ML17354A721: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 10/31/1997
| issue date = 10/31/1997
| title = Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr
| title = Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr
| author name = HOVEY R J, MOWREY C L
| author name = Hovey R, Mowrey C
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:~O~~CATEGORY 1 REGULAT.INFORMATION DISTRIBUTIO
{{#Wiki_filter:CATEGORY 1
~'YSTEM (RIDS)ACCESSION NBR:9711280305 DOC.DATE: 97/10/31 NOTARIZED:
        ~O
NO DOCKET N FACXL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250<50-)51 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAMQi'UTHOR AFFILIATION MOWREY,C.L.
  ~ ~
Florida Power 8 Light.Co.HOVEY,R.J.
REGULAT .     INFORMATION DISTRIBUTIO         ~'YSTEM (RIDS)
Florida Power E Light Co.RECIP.NAME RECIPIENT AFFILIATION
ACCESSION NBR:9711280305               DOC.DATE:   97/10/31     NOTARIZED: NO             DOCKET N FACXL:50-250 Turkey Point           Plant, Unit 3, Florida         Power and   Light   C 05000250
            < 50-)51 Turkey Point Plant, Unit 4, Florida               Power and   Light   C 05000251 AUTH.NAMQi'UTHORAFFILIATION MOWREY,C.L.             Florida Power 8 Light. Co.
HOVEY,R.J.             Florida Power E Light Co.
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for Oct 1997 for Turkey Point, Units 3&.4.W/971114 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: E RECIPIENT ID CODE/NAME PD2-3 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN2 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CROTEAU,R.FXLE CENTE 1 O/5B~/P COPIES LTTR ENCL 1 1 1 1 1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D U N NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating repts         for Oct 1997     for Turkey Point, Units 3 &. 4.W/971114   ltr.
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 I~~I NOY 14 fggp L-97-284 10 CFR 550.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the October 1997 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, R.J.Hovey Vice President Turkey Point Plant CLM Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 97ii280305 97i03i PDR ADOCK 05000250 R PDR an FPL Group company llllllllllllllllllllllllllllllllllllllll AVERAGE DAILY UNIT POWER LEVEL MONTH October, 1997 DOCKET NO.50-250 UNIT Turkey Point&#xb9;3 DATE Nov 05, 1997 COMPLETED BY C.L.Mowrey TELEPHONE (305)246-6204 DAY 10/01/97 10/02/97 10/03/97 10/04/97 10/05/97 10/06/97 10/07/97 10/08/97 10/09/97 10/1 0/97 10/1 1/97 10/1 2/97 10/13/97 10/1 4/97 10/15/97$0/1 6/97 10/1 7/97 10/18/97 10/19/97 10/20/97 10/21/97 10/22/97 10/23/97 10/24/97 10/25/97 10/26/97 10/27/97 10/28/97 10/29/97 10/30/97 10/31/97 AVERAGE DAILY POWER LEVEL (MWe-Net)711 712 710 709 711 715 717 717 716 713 715 716 718 719 720 719 714 713 716 722 723 720 719 718 716 711 709 711 715 713 711 DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT UNIT 3 November 3 1997~C.L.Me wre REPORTING PERIOD October 1997 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)MONTH 745.0 745.0 0.0-YTD-6202.3 6107.8 0.0 532721.0 4204068.0 CUMULATIVE 151653.8 149494.9 121.8 95364274.0 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
DISTRIBUTION CODE: IE24D           COPIES RECEIVED:LTR           ENCL       SIZE:
REPORT MONTH October 1997 50-250 k November 3 1997~L.L.M 305 246-6204 No.Date Type Duration[Hours)Reasons Nethod of Shutting Down Reactor'ause
TITLE: Monthly Operating Report (per Tech Specs)
&Corrective Action Comments N/A E-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance o Test C-Refueling D-Regulatory restriction E-Operator Train).ng 4 License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Nethod 1-Manual 2-Nanual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other{Explain)  
E NOTES:
RECIPIENT            COPIES                RECIPIENT         COPIES ID CODE/NAME         LTTR ENCL          ID  CODE/NAME      LTTR ENCL PD2-3 PD                 1      1        CROTEAU,R              1      1 INTERNAL: AEOD/SPD/RRAB                   1      1      . FXLE CENTE        1    1      1 NRR/DRPM/PECB             1     1       O /5B~/P               1     1 RGN2                      1     1 EXTERNAL: LITCO BRYCE,J H                 1     1       NOAC                    1     1 NRC PDR                  1     1 D
U N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR                   10   ENCL   10
 
I
    ~ ~
I
 
NOY 14 fggp L-97-284 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:     Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the October 1997 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, R. J. Hovey Vice President Turkey Point Plant CLM Attachments cc: Regional Administrator, Region   II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 97ii280305 97i03i PDR     ADOCK     05000250 R                     PDR llllllllllllllllllllllllllllllllllllllll an FPL Group company
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 250 UNIT         Turkey Point &#xb9;3 DATE         Nov 05, 1997 COMPLETED BY C. L. Mowrey TELEPHONE   (305) 246 - 6204 MONTH      October, 1997 DAY           AVERAGE DAILY POWER LEVEL (MWe-Net) 10/01/97                 711 10/02/97                 712 10/03/97                 710 10/04/97                 709 10/05/97                 711 10/06/97                 715 10/07/97                 717 10/08/97                 717 10/09/97                 716 10/1 0/97                 713 10/1 1/97                 715 10/1 2/97                 716 10/13/97                 718 10/1 4/97                 719 10/15/97                 720
          $ 0/1 6/97               719 10/1 7/97                 714 10/18/97                 713 10/19/97                 716 10/20/97                 722 10/21/97                 723 10/22/97                 720 10/23/97                 719 10/24/97                 718 10/25/97                 716 10/26/97                 711 10/27/97                 709 10/28/97                 711 10/29/97                 715 10/30/97                 713 10/31/97                 711
 
DOCKET NO.                     50-250 UNIT NAME                      TURKEY POINT UNIT 3 DATE                            November 3 1997 COMPLETED BY                    ~C. L. Me wre TELEPHONE REPORTING PERIOD October 1997 (Month/Year)
: 1. Design Electrical Rating (MWe-Net)             720
: 2. Maximum Dependable Capacity (MWe-Net)           693 MONTH      -YTD-  CUMULATIVE
: 3. Number of Hours Reactor Was Critical                 745.0    6202.3    151653.8
: 4. Number of Hours Generator Was On Line                 745.0    6107.8    149494.9
: 5. Unit Reserve Shutdown Hours                             0.0       0.0       121.8
: 6. Net Electrical Energy (MWH)                        532721.0 4204068.0   95364274.0
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.       50-250 UNIT NAME:         k DATE:           November 3 1997 COMPLETED BY: ~L. L. M TELEPHONE:        305 246-6204 REPORT MONTH October 1997 No.         Date Type     Duration       Reasons      Nethod              & Corrective Action
[Hours)                       of                   Comments Reactor'ause Shutting Down N/A E - Forced             Reason                        Nethod S - Scheduled         A - Equipment   Failure       1 - Manual B - Maintenance o   Test     2 - Nanual Scram C - Refueling                 3 -  Automatic Scram D - Regulatory restriction   4 -  Continued E - Operator Train).ng 4     5 -  Load Reduction License Examination       9 -  Other {Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-250 UN.'N DATE: November 3 1997 COMPI.E E Y: C.TE H HDNE:: REPORT MONTH October 1997 Unit 3 operated at essentially 100%power for the entire month of October.
OF OPERATING EXPERIENCE DOCKET NO.             50-250 UN     .'
AVERAGE DAlLY UNIT POWER LEVEL MONTH October, 1997 DOCKET NO.50-251 UNIT Turkey Point&#xb9;4 DATE Nov 05, 1997 COMPLETED BY C.L.Mowrey TELEPHONE (305)246-6204 DAY 10/01/97 10/02/97 10/03/97 10I04I97 10/05/97 10/06/97 10/07/97 10/08/97 10/09/97 10/10/97 10/11/97 10/1 2/97 10/13/97 10/14/97 10/15/97 10/1 6/97 10/17/97 10/1 8/97 10/1 9/97 10/20/97 10/21I97 10/22/97 10/23/97 10/24/97 10/25/97 10/26/97 10/27/97 10/28/97 10/29/97 10/30/97 10/31/97 AVERAGE DAILY POWER LEVEL (MWe-Net)0 0 0 0 0 0 0 0 0 0 0 0 0 120 210 272 296 571 709 720 720 715 713 716 716 712 708 712 716 715 712 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT UNIT 4 November 3 1997~C.L.Mowre REPORTING PERIOD October 1997 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours MONTH 465.5 434.7 0.0-YTD-6390.5 6346.5 0.0 CUMULATIVE 147843.5 143512.5 577.2 6.Net Electrical Energy (MWH)256243.0 4383922.0 92433000.0 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY TELEPHONE:
N DATE:                 November 3 1997 COMPI.E E       Y:     C.
50-251 TkPi N4 November 3 1997 C.L.Mowre 305 246-6204 REPORT MONTH October 1997 Ho.Date Duration (Hours)Reason*Hethod of Shutting Down Reactor'ause
TE H HDNE::
&Corrective Action to Prevent Recurrence 1053 9/8/97 309.0 Refueling outage 1055 10/14/97 1.3 Unit taken offline for turbine overspeed test F-Forced S-Scheduled Reason A-Equipment Failure 8-Naintenance or Test C-Refueling D-Regulatory restriction E-Operator Training I License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-)4anual 2-Hanual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)  
REPORT MONTH October 1997 Unit 3 operated at essentially 100% power for the entire month of October.
 
AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO. 50 - 251 UNIT         Turkey Point &#xb9;4 DATE         Nov 05, 1997 COMPLETED BY C. L. Mowrey TELEPHONE   (305) 246 - 6204 MONTH      October, 1997 DAY           AVERAGE DAILY POWER LEVEL (MWe-Net) 10/01/97                     0 10/02/97                     0 10/03/97                     0 10I04I97                     0 10/05/97                     0 10/06/97                     0 10/07/97                     0 10/08/97                     0 10/09/97                     0 10/10/97                     0 10/11/97                     0 10/1 2/97                   0 10/13/97                     0 10/14/97                   120 10/15/97                   210 10/1 6/97                 272 10/17/97                   296 10/1 8/97                 571 10/1 9/97                 709 10/20/97                   720 10/21I97                   720 10/22/97                   715 10/23/97                   713 10/24/97                   716 10/25/97                   716 10/26/97                   712 10/27/97                   708 10/28/97                   712 10/29/97                   716 10/30/97                   715 10/31/97                   712
 
OPERATING DATA REPORT DOCKET NO.                     50-251 UNIT NAME                      TURKEY POINT UNIT 4 DATE                            November 3 1997 COMPLETED BY                    ~C. L. Mowre TELEPHONE REPORTING PERIOD October 1997 (Month/Year)
: 1. Design Electrical Rating (MWe-Net)             720
: 2. Maximum Dependable Capacity (MWe-Net)           693 MONTH      -YTD-  CUMULATIVE
: 3. Number of Hours Reactor Was Critical                 465.5    6390.5    147843.5
: 4. Number of Hours Generator Was On Line                 434.7    6346.5    143512.5
: 5. Unit Reserve Shutdown Hours                             0.0       0.0       577.2
: 6. Net Electrical Energy (MWH)                       256243.0 4383922.0   92433000.0
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.               50-251 UNIT NAME:               TkPi        N4 DATE:                   November 3 1997 COMPLETED BY            C. L. Mowre TELEPHONE:                305 246-6204 REPORT MONTH October 1997 Ho.           Date       Duration       Reason*     Hethod                             & Corrective Action to (Hours)                      of                              Prevent Recurrence Reactor'ause Shutting Down 1053         9/8/97         309.0                                 Refueling outage 1055       10/14/97         1.3                                   Unit taken offline for turbine overspeed test F - Forced           Reason                        Method S - Scheduled       A - Equipment Failure       1 - )4anual 8 - Naintenance or Test       2  Hanual Scram C - Refueling                 3 - Automatic Scram D - Regulatory restriction   4  Continued E - Operator Training I       5 - Load Reduction License Examination     9 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETE BY: TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO.           50-251 UNIT:                Turke Point 84 DATE:                November 3 1997 COMPLETE BY:          L.
50-251 Turke Point 84 November 3 1997 L.@~6-6 REPORT MONTH October 1997 Unit 4 started the month of October shut down for a refueling which began on September 8, 1997.The unit began operation on October 13.The plant shut down as scheduled the next day for a turbine overspeed test returning to power the same day.The unit reached 100%power on October 18, and remained at full power for the remainder of the month.}}
TELEPHONE:            @~6-6 REPORT MONTH October 1997 Unit 4 started the month of October shut down for a refueling which began on September 8, 1997. The unit began operation on October 13. The plant shut down as scheduled the next day for a turbine overspeed test returning to power the same day. The unit reached 100% power on October 18, and remained at full power for the remainder of the month.}}

Latest revision as of 08:07, 22 October 2019

Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr
ML17354A721
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/31/1997
From: Hovey R, Mowrey C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-97-284, NUDOCS 9711280305
Download: ML17354A721 (11)


Text

CATEGORY 1

~O

~ ~

REGULAT . INFORMATION DISTRIBUTIO ~'YSTEM (RIDS)

ACCESSION NBR:9711280305 DOC.DATE: 97/10/31 NOTARIZED: NO DOCKET N FACXL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250

< 50-)51 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAMQi'UTHORAFFILIATION MOWREY,C.L. Florida Power 8 Light. Co.

HOVEY,R.J. Florida Power E Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Oct 1997 for Turkey Point, Units 3 &. 4.W/971114 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 . FXLE CENTE 1 1 1 NRR/DRPM/PECB 1 1 O /5B~/P 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

U N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

I

~ ~

I

NOY 14 fggp L-97-284 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the October 1997 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, R. J. Hovey Vice President Turkey Point Plant CLM Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 97ii280305 97i03i PDR ADOCK 05000250 R PDR llllllllllllllllllllllllllllllllllllllll an FPL Group company

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 250 UNIT Turkey Point ¹3 DATE Nov 05, 1997 COMPLETED BY C. L. Mowrey TELEPHONE (305) 246 - 6204 MONTH October, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 10/01/97 711 10/02/97 712 10/03/97 710 10/04/97 709 10/05/97 711 10/06/97 715 10/07/97 717 10/08/97 717 10/09/97 716 10/1 0/97 713 10/1 1/97 715 10/1 2/97 716 10/13/97 718 10/1 4/97 719 10/15/97 720

$ 0/1 6/97 719 10/1 7/97 714 10/18/97 713 10/19/97 716 10/20/97 722 10/21/97 723 10/22/97 720 10/23/97 719 10/24/97 718 10/25/97 716 10/26/97 711 10/27/97 709 10/28/97 711 10/29/97 715 10/30/97 713 10/31/97 711

DOCKET NO. 50-250 UNIT NAME TURKEY POINT UNIT 3 DATE November 3 1997 COMPLETED BY ~C. L. Me wre TELEPHONE REPORTING PERIOD October 1997 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 745.0 6202.3 151653.8
4. Number of Hours Generator Was On Line 745.0 6107.8 149494.9
5. Unit Reserve Shutdown Hours 0.0 0.0 121.8
6. Net Electrical Energy (MWH) 532721.0 4204068.0 95364274.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: k DATE: November 3 1997 COMPLETED BY: ~L. L. M TELEPHONE: 305 246-6204 REPORT MONTH October 1997 No. Date Type Duration Reasons Nethod & Corrective Action

[Hours) of Comments Reactor'ause Shutting Down N/A E - Forced Reason Nethod S - Scheduled A - Equipment Failure 1 - Manual B - Maintenance o Test 2 - Nanual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Train).ng 4 5 - Load Reduction License Examination 9 - Other {Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UN .'

N DATE: November 3 1997 COMPI.E E Y: C.

TE H HDNE::

REPORT MONTH October 1997 Unit 3 operated at essentially 100% power for the entire month of October.

AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO. 50 - 251 UNIT Turkey Point ¹4 DATE Nov 05, 1997 COMPLETED BY C. L. Mowrey TELEPHONE (305) 246 - 6204 MONTH October, 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 10/01/97 0 10/02/97 0 10/03/97 0 10I04I97 0 10/05/97 0 10/06/97 0 10/07/97 0 10/08/97 0 10/09/97 0 10/10/97 0 10/11/97 0 10/1 2/97 0 10/13/97 0 10/14/97 120 10/15/97 210 10/1 6/97 272 10/17/97 296 10/1 8/97 571 10/1 9/97 709 10/20/97 720 10/21I97 720 10/22/97 715 10/23/97 713 10/24/97 716 10/25/97 716 10/26/97 712 10/27/97 708 10/28/97 712 10/29/97 716 10/30/97 715 10/31/97 712

OPERATING DATA REPORT DOCKET NO. 50-251 UNIT NAME TURKEY POINT UNIT 4 DATE November 3 1997 COMPLETED BY ~C. L. Mowre TELEPHONE REPORTING PERIOD October 1997 (Month/Year)

1. Design Electrical Rating (MWe-Net) 720
2. Maximum Dependable Capacity (MWe-Net) 693 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Was Critical 465.5 6390.5 147843.5
4. Number of Hours Generator Was On Line 434.7 6346.5 143512.5
5. Unit Reserve Shutdown Hours 0.0 0.0 577.2
6. Net Electrical Energy (MWH) 256243.0 4383922.0 92433000.0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: TkPi N4 DATE: November 3 1997 COMPLETED BY C. L. Mowre TELEPHONE: 305 246-6204 REPORT MONTH October 1997 Ho. Date Duration Reason* Hethod & Corrective Action to (Hours) of Prevent Recurrence Reactor'ause Shutting Down 1053 9/8/97 309.0 Refueling outage 1055 10/14/97 1.3 Unit taken offline for turbine overspeed test F - Forced Reason Method S - Scheduled A - Equipment Failure 1 - )4anual 8 - Naintenance or Test 2 Hanual Scram C - Refueling 3 - Automatic Scram D - Regulatory restriction 4 Continued E - Operator Training I 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point 84 DATE: November 3 1997 COMPLETE BY: L.

TELEPHONE: @~6-6 REPORT MONTH October 1997 Unit 4 started the month of October shut down for a refueling which began on September 8, 1997. The unit began operation on October 13. The plant shut down as scheduled the next day for a turbine overspeed test returning to power the same day. The unit reached 100% power on October 18, and remained at full power for the remainder of the month.