML17352A531 (14) | |
Text
t ACCELERATED DISTMBUTION DEMONSTRATION SYSTEM t
~
REGULATORY INFORMATION DISTRXBUTION SYSTEM (RIDS)
ACCESSXON NBR:9404180387 DOC.DATE: 94/03/31 NOTARXZED: NO DOCKET g FACIL:50-250 Turkey Point Plant,, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATXON MOWREY,C.L. Florida Power & Light Co.
PLUNKETT,T.F.
RECIP.NAME Florida RECIPIENT AFFILXATION Power & Light. Co. gR I
SUBJECT:
Monthly operating repts for Mar 1994 for Turkey Point Units D 3 & 4.W/940413 ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES: A RECIPIENT COPIES RECIPIENT COPXES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 PD 1 1 CROTEAU,R 1 1 D
INTERNAL: AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 NRR/DRIL/RPEB E~IMS OEAB01 N~RJJ30 1 1
1 1 RGN2 1
1 1
1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 D
D D
NOTE TO ALL "RIDS" RECIPIENTS'LEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11
FPL',pp i8 L-94-086 "i934 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1994 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, T. F. Plunkett Vice President Turkey Point Plant TFP/CLM/cm Attachments cc: S. D..Ebneter, Regional Administrator, Region II, USNRC T P. Johnson,
~ Senior Resident Inspector, USNRC, Turkey Point Plant g ~OQ QQ5 9404180387 940331 I.
PDR R
ADOCK 05000250
, PDR I
I(
an Fpt Group company
1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point 3 DATE COMPLETED BY A ril 11 1994 C. L. Mowre TELEPHONE 305-246-6204 MONTH MARCH 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 3/01/94 691 3/02/94 692 3/03/94 695 3/04/94 700 3/05/94 698 3/06/94 693 3/07/94 687 3/08/94 682 3/09/94 680 3/10/94 677 3/11/94 681 3/12/94 690 3/13/94 691 3/14/94 687 3/15/94 687 3/16/94 687 3/17/94 684 3/18/94 684 3/19/94 682 3/20/94 677 3/21/94 663 3/22/94 663 3/23/94 660 3/24/94 665 3/25/94 667 3/26/94 666 3/27/94 665 3/28/94 667 3/29/94 668 3/30/94 673 3/31/94 677
UNIT SHUTDOWNS: AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: Turke Point $ 3 DATE:
COMPLETED BY:
A ril C. L. Mowre 11 1994 TELEPHONE: 305 246-6204 REPORT MONTH MARCH 1994 No. Date Duration Reason2 Method of Licensee System Component Cause S Corrective Action to Type'/A (Hours) Shutting Event Code code Prevent Recurrence Down Reports Reactor N/A N/A N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method Exhibit G - instructions Exhibit - Same Source S - Scheduled A Equipment Failure 1 - Manual for Preparation of Data 1
B - Maintenance or Test Refueling 2 - Manual Scram Entry Sheets Licensee C 3 Automatic Scram Event Report (LER) File D - Regulatory restriction 4 Continued (NUREG-0161)
E - Operator Training S 5 - Load Reduction License Examination 9 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
OPERATING DATA REPORT DOCKET NO 50 250 DATE 4/1 1/94 COMPLETED BY C. L. MOWREY TELEPHONE 305/246/6204 OPERATING STATUS
- 1. UNIT NAME: TURKEY POINT UNIT 3
- 2. REPORTING PERIOD: MARCH 1994
- 3. LICENSED THERMAL POWER (MWT): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MWE): 693
- 6. MAXIMUM DEPEMDAELE CAPACITY (DRESS M~WE 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE
- 11. HOURS IN REPORT PERIOD: 744 2160 186897.6
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2160.0 123420.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
- 14. HOURS GENERATOR ON-LINE 744.0 2112.2 121645.5
- 15. UNIT RESERVE SHUTDOWN HOURS 121.8
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1637553 4612879 252752717
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 529680 1507515 81089331
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 505949 1437959 76707464
- 19. UNIT SERVICE FACTOR 100.0 97.8 65. 1
- 20. UNIT AVAILABILITYFACTOR 100.0 97.8 65.2
- 21. CAPACITY FACTOR (USING MDC NET) 102. 1 100.0 62.6
- 22. CAPACITY FACTOR (USING DER NET) 98. 1 96. 1 59.2
- 23. UNIT FORCED OUTAGE RATE 0.0 2.2 11.7
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 014 REFUELING OUTAGE, APRII 1994
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE:
COMPLETED BY A
C.
ril 11 L. Mowre 1994 TELEPHONE: 305 246-6204 REPORT MONTH MARCH 1994 Unit 3 began the month at essentially 100% and maintained that level throughout the month.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point DATE COMPLETED BY A ril 11 1994 C. L. Mowre 4
TELEPHONE 305-246-6204 MONTH MARCH 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 3/01/94 696 3/02/94 696 3/03/94 698 3/04/94 703 3/05/94 701 3/06/94 698 3/07/94 692 3/08/94 688 3/09/94 686 3/10/94 257 3/11/94 0 3/12/94 0 3/13/94 0 3/14/94 0 3/15/94 0 3/16/94 0 3/17/94 0 3/18/94 351 3/19/94 619 3/20/94 676 3/21/94 672 3/22/94 671 3/23/94 671 3/24/94 670 3/25/94 672 3/26/94 673 3/27/94 673 3/28/94 674 3/29/94 675 3/30/94 682 3/31/94 685
~ ~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME:
DATE COMPLETED BY: C. L. Mowre A ril 11 1994 TELEPHONE 305 246-6204 REPORT MONTH MARCH 1994 No. Date Type Duration Reason Yethod of Licensee System Cause 4 Corrective Action to (Hours) Shutting Event Code Component Code Prevent Recurrence Down Reportf Reactor 02 031094 184.77 251-94-002 PIPEXX Shutdown to repair Yovable Incore Detector Flux Yapper Guide Tube 03 031894 0.0 N/A CC PIPEXX Steam Generator Chemistry Hold-point at 30%
F - Forced Reason Yethod Exhibit 0 Instructions Exhibit - Same Source S Scheduled A - Equipment Failure 1 - Yanual for Preparation of Data 1
B Haintenance or Test 2 - Yanual Scram Entry Sheets Licensee C Refueling 3 Automatic Scram Event Report (LER) File D Regulatory restriction 4 - Continued (NUREG-0161)
E - Operator Training 4 5 Load Reduction License Examination 9 Other (Explain)
F Administrative G Operational Error (Explain)
H Other (Explain)
~ ~
OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 4/11/94 COMPLETED BY C. L. MOWREY TELEPHONE 305/246/6204 OPERATING STATUS
- 1. UNIT NAME: TURKEY POINT UNIT 4
- 2. REPORTING PERIOD: MARCH 1994
- 3. LICENSED THERMAL POWER (MWT): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MWE): 693
- 6. MAXIMUM DEPENDASLE CAPACITY (GRDSE M~WE: 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS> IF ANY:
MONTHLY -YTD- CUMULATIVE
- 11. HOURS IN REPORT PERIOD: 744 2160 180629.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 568.9 1984. 9 119265.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
- 14. HOURS GFNERATOR ON-LINE 559.2 1975. 2 115300.2
- 15. UNIT RESERVE SHUTDOWN HOURS 577.3
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1210387 4279371 243339326
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 392485 1396955 77750925
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 372330 1330585 73565817
- 19. UNIT SERVICE FACTOR 75.2 =
91.4 63.8
- 20. UNIT AVAILABILITYFACTOR 75.2 91.4 64.2
- 21. CAPACITY FACTOR (USING MOC NET) 75.1 92.5 62. 1
- 22. CAPACITY FACTOR M(USING DER NET) 72.2 88.9 58.8
- 23. UNIT FORCED OUTAGE RATE 24.8 8.5 12.7
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
~ ~
~
'UMMARY OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point DATE COMPLETE BY:
A ril 11 1994 C. L. Mowre 4
TELEPHONE: 305 246-6204 REPORT MONTH MARCH 1994 Unit 4 began the month of March at essentially 100% power. On March 10, 1994, the unit was shut down to repair a leak on a guide tube for the Movable Incore Detector flux mapping system.
Following completion of the repair, the unit had a hold-point at 30% for steam generator chemistry. The unit was returned to essentially 100% power on March 19, and remained at that level through the end of the month.