ML17354A573: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 06/30/1997
| issue date = 06/30/1997
| title = Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2.W/970710 Ltr
| title = Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2.W/970710 Ltr
| author name = HOVEY R J, KNORR J E
| author name = Hovey R, Knorr J
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 08:25, 18 June 2019

Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2.W/970710 Ltr
ML17354A573
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/30/1997
From: Hovey R, Knorr J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-97-176, NUDOCS 9707150193
Download: ML17354A573 (16)


Text

CATEGORY j.REGULATO INFORMATION DISTRIBUTION TEM (RIDS)4 ACCE5lON NBR:9707150193 DOC.DATE: 97/06/30 NOTARIZED:

NO DOCKET g FACIL:5!);$

50.Turkey, Point Plant, Unit 3, Florida Power and Light C 05000250 50425l Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION KNORR,J.E.

Florida Power!;Light Co.HOVEY,R.J.

Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for June 1997 for Turkey Point, Units la 2.W/970710 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD2-3 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN2 1 1 1 1 1 1 OC/DBA/PAD COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1 1 CROTEAU,R COPIES LTTR ENCL 1 1 1 1 1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL'10 e" 0 I PI%II juL10 F99~L-97-176 10 CFR 550.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 eai e In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the June 1997 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, R.J.Hovey Vice President Turkey Point Plant Attachments cc: L.A.Reyes, Regional Administrator, Region II, USNRC T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant&MY'I 9707i50i93 970b30 PDR ADQCK 05000250 R PDR llllllllllllllllllllllllllllllllllllllll an FPL Group company

~~4'M AVERAGE DAIL NIT POWER LEVEL MONTH June, 1997 DAY AVERAGE 06/01/97 06/02/97 06/03/97 06/04/97 06/05/97 06/06/97 06/07/97 06/08/97 06/09/97 06/10/97 06/1'I/97 06/12/97 06/13/97 06/14/97 06/15/97 06/16/97 06/17/97 06/18/97 06/19/97 08/20/97 06/21/97 06/22/97 06/23/97 06/24/97 06/25/97 06/26/97 08/27/97 06/28/97 06/29/97 06/30/97 DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE DAILY POWER LEVEL (MWe Net)708 711 706 705 704 704 705 703 710 719 714 708 708 706 708 706 701 698 698 699 699 704 709 706 704 702 700 700 699 697 50-250 Turkey Point¹3 Jul 02, 1997 J.E.Knorr I305I 246-6757 DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-250 TURKE PO NT UNI I 2 1997 J E~Kgrr 3 24-REPORTING PERIOD Jy~e~)~9 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 hlQ4~I D-IV 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)720.0 3293.4 148744.9 720.0 3273.1 146624.2 0.0 0.0 121.8 507285.0 2211533.0 93371739.0 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

REPORT MONTH No.Date Duration (Hours)Reason'ethod of Shutting Down Reactor'icensee Event Report¹System Code'omponent Code'ause a corrective Action to Prevent Recurrence N/A F-Forced S-Scheduled Reason A-Equipment Failure 8-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training a License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG-0161)

Exhibit 1-Same Source RY F P R TI E P ERIE E DOCKET NO.~2'll T: DATE: Q~I2 1997 COMPLETED BY: J~K~nrr TELE EENE: REPORT MONTH~i 1997 Unit 3 operated at essentially 100%power for the month.

~'

AVERAGE DAILY IT POWER LEVEL MONTH June, 1997 DAY AVERAGE 06/01/97 06/02/97 06/03/97 06/04/97 06/05/97 06/06/97 06/07/97 06/08/97 06/09/97 06/10/97 06/11/97 06/12/97 06/13/97 06/14/97 06/15/97 06/16/97 06/17/97 06/18/97 06/19/97 06/20/97 06/21/97 06/22/97 06/23/97 06/24/97 06/25/97 06/26/97 06/27/97 06/28/97 06/29/97 06/30/97 DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE DAILY POWER LEVEL (MWe.Net)703 707 703 701 701 701 702 700 706 708 702 695 694 691 691 692 688 682 ,683 683 684 690 694 691 690 688 686 685 684 682 50-251 Turkey Point 44 Jui 02, 1997 J.E.Knorr (305)346-6757 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 955251 R EY OI T NIT 4 JgJyg~99 5 6-REPORTING PERIOD Jgge~9',Q (MonthNear) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)720.0 4269.0 720.0 4255.8 0.0 0.0 499376.0 3005654.0 145722.0 141421.8 577.2 91054732.0 I Ill UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED=BY:

TELEPHONE:

REPORT MONTH No.Date Duration (Hours)Reason'ethod of Shutting Down Reactor'icensee Event Report()System Code'omponent Codes Cause&Corrective Action to Prevent Recurrence N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG-0161)

Exhibit 1-Same Source 4

Y F PiR TI P RIF E DOCKET NO.UNIT: DATE: COMPLETE BY: TELEPHONE:

r'2Sl 2~Lkk~12 1997~EKn rr (302MJKZ REPORT MONTH~E~I Unit 4 operated at essentially 100%power for the month.

~~