| OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETED BY: TELEPHONE'0-251 ur e oxn anua orr REPORT MONTH DECEMBER 1993 Unit 4 began the montn of December at 100~-power and retained that status through the end of the month. | | OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETED BY: TELEPHONE'0-251 ur e oxn anua orr REPORT MONTH DECEMBER 1993 Unit 4 began the montn of December at 100~-power and retained that status through the end of the month. |
| J.0 1~i g OPERaflNG STA'rUS OPERATING DATA REPORT DOCKET NO 50-251 DATE 1/7/94 COMPLETED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNI 1'AME: TURKEY POINT UNIT 4 2, REf'ORTING PERIOD: DECEMBER 1993 3.LICENSED THERMAL POWER (MWT): 2200 NAMEPLATE RATING (GROSS MwE): 760 5.DESIGN ELECTRICAL RATING (NET MWF.): 693 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RAl'INGS (ITEMS NUMBER 3 THROUGH 7)StNCE LAST REPORT.GIVE REASONS: 9.POwER LEVFL TO wHICH RESTRICTED. | | J.0 1~i g OPERaflNG STA'rUS OPERATING DATA REPORT DOCKET NO 50-251 DATE 1/7/94 COMPLETED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNI 1'AME: TURKEY POINT UNIT 4 2, REf'ORTING PERIOD: DECEMBER 1993 3.LICENSED THERMAL POWER (MWT): 2200 NAMEPLATE RATING (GROSS MwE): 760 5.DESIGN ELECTRICAL RATING (NET MWF.): 693 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RAl'INGS (ITEMS NUMBER 3 THROUGH 7)StNCE LAST REPORT.GIVE REASONS: 9.POwER LEVFL TO wHICH RESTRICTED. |
| IF aNY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: o MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 'e 2.NUMBER OF HOURS REACTOR WAS CRIT'AL 13.REAC1'OR RESERVE SHUTDOWN HOURS 14.HOURS GFNERATOR ON-LINE 15.UN11 RESERVE SHUTDOWN HOURS 16 GROSS iHERMat.ENERGY GENERa'rFD (MwH)17 GROSS I:LL'CTRICAL ENERGY GENERATED (MWH)18.tetr El.ECTRICAL ENERGY GENERATEO (MWH)19.UNll SERVICE FaCTOR 20.UNIT AVAILABlt,lTY FACTOR 21.capacil'Y Factok (osING MDG NET)22.caknCI1Y FAclDR (UsING DER NET)23.UNtl FORCED OitraGE RaTE 24.SHUIDOWNS SCHt".RULED OVER NEXT 6 MONTHS NONE 744 744.0 0.0 744.0 0.0 1637791 542820 518449 100.0 100.0 104.6 100.6 0.0 8760 7441.7 0.0 7279.7 0.0 15485620 4995000 4746291 83.1 83.1 81.4 78.2 2.0 178469.0 117280.3 166.6 113325.0 577.3 239059955 76353970 72235232 63.5 63.8 61.8 58.4 11.4 25.1F SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | | IF aNY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: o MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 'e 2.NUMBER OF HOURS REACTOR WAS CRIT'AL 13.REAC1'OR RESERVE SHUTDOWN HOURS 14.HOURS GFNERATOR ON-LINE 15.UN11 RESERVE SHUTDOWN HOURS 16 GROSS iHERMat.ENERGY GENERa'rFD (MwH)17 GROSS I:LL'CTRICAL ENERGY GENERATED (MWH)18.tetr El.ECTRICAL ENERGY GENERATEO (MWH)19.UNll SERVICE FaCTOR 20.UNIT AVAILABlt,lTY FACTOR 21.capacil'Y Factok (osING MDG NET)22.caknCI1Y FAclDR (UsING DER NET)23.UNtl FORCED OitraGE RaTE 24.SHUIDOWNS SCHt".RULED OVER NEXT 6 MONTHS NONE 744 744.0 0.0 744.0 0.0 1637791 542820 518449 100.0 100.0 104.6 100.6 0.0 8760 7441.7 0.0 7279.7 0.0 15485620 4995000 4746291 83.1 83.1 81.4 78.2 2.0 178469.0 117280.3 166.6 113325.0 577.3 239059955 76353970 72235232 63.5 63.8 61.8 58.4 11.4 25.1F SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: |
| (~I}} | | (~I}} |
|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr ML17354A6221997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Turkey Point. W/970909 Ltr ML17354A6051997-07-31031 July 1997 Monthly Operating Repts for July 1997 for TPS.W/970806 Ltr ML17354A5731997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2.W/970710 Ltr ML17354A5261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Turkey Point Units 3 & 4.W/970612 Ltr ML17354A5071997-04-30030 April 1997 Monthly Operating Repts for April 1997 for TPS.W/970512 Ltr ML17354A4631997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Turkey Point Units 3 & 4.W/970408 Ltr ML17354A4351997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Turkey Point,Units 3 & 4.W/970311 Ltr ML17354A4131997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Turkey Point,Units 3 & 4.W/970213 Ltr ML17354A3851996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr ML17354A3631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Turkey Point Units 3 & 4.W/961211 Ltr ML17354A3461996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Turkey Point,Units 1 & 2.W/961113 Ltr ML17354A2981996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4.W/961014 Ltr ML17353A8831996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Turkey Point Units 3 & 4.W/960912 Ltr ML17353A8571996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr ML17353A7731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Turkey Point Units 3 & 4.W/960710 Ltr ML17353A7301996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Turkey Point Units 3 & 4.W/960612 Ltr ML17353A6971996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Turkey Point Units 3 & 4.W/960513 Ltr ML17353A6391996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Turkey Point Units 1 & 2.W/960415 Ltr ML17353A5971996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr ML17353A5601996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Turkey Points 3 & 4.W/960213 Ltr ML17353A5361995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Turkey Point Units 3 & 4.W/960112 Ltr ML17353A4831995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Turkey Point Units 3 & 4.W/undated Ltr ML17353A4441995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Turkey Point Units 3 & 4.W/951115 Ltr ML17353A4111995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Turkey Point Units 3 & 4.W/951012 Ltr ML17353A3541995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 4.W/950912 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
Text
Y E~REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS): CQSU4N4 FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C , AUTH.NAME AUTHOR AFFILIATION KNORR,J.E.
Florida Power 6 Light Co.PLUNKETT,T.F.
Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000250 05000251
SUBJECT:
Monthly o e'ng repts for Dec 1993 for Turkey Point Units 3&4.113 tr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: D RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD/DOA N DORS 0 EG WIXR 01 EXTERNAL EGGG BRYCE i J~H NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME RAGHAVAN,L AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:
D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11
..Box 029100, Miami, FL, 33102-9100 Jp,N l3 19M L-94-008 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
RE: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9'.5, and the guidance of NUREG-0020, attached are the December 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very Truly Yours, T.F.Plunkett Vice President Turkey Point Nuclear TFP/JEK/jk attachments cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant s~.j.OO 8 pg 9401240146 931231 PDR ADOCK 05000250'.R'DR an PPL Group company ZEND//(
F gO~$+>~p'a!eI AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-250 llKRH POINT 3 MONTH DECEMBER 1993 AVERAGE DAILY POWER LEVEL (MWe-Net)12/01/93 12/02/93 12/03/93 12/04/93 12/05/93 12/06/93 12/07/93 12/08/93 12/09/93 12/10/93 12/11/93 12/12/93 12/13/93 12/14/93 12/15/93 12/16/93 12/17/93 12/18/93 12/19/93 12/20/93 12/21/93 12/22/93 12/23/93 12/24/93 12/25/93 12/26/93 3.2/27/93 12/28/93 12/29/93 12/30/93 12/31/93 701 700 699 695 690 692 697 696 693 692 690 703 700 698 697 706 700 704 698 693 692 695 693 694 698 703 705 702 694 693 693 J
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNlT NAME: 50-250 DATE: anuar COMPLETED BY:..norr TELEPHONE REPORT MONTH DECEMBER 1993 No Date Type'uration (Hours)Reasons Method of Shutting Down Reactors Licensee Event Reportt Spstep Comgnept Cause 4 Corrective Action to Prevent Recurrence NA N/A NIA 0.0 N/A N/A N/A N/A NIA N/A F-Forced s-scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Traininc 6 License Examination F-Administrative G-Operational Error (Explain)H-other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entrv Sheets Licensee Event Report (LER)File (NUREG-0161)
Exhibit 1-same Source aM V I', II 1 c'if,'yt'f ,p'~N'.'<1 L a I<c'1 e<j C P OPERATING DATA REPORT OPERAT I NG STATUS DOCKET NO 50-250 DATE 1/7/94 COMPLETED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 3 REf>OH f ING PERIOD: DECEMBER 1993 L I CLff SED Tt IERMAL POWER (MWT): 2200 4.NAMf:PLATL ttaIING (GROSS MWE): 760 b.DLSl(AN ELECTRI(.AL RATING (NET MWL): 693 6 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8 It" CffANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE t AST REPORT~GIVE REASONS: 9 POWt.R LEVEL TO WHICH RESTRICTED.
IF ANY (NET MWE)'IO HLASONS FOR HFSTRICfIONS
~IF ANY>>MONTHLY-YTD-CUMULATIVE 1 1.~1(, HS Itt REPORf PERIOD: 12.NUMBER OF ttOURS REACTOR WAS CRITICAL 13.fct-af lOR RFSERVE SHUTDOWN HOURS 14.tfOt)HS GENERATOR ON-LING 15, uutl fEEsLRvh SrfufDowN H0URs 16 GfCO 5 IftERMA'tEERGY GENERAfEO (MWH)ff.Gffo'El ECTRICAL FNCRGY GENERATED (MWH)'tl.NF,I LLFCTRICAI.
ENERGY GENERATED (MWH)IU.UNII EENVICE FACTOR 20.UNIT AVAILAUII ITY FACTOR 21.caPAcll Y I aclOR (UsING Muc NET)2>>".CAPAC11Y FAC1'OH (USING DER NET)23.utEIT I-ORCEO Outa(.E RATE 24.SffulDOWNS SCHBt)tfLFD OVER NEXT 6 MONTHS ,CYCLE 14 REFUELING OU1AGE SCtfEt)ul.ED 4/94 744 744.0 0.0 744.0 0.0 1637596 543065 518542 100.0 100.0 104.6 100.6 0.0 8760 8501.0 0.0 8422.6 0.0 1823291'I 5939690 5657345 96.1 96.1 97.0 93.2 1.8 184737.6 121260.3 844.4 1 19533.4 121.8 248139838 79581816 75269505 64.7 64.8 62.2 58.8 11.8 25=I f SttUI'OWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP f V I
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE COMPLETED BY TELEPHONE:
50-250 ur e own anuar orr REPORT MONTH DECEMBER 1993 Unit 3 began the month of December at 100%power and retained that status through the end of the month.
I E AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-251 TURTKP POINT 4 ANUA E.N R MONTH DECEMBER 1993 AVERAGE DAILY POWER LEVEL (MWe-Net)12/01/93 699 12/02/93 699 12/03/93 697 12/04/93 695 12/05/93 690 12/06/93 691 12/07/93 695 12/08/93 695 12/09/93 694 12/10/93 694 12/11/92 693 12/12/93 701 12/13/93 704 12/14/93 701 12/15/93 698 12/16/93 701 12/17/93 704 12/18/93 703 12/19/93 698 12/20/93 694 12/21/93 691 12/22/93 694 12/23/93 693 12/24/93 695 12/25/93 698 12/26/93 704 12/27/93 704 12/28/93 701 12/29/93 695 12/30/93 690 12/31/93 693
'E F IV 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
50-251 REPORT MONTH DECEMBER 1993 No.Date Type~Duration (Hours)Reason*Method of Shutting Down , Reactors Licensee Event Reports Sgs t e(m Componept Code Cause 4 Corrective Action to Prevent Recurrence N/A N/A N/A 0.0 N/A N/A N/A N/A N/A N/A F-Forced s-scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Sczam 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions foz Preparation of Data EntrV Sheets Licensee Event Report (LER)File (NUREG-0161)
Exhibit 1-same source 1"l~~I II<<~-~I'1
~C~~,
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETED BY: TELEPHONE'0-251 ur e oxn anua orr REPORT MONTH DECEMBER 1993 Unit 4 began the montn of December at 100~-power and retained that status through the end of the month.
J.0 1~i g OPERaflNG STA'rUS OPERATING DATA REPORT DOCKET NO 50-251 DATE 1/7/94 COMPLETED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNI 1'AME: TURKEY POINT UNIT 4 2, REf'ORTING PERIOD: DECEMBER 1993 3.LICENSED THERMAL POWER (MWT): 2200 NAMEPLATE RATING (GROSS MwE): 760 5.DESIGN ELECTRICAL RATING (NET MWF.): 693 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RAl'INGS (ITEMS NUMBER 3 THROUGH 7)StNCE LAST REPORT.GIVE REASONS: 9.POwER LEVFL TO wHICH RESTRICTED.
IF aNY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: o MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 'e 2.NUMBER OF HOURS REACTOR WAS CRIT'AL 13.REAC1'OR RESERVE SHUTDOWN HOURS 14.HOURS GFNERATOR ON-LINE 15.UN11 RESERVE SHUTDOWN HOURS 16 GROSS iHERMat.ENERGY GENERa'rFD (MwH)17 GROSS I:LL'CTRICAL ENERGY GENERATED (MWH)18.tetr El.ECTRICAL ENERGY GENERATEO (MWH)19.UNll SERVICE FaCTOR 20.UNIT AVAILABlt,lTY FACTOR 21.capacil'Y Factok (osING MDG NET)22.caknCI1Y FAclDR (UsING DER NET)23.UNtl FORCED OitraGE RaTE 24.SHUIDOWNS SCHt".RULED OVER NEXT 6 MONTHS NONE 744 744.0 0.0 744.0 0.0 1637791 542820 518449 100.0 100.0 104.6 100.6 0.0 8760 7441.7 0.0 7279.7 0.0 15485620 4995000 4746291 83.1 83.1 81.4 78.2 2.0 178469.0 117280.3 166.6 113325.0 577.3 239059955 76353970 72235232 63.5 63.8 61.8 58.4 11.4 25.1F SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
(~I