ML17353A857: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 07/31/1996
| issue date = 07/31/1996
| title = Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr
| title = Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr
| author name = HOVEY R J, KNORR J E
| author name = Hovey R, Knorr J
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 08:37, 18 June 2019

Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr
ML17353A857
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/31/1996
From: Hovey R, Knorr J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-203, NUDOCS 9608200148
Download: ML17353A857 (15)


Text

REGULAT Y INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9608200148 DOC.DATE: 96/07/31 NOTARIZED:

NO DOCKET I FACIL:50-'250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 5t)~251.Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION KNORR,J.E.

Florida Power 6 Light Co.HOVEY,R.J.

Florida Power 6 Light Co.RECIP.NAME RECIPIENT A(FILIATION

SUBJECT:

Monthly operating repts for July 1996 for Turkey Point Plant Units 3 a 4.W/960813 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR L ENCL I SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD2-3 PD COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME CROTEAU,R COPIES LTTR ENCL 1 1 Q 4 0 R INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 1 1 1 1 ILE CE R NOAC 1 1 1 1 1 1 D E~N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL"'9 T

AUG g3 tggg L-96-203 10 CFR 550.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

Re: Turkev Point Units 3 and 4 Docket Nos.50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the July 1996 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, gj R.J.Hov y Vice President Turkey Point Plant JEK Attachments cc: S.D.Ebneter, Regional Administrator, Region II, USNRC T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9608200i48 96073i PDR ADOCK 05000250 R PDR, an FpL Group companY

AVERAGE DAIL IT POWER LEVEL MONIH Julu.1W6 DOCKET NO.50-250 UNIT Turkey Point 43 DATE Aug 06, 1996 COMPLETED BY J.E.Knorr TELEPHONE (305)246-6757 DAY 07/01/96 07/02/96 07/03/96 07/04/96 07/05/96 07/06/96 07/07/96 07/08/96 07/09/96 07/10/96 07/11/96 07/12/96 07/13/96 07/14/96 07/15/96 07/16/96 07/17/96 07/18/96 07/19/96 07/20/96 07/21/96 07/22/96 07/23/96 07/24/96 07/25/96 07/26/96 07/27/96 07/28/96 07/29/96 07/30/96 07/31/96 AVERAGE DAILY POWER LEVEL (MWe-Net)675 674 673 673 674 674 672 672 670 673 674 676 673 674 673 677 679 679 678 673 669 664 666 669 673 676 680 680 680 679 674 UNIT SHUTDOHNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

REPORT MONTH No.Da'te Duration (Hours)Reason Method or Shutting Down s Reactor'icensee Event Reports Spstqa Compon()nt Code Cause C Corrective Action to Prevent Recurrence N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Haintenance or Test C-Re f ue ling D-Regulatory restriction E-Operator Training 6 License Examination F-Administrative C-Operational Error (Explain)H-Other (Explain)Method 1-Nanual 2-Nanual Scram 3 Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)xhibit C-Instructions p or Preparation of Data Entrv Sheets Licensee Event Report (LER)File (NUREG-0161)

Exhibit 1-Same Source OP ING DATA REPORT DOCKET NO DATE PREPARED BY TELEPHONE 50-250 08/06/96 J.E.Knorr (305)246-6757 1.UNIT NAME: TURKEY POINT UNIT 3 2.REPORTING PERIOD: July, 1996 3.UCENSED THERMAL POWER (MWI): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET MWE): 693 6.MAXIMUM DEPENDABLE CAPACflY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACllY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACIIY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.RESONS FOR RESTRICTION.

IF ANY: 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRmCAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-UNE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILllY FACTOR 21.CAPACllY FACTOR (USING MDC NET)22.CAPACflY FACTOR (USING DER NET)23.UNff FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: None MONTHLY 7440 7440 OJ)744J)0.0 1632370 525945 501469 100.0 100.0 1012 973 0.0-YTD-5111.0 4940.9 0.0 4907.1 0.0 10542615 3442835 3282270 96.0 968)963 92.6 4.0 CUMULATIVE 207368.6 141846.7 844A 139802.9 121.8 291573634 93679820 88696166 67A 67A 642 61.7 10.5 25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO.UNIT'ATE COMPLETED BY: TELEPHONE:

.'K=25Q.REPORT MONTH Unit 3 operated at approximately 100%reactor power for the month of July 1996.

AVERAGE DAIL IT POWER LEVEL MONIH Julu.1W6 DOCKET NO.50-251 UNIT Turkey Point 44 DATE Aug 06, 1996 COMPLETED BY J.E.Knorr TELEPHONE (305)246-6757 DAY 07/01/96 07/02/96 07/03/96 07/04/96 07/05/96 07/06/96 07/07/96 07/08/96 07/09/96 07/10/96 07/11/96 07/12/96 07/13/96 07/14/96 07/15/96 07/16/96 07/17/96 07/18/96 07/19/96 07/20/96 07/21/96 07/22/96 07/23/96 07/24/96 07/25/96 07/26/96 07/27/96 07/28/96 07/29/96 07/30/96 07/31/96 AVERAGE DAILY POWER LEVEL (MWe-Net)664 658 659 660 658 657 654 653 651 653 656 530 0 0 185 611 663 666 664 661 657 654 655 657 661 663 665 663 658 656 654 UNff SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH JULY 1996 DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

50-251 Turkey Point P 4 Aug 06.1996 J.E.Knorr (305)2486757 No.Date Type 1 Duration (Hours)Reason 2 Method of Shutting Down 3 Ucensee Event Report 4 System Code 4 Component Code 5 Cause and Corrective Action to Prevent Recurrence:

00001014 07/12/96 N/A HH VALVEX Reduced power to repair valve on feedwater reheater 00001015 07/15/96 0.0 N/A HH INSTRU Feedwater level control 00001016 07/16/96 0.0 N/A HH PUMPXX Main feed pump seal repair 1.F Forced S Scheduled 2.A-Equipment Failure (Explain)B-Maintenance or test C-Refueling D-Regulatory Restriction E-Operator Training.LIcense Examination F-Administraitive G-Operational Error (Explain)H-Other (Explain)3.1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)4.Exibit G-Instructions for Preparation of Data Entry Sheets ucensee Event Report (LER)File (NUREG4161) 5.Exibit I-Same Source U

0 TING DATA REPORT DOCKET NO DATE PREPARED BY TELEPHONE 50-251 08/13/96 J.E.Knorr (305)546-6757 l.UNIT NAME: TURKEY POINT UNIT 4 2.REPORTING PERIOD: July, 1996 3.UCENSED THERMAL POWER (MUR): 2200 4.NAMEPlATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET MW9: 693 6.MAXIMUM DEPENDABLE CAPACIlY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACIIY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACI1Y RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE lAST REPORT.GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.RESONS FOR RESTRICTION, IF ANY: 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-UNE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENE RATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAllABIUIY FACTOR 21.CAPACIIY FACTOR (USING MDC NET)22.CAPACIlY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: None MONTHLY 744.0 7449 0.0 688.9 OJ)1480079 465202 442170 92.6 92.6 892 85.8 7A-YTD-5111.0 4294.1 OJ)4173.6 OJI 8889299 2856594 2716117 81.7 81.7 79.8 76.7 1.9 CUMUIATIVE 13871 2)137780.9 166.6 133566.7 5772 282562556 90377735 85601032 66A 66A 63.9 88.6 10.0 25.IF SHUTDOWN AT END OF REPORT PERIOD.ESTIMATED DATE OF STARTUP:

DOCKET NO.UNIT: DATE COMPLETE BY: TELEPHONE:

REPORT MONTH Unit 4 operated at approximately 100%reactor power until July 12.The unit was taken off line to repair a valve associated with the feedwater heaters.Feedwater heater level control repairs and work on a main feed pump seal was also completed.

The Unit returned to 100%power on July 16 and remained at approximately that level for the remainder of the month of July.

'I\1 0 j