ML17354B098: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 08/31/1998
| issue date = 08/31/1998
| title = Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr
| title = Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr
| author name = HOVEY R J, MOWREY C L
| author name = Hovey R, Mowrey C
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 08:17, 18 June 2019

Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr
ML17354B098
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/31/1998
From: Hovey R, Mowrey C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-98-236, NUDOCS 9809180180
Download: ML17354B098 (14)


Text

CATEGORY 1 REGULAT+INFORMATION DISTRIBUTIO1YSTEM (RIDS)~'ACCESSION NBR:9809180180 DOC.DATE: 98/08/31 NOTARIZED:

NO FACIL:50-250 Turkey Point Plant', Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION MOWREY,C.L.

Florida Power&Light Co.HOVEY,R.J.

Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET¹05000250 05000251

SUBJECT:

Monthly operating repts for Aug 1998 for Turkey Points, Units 3 5: 4.With 980915 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report'(per Tech Specs)NOTES: E RECIPIENT ID CODE/NAME PD2-3 PD COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME JABBOUR,K COPIES LTTR ENCL 1 1 INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 1 1 1 1 GN2 NOAC ENT 1 1 1 1 1 1 D'N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTETH TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 SEP 16 1998 L-98-236 10 CFR$50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and.4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the August 1998 Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.Very truly yours, R.J.Hovey Vice President Turkey Point Plant CLM Attachments cc: Regional Administrator, Region II, USNRC~Senior Resident Inspector, USNRC, Turkey Point Plant'ri809f 80f 80 98083f PDR ADOCK 05000250 R PDR-1 t" 4O".CI an FPL Group companY lf AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT: DATE: 50-250>>k~Se>tember 9 1998 COM S E 1l::C.P.0%::LJ-6 REPORT MONTH Au(ust l998 DAY 8/1/98 8/2/98 8/3/98 8/4/98 8/5/98 8/6/98 8/7/98 8/8/98 8/9/98 8/1 0/98 8/11/98 8/1 2/98 8/1 3/98 8/14/98 8/1 5/98 8/1 6/98 8/1 7/98 8/18/98 8/1 9/98 8/20/98 8/21/98 8/22/98 8/23/98 8/24/98 8/25/98 8/26/98 8/27/98 8/28/98 8/29/98 8/30/98 8/31/98 AVERAGE DAILY POWER LEVEL (Mwe-Net)690 688 685 686 688 692 698 692 691 691 688 686 686 687 690 687 688 692 693 687 694 697 694 695 695 ,692 690 691 693 696 694 DOCKET NO.UNIT NAME DATg COMPLETED BY TELEPHONE OPERATING DATA REPORT 50-250 TURKEY POINT UNIT 3 Se tember9 1998~C.L.Mowre (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 744.0 744.0 0.0 5750.5 158868.3 5741.8 156700.7 0.0 121.8 6.Net Electrical Energy (MWH)513990.0 4033765.0 100446321.0 StJiVIMARY OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETED BY TELEPI-IONE:

50-250 Se tember 9 1998 C.L.M wre 305 246-6204 REPORT MONTH August 1998 Unit 3 operated at essentially 100%for the entire month.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

REPORT MONTH Au"ust 1998 50-250 k k k Se tember 9 1998 C.L, Mowre 305 246-6204 No.Date Duration (Hours}Reasons Method of Shutting Down Reactor cause a corrective Action Conments N/A N/A N/A N/A N/A N/A F-Forced S-Scheduled Reason A-Equipment, Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training S License Examination F-Administrative G-Operational Error (Explain(-Other (Explain}Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain) AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-251 OM DATE:~Se tember 9 1998 OOMELE EO:~C.TELE IIEET::~6-REPORT MONTH August 1998 DAY 8/1/98 8/2/98 8/3/98 8/4/98 8/5/98 8/6/98 8/7/98 8/8/98 8/9/98 8/1 0/98 8/1 1/98 8/12/98 8/1 3/98 8/14/98 8/1 5/98 8/16/98 8/1 7/98 8/1 8/98 8/1 9/98 8/20/98 8/21/98 8/22/98 8/23/98 8/24/98 8/25/98 8/26/98 8/27/98 8/28/98 8/29/98 8/30/98 8/31/98 AVERAGE DAILY POWER LEVEL (MWe-Net)693 690 688 688 690 694 701 695 694 693 682 686 691 690 693 691 692 694 694 696 697 701 699 699 699 696 693 694 695 698 696

OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT UNIT 4 Se tember 9 1998~C.L.Mowre 305 246-6204 REPORTING PERIOD Auttuet 1998 (Month/Year) r 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)0.0 0.0 516052.0 4105632.0 MONTH-YTD-744.0 5831.0 744.0 5831.0 CUMULATIVE 155138.5 150807.5 577.2 97597269.0 S I SIJMMARY OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETE BY: TELEPHONE: 50-251 T~ki W Se tember 9 1998 C, L.Mowre REPORT MONTH August 1998 Unit 4 operated at essentially 100%for the entire month. UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY TELEPHONE: 50-251 k p u Se tember9 1998 L.305 246-6204 REPORT MONTH Au"ust 1993 tto.Date Duration{Hours)Reason Hethod of Shutting Down Reactors Cause r Corrective Action to Prevent Recurrence N/A N/A tf/A N/A tt/A tt/A F-Eorced S-Scheduled Reason A-Equipment Eai lure B-Haintenance or Test C-Refueling D-Regulatory restriction E-Operator Training r License Examination F-Administrative G-Operat,ional Error (Explain)H-Other (Explain)Method 1-Hanual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other<Explain) I}}