ML17353A857: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:REGULAT Y INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9608200148 DOC.DATE: 96/07/31 NOTARIZED: | {{#Wiki_filter:REGULAT Y INFORMATION DISTRIBUTION SYSTEM (RIDS) | ||
NO DOCKET I FACIL:50-'250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 5t)~251.Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION KNORR,J.E. | ACCESSION NBR:9608200148 DOC.DATE: 96/07/31 NOTARIZED: NO DOCKET I FACIL:50-'250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 5t)~251. Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power 6 Light Co. | ||
Florida Power 6 Light Co.HOVEY,R.J. | HOVEY,R.J. Florida Power 6 Light Co. | ||
Florida Power 6 Light Co.RECIP.NAME RECIPIENT A(FILIATION | RECIP.NAME RECIPIENT A(FILIATION ltr.for for Turkey Point Plant | ||
==SUBJECT:== | ==SUBJECT:== | ||
Monthly operating repts | Monthly operating repts July 1996 Units 3 a 4.W/960813 DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs) L ENCL I SIZE: | ||
PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL"'9 | NOTES: | ||
Q RECIPIENT COPIES RECIPIENT COPIES 4 ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD2-3 PD 1 1 CROTEAU,R 1 1 R | |||
INTERNAL: AEOD/SPD/RRAB 1 1 ILE CE R 1 1 NRR/DRPM/PECB 1 1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D | |||
E | |||
~ | |||
N NOTE TO ALL "RIDS" RECIPIENTS: | |||
PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED! | |||
TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL " '9 | |||
T AUG g3 tggg L-96-203 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen: | |||
Re: Turkev Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the July 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4. | |||
Very truly yours, gj R. J. Hov y Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9608200i48 96073i PDR ADOCK 05000250 R PDR, an FpL Group companY | |||
DOCKET NO.UNIT: DATE COMPLETE BY: TELEPHONE: | AVERAGE DAIL IT POWER LEVEL DOCKET NO. 50- 250 UNIT Turkey Point 43 DATE Aug 06, 1996 COMPLETED BY J. E. Knorr TELEPHONE (305) 246-6757 MONIH Julu. 1W6 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 07/01/96 675 07/02/96 674 07/03/96 673 07/04/96 673 07/05/96 674 07/06/96 674 07/07/96 672 07/08/96 672 07/09/96 670 07/10/96 673 07/11/96 674 07/12/96 676 07/13/96 673 07/14/96 674 07/15/96 673 07/16/96 677 07/17/96 679 07/18/96 679 07/19/96 678 07/20/96 673 07/21/96 669 07/22/96 664 07/23/96 666 07/24/96 669 07/25/96 673 07/26/96 676 07/27/96 680 07/28/96 680 07/29/96 680 07/30/96 679 07/31/96 674 | ||
REPORT MONTH Unit 4 operated at approximately 100%reactor power until July 12.The unit was taken off line to repair a valve associated with the feedwater heaters.Feedwater heater level control repairs and work on a main feed pump seal was also completed. | |||
The Unit returned to 100%power on July 16 and remained at approximately that level for the remainder of the month of July. | UNIT SHUTDOHNS AND POWER REDUCTIONS DOCKET NO. | ||
'I\1 0 j}} | UNIT NAME: | ||
DATE: | |||
COMPLETED BY: | |||
TELEPHONE: | |||
REPORT MONTH No. Da'te Duration Reason Method Spstqa Compon()nt Cause C Corrective Action to (Hours) or Event Code Prevent Recurrence Reactor'icensee Shutting Down Reports s | |||
N/A F -- Forced Reason A Equipment Failure Method 1 - Nanual xhibit C - Instructions or Preparation Exhibit 1 - Same Source Scheduled of Data 2 - Nanual Scram S p B Haintenance or Test Entrv Sheets Licensee f | |||
C Re ue ling 3 | |||
-- Automatic Scram Event Report (LER) File D | |||
E -- Regulatory restriction Operator Training 6 4 | |||
5 | |||
- | |||
Continued Load Reduction (NUREG-0161) | |||
License Examination Other (Explain) | |||
F - Administrative 9 | |||
C - Operational Error (Explain) | |||
H - Other (Explain) | |||
OP ING DATA REPORT DOCKET NO 50 -250 DATE 08/06/96 PREPARED BY J.E. Knorr TELEPHONE (305) 246-6757 | |||
: 1. UNIT NAME: TURKEY POINT UNIT 3 | |||
: 2. REPORTING PERIOD: July, 1996 | |||
: 3. UCENSED THERMAL POWER (MWI): 2200 | |||
: 4. NAMEPLATE RATING (GROSS MWE): 760 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWE): 693 | |||
: 6. MAXIMUMDEPENDABLE CAPACflY(GROSS MWE): 699 | |||
: 7. MAXIMUMDEPENDABLE CAPACllY(NET MWE): 666 | |||
: 8. IF CHANGES OCCUR IN CAPACIIY RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS: | |||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) | |||
: 10. RESONS FOR RESTRICTION. IF ANY: | |||
MONTHLY - YTD- CUMULATIVE | |||
: 11. HOURS IN REPORT PERIOD: 7440 5111.0 207368.6 | |||
: 12. NUMBER OF HOURS REACTOR WAS CRmCAL 7440 4940.9 141846.7 | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS OJ) 0.0 844A | |||
: 14. HOURS GENERATOR ON-UNE 744J) 4907.1 139802.9 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8 | |||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1632370 10542615 291573634 | |||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 525945 3442835 93679820 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 501469 3282270 88696166 | |||
: 19. UNIT SERVICE FACTOR 100.0 96.0 67A | |||
: 20. UNIT AVAILABILllYFACTOR 100.0 968) 67A | |||
: 21. CAPACllYFACTOR ( USING MDC NET) 1012 963 642 | |||
: 22. CAPACflYFACTOR ( USING DER NET ) 973 92.6 61.7 | |||
: 23. UNff FORCED OUTAGE RATE 0.0 4.0 10.5 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: | |||
None | |||
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | |||
DOCKET NO. .'K=25Q. | |||
UNIT'ATE COMPLETED BY: | |||
TELEPHONE: | |||
REPORT MONTH Unit 3 operated at approximately 100% reactor power for the month of July 1996. | |||
AVERAGE DAIL IT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point 44 DATE Aug 06, 1996 COMPLETED BY J. E. Knorr TELEPHONE (305) 246-6757 MONIH Julu. 1W6 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 07/01/96 664 07/02/96 658 07/03/96 659 07/04/96 660 07/05/96 658 07/06/96 657 07/07/96 654 07/08/96 653 07/09/96 651 07/10/96 653 07/11/96 656 07/12/96 530 07/13/96 0 07/14/96 0 07/15/96 185 07/16/96 611 07/17/96 663 07/18/96 666 07/19/96 664 07/20/96 661 07/21/96 657 07/22/96 654 07/23/96 655 07/24/96 657 07/25/96 661 07/26/96 663 07/27/96 665 07/28/96 663 07/29/96 658 07/30/96 656 07/31/96 654 | |||
UNff SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: Turkey Point P 4 DATE: Aug 06. 1996 COMPLETED BY: J. E. Knorr REPORT MONTH JULY 1996 TELEPHONE: (305) 2486757 No. Date Type Duration Reason Method of Ucensee System Component Cause and Corrective 1 (Hours) 2 Shutting Event Code Action to Down 3 Report 4 4 Code 5 Prevent Recurrence: | |||
00001014 07/12/96 N/A HH VALVEX Reduced power to repair valve on feedwater reheater 00001015 07/15/96 0.0 N/A HH INSTRU Feedwater level control 00001016 07/16/96 0.0 N/A HH PUMPXX Main feed pump seal repair | |||
: 1. F Forced 2. A - Equipment Failure (Explain) 3. 1-Manual 4. Exibit G - Instructions for S Scheduled B - Maintenance or test 2- Manual Scram Preparation of Data Entry C - Refueling 3- Automatic Scram Sheets ucensee Event Report D - Regulatory Restriction 4- Continued (LER) File (NUREG4161) | |||
E - Operator Training .LIcense Examination 5- Load Reduction F - Administraitive 5. | |||
G - Operational Error (Explain) 9- Other (Explain) Exibit I - Same Source H - Other (Explain) | |||
U 0 TING DATA REPORT DOCKET NO 50 -251 DATE 08/13/96 PREPARED BY J. E. Knorr TELEPHONE (305) 546-6757 | |||
: l. UNIT NAME: TURKEY POINT UNIT 4 | |||
: 2. REPORTING PERIOD: July, 1996 | |||
: 3. UCENSED THERMAL POWER (MUR): 2200 | |||
: 4. NAMEPlATE RATING (GROSS MWE): 760 | |||
: 5. DESIGN ELECTRICAL RATING (NET MW9: 693 | |||
: 6. MAXIMUMDEPENDABLE CAPACIlY(GROSS MWE): 699 | |||
: 7. MAXIMUMDEPENDABLE CAPACIIY(NET MWE): 666 | |||
: 8. IF CHANGES OCCUR IN CAPACI1Y RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE lAST REPORT. | |||
GIVE REASONS: | |||
: 9. POWER LEVELTO WHICH RESTRICTED, IF ANY (NET MWE) | |||
: 10. RESONS FOR RESTRICTION, IF ANY: | |||
MONTHLY - YTD- CUMUIATIVE | |||
: 11. HOURS IN REPORT PERIOD: 744.0 5111.0 13871 2) | |||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 7449 4294.1 137780.9 | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 OJ) 166.6 | |||
: 14. HOURS GENERATOR ON-UNE 688.9 4173.6 133566.7 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS OJ) OJI 5772 | |||
: 16. GROSS THERMAL ENERGY GENE RATED (MWH) 1480079 8889299 282562556 | |||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 465202 2856594 90377735 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 442170 2716117 85601032 | |||
: 19. UNIT SERVICE FACTOR 92.6 81.7 66A | |||
: 20. UNIT AVAllABIUIY FACTOR 92.6 81.7 66A | |||
: 21. CAPACIIYFACTOR ( USING MDC NET ) 892 79.8 63.9 | |||
: 22. CAPACIlY FACTOR ( USING DER NET ) 85.8 76.7 88.6 | |||
: 23. UNIT FORCED OUTAGE RATE 7A 1.9 10.0 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: | |||
None | |||
: 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: | |||
DOCKET NO. | |||
UNIT: | |||
DATE COMPLETE BY: | |||
TELEPHONE: | |||
REPORT MONTH Unit 4 operated at approximately 100% reactor power until July | |||
: 12. The unit was taken off line to repair a valve associated with the feedwater heaters. Feedwater heater level control repairs and work on a main feed pump seal was also completed. | |||
The Unit returned to 100% power on July 16 and remained at approximately that level for the remainder of the month of July. | |||
'I \ | |||
1 0 j}} |
Revision as of 07:18, 22 October 2019
ML17353A857 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 07/31/1996 |
From: | Hovey R, Knorr J FLORIDA POWER & LIGHT CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
L-96-203, NUDOCS 9608200148 | |
Download: ML17353A857 (15) | |
Text
REGULAT Y INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9608200148 DOC.DATE: 96/07/31 NOTARIZED: NO DOCKET I FACIL:50-'250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 5t)~251. Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power 6 Light Co.
HOVEY,R.J. Florida Power 6 Light Co.
RECIP.NAME RECIPIENT A(FILIATION ltr.for for Turkey Point Plant
SUBJECT:
Monthly operating repts July 1996 Units 3 a 4.W/960813 DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs) L ENCL I SIZE:
NOTES:
Q RECIPIENT COPIES RECIPIENT COPIES 4 ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD2-3 PD 1 1 CROTEAU,R 1 1 R
INTERNAL: AEOD/SPD/RRAB 1 1 ILE CE R 1 1 NRR/DRPM/PECB 1 1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D
E
~
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL " '9
T AUG g3 tggg L-96-203 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
Re: Turkev Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the July 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, gj R. J. Hov y Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9608200i48 96073i PDR ADOCK 05000250 R PDR, an FpL Group companY
AVERAGE DAIL IT POWER LEVEL DOCKET NO. 50- 250 UNIT Turkey Point 43 DATE Aug 06, 1996 COMPLETED BY J. E. Knorr TELEPHONE (305) 246-6757 MONIH Julu. 1W6 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 07/01/96 675 07/02/96 674 07/03/96 673 07/04/96 673 07/05/96 674 07/06/96 674 07/07/96 672 07/08/96 672 07/09/96 670 07/10/96 673 07/11/96 674 07/12/96 676 07/13/96 673 07/14/96 674 07/15/96 673 07/16/96 677 07/17/96 679 07/18/96 679 07/19/96 678 07/20/96 673 07/21/96 669 07/22/96 664 07/23/96 666 07/24/96 669 07/25/96 673 07/26/96 676 07/27/96 680 07/28/96 680 07/29/96 680 07/30/96 679 07/31/96 674
UNIT SHUTDOHNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
REPORT MONTH No. Da'te Duration Reason Method Spstqa Compon()nt Cause C Corrective Action to (Hours) or Event Code Prevent Recurrence Reactor'icensee Shutting Down Reports s
N/A F -- Forced Reason A Equipment Failure Method 1 - Nanual xhibit C - Instructions or Preparation Exhibit 1 - Same Source Scheduled of Data 2 - Nanual Scram S p B Haintenance or Test Entrv Sheets Licensee f
C Re ue ling 3
-- Automatic Scram Event Report (LER) File D
E -- Regulatory restriction Operator Training 6 4
5
-
Continued Load Reduction (NUREG-0161)
License Examination Other (Explain)
F - Administrative 9
C - Operational Error (Explain)
H - Other (Explain)
OP ING DATA REPORT DOCKET NO 50 -250 DATE 08/06/96 PREPARED BY J.E. Knorr TELEPHONE (305) 246-6757
- 1. UNIT NAME: TURKEY POINT UNIT 3
- 2. REPORTING PERIOD: July, 1996
- 3. UCENSED THERMAL POWER (MWI): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MWE): 693
- 6. MAXIMUMDEPENDABLE CAPACflY(GROSS MWE): 699
- 7. MAXIMUMDEPENDABLE CAPACllY(NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACIIY RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. RESONS FOR RESTRICTION. IF ANY:
MONTHLY - YTD- CUMULATIVE
- 11. HOURS IN REPORT PERIOD: 7440 5111.0 207368.6
- 12. NUMBER OF HOURS REACTOR WAS CRmCAL 7440 4940.9 141846.7
- 13. REACTOR RESERVE SHUTDOWN HOURS OJ) 0.0 844A
- 14. HOURS GENERATOR ON-UNE 744J) 4907.1 139802.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1632370 10542615 291573634
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 525945 3442835 93679820
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 501469 3282270 88696166
- 19. UNIT SERVICE FACTOR 100.0 96.0 67A
- 20. UNIT AVAILABILllYFACTOR 100.0 968) 67A
- 21. CAPACllYFACTOR ( USING MDC NET) 1012 963 642
- 22. CAPACflYFACTOR ( USING DER NET ) 973 92.6 61.7
- 23. UNff FORCED OUTAGE RATE 0.0 4.0 10.5
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
DOCKET NO. .'K=25Q.
UNIT'ATE COMPLETED BY:
TELEPHONE:
REPORT MONTH Unit 3 operated at approximately 100% reactor power for the month of July 1996.
AVERAGE DAIL IT POWER LEVEL DOCKET NO. 50-251 UNIT Turkey Point 44 DATE Aug 06, 1996 COMPLETED BY J. E. Knorr TELEPHONE (305) 246-6757 MONIH Julu. 1W6 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 07/01/96 664 07/02/96 658 07/03/96 659 07/04/96 660 07/05/96 658 07/06/96 657 07/07/96 654 07/08/96 653 07/09/96 651 07/10/96 653 07/11/96 656 07/12/96 530 07/13/96 0 07/14/96 0 07/15/96 185 07/16/96 611 07/17/96 663 07/18/96 666 07/19/96 664 07/20/96 661 07/21/96 657 07/22/96 654 07/23/96 655 07/24/96 657 07/25/96 661 07/26/96 663 07/27/96 665 07/28/96 663 07/29/96 658 07/30/96 656 07/31/96 654
UNff SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: Turkey Point P 4 DATE: Aug 06. 1996 COMPLETED BY: J. E. Knorr REPORT MONTH JULY 1996 TELEPHONE: (305) 2486757 No. Date Type Duration Reason Method of Ucensee System Component Cause and Corrective 1 (Hours) 2 Shutting Event Code Action to Down 3 Report 4 4 Code 5 Prevent Recurrence:
00001014 07/12/96 N/A HH VALVEX Reduced power to repair valve on feedwater reheater 00001015 07/15/96 0.0 N/A HH INSTRU Feedwater level control 00001016 07/16/96 0.0 N/A HH PUMPXX Main feed pump seal repair
- 1. F Forced 2. A - Equipment Failure (Explain) 3. 1-Manual 4. Exibit G - Instructions for S Scheduled B - Maintenance or test 2- Manual Scram Preparation of Data Entry C - Refueling 3- Automatic Scram Sheets ucensee Event Report D - Regulatory Restriction 4- Continued (LER) File (NUREG4161)
E - Operator Training .LIcense Examination 5- Load Reduction F - Administraitive 5.
G - Operational Error (Explain) 9- Other (Explain) Exibit I - Same Source H - Other (Explain)
U 0 TING DATA REPORT DOCKET NO 50 -251 DATE 08/13/96 PREPARED BY J. E. Knorr TELEPHONE (305) 546-6757
- l. UNIT NAME: TURKEY POINT UNIT 4
- 2. REPORTING PERIOD: July, 1996
- 3. UCENSED THERMAL POWER (MUR): 2200
- 4. NAMEPlATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MW9: 693
- 6. MAXIMUMDEPENDABLE CAPACIlY(GROSS MWE): 699
- 7. MAXIMUMDEPENDABLE CAPACIIY(NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACI1Y RATINGS ( ITEMS NUMBER 3 THROUGH 7 ) SINCE lAST REPORT.
GIVE REASONS:
- 9. POWER LEVELTO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. RESONS FOR RESTRICTION, IF ANY:
MONTHLY - YTD- CUMUIATIVE
- 11. HOURS IN REPORT PERIOD: 744.0 5111.0 13871 2)
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 7449 4294.1 137780.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 OJ) 166.6
- 14. HOURS GENERATOR ON-UNE 688.9 4173.6 133566.7
- 15. UNIT RESERVE SHUTDOWN HOURS OJ) OJI 5772
- 16. GROSS THERMAL ENERGY GENE RATED (MWH) 1480079 8889299 282562556
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 465202 2856594 90377735
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 442170 2716117 85601032
- 19. UNIT SERVICE FACTOR 92.6 81.7 66A
- 20. UNIT AVAllABIUIY FACTOR 92.6 81.7 66A
- 21. CAPACIIYFACTOR ( USING MDC NET ) 892 79.8 63.9
- 22. CAPACIlY FACTOR ( USING DER NET ) 85.8 76.7 88.6
- 23. UNIT FORCED OUTAGE RATE 7A 1.9 10.0
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS:
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
DOCKET NO.
UNIT:
DATE COMPLETE BY:
TELEPHONE:
REPORT MONTH Unit 4 operated at approximately 100% reactor power until July
- 12. The unit was taken off line to repair a valve associated with the feedwater heaters. Feedwater heater level control repairs and work on a main feed pump seal was also completed.
The Unit returned to 100% power on July 16 and remained at approximately that level for the remainder of the month of July.