W3P87-1628, Forwards Functional Design Spec for SPDS Enhancement Program. Sys Implementation Will Commence on 870708 & Be Operational by 880801.Validation Testing Performed on Simulator Will Be Completed by 881231

From kanterella
Jump to navigation Jump to search
Forwards Functional Design Spec for SPDS Enhancement Program. Sys Implementation Will Commence on 870708 & Be Operational by 880801.Validation Testing Performed on Simulator Will Be Completed by 881231
ML20235G600
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/08/1987
From: Cook K
LOUISIANA POWER & LIGHT CO., NEW ORLEANS PUBLIC SERVICE CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20235G604 List:
References
W3P87-1628, NUDOCS 8707140312
Download: ML20235G600 (2)


Text

_ _-- _ _ _ .

l..OUISIANA POWER E LIGHT COMPANY e Pest DH,ce Box 6308 = New OHeans, toubiena 70174 m ac_,,

gg NEW ORLEANS PUBLIC SERVICE INC.

  • Post Othce Eck 60340 a New Odoans. Louisiana 70160 1

July 8, 1987 W3P87-1628 A4.05 QA U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

SUBJECT:

Waterford SES Unit 3 Docket No. 50-382 Safety Parameter Display System (SPDS)

REFERENCE:

Letter dated December 2, 1985 from G.W. Knighton to R.S. Leddick j i

Gentlemen:

Enclosed please find the Functional Design Specification for the Waterford 3 SPDS Enhancement Program. As stipulated in the Specification, the enhanced design will be installed, functionally tested and operational with approved i

procedures by August 1, 1988. Validation testing for the system, which is l to be performed on the Waterford 3 simulator, will be completed by December

! 31, 1988. Effective this date, implementation of the system will commence.

Included in an Attachment to the Specification are Parameter Data Sheets.

l It r.hould be noted that although every effort has been made to ensure the i accuracy of tne information containea in tnese data sheets, changes to the

data sheets will be incorporated if the noted changes will improve the  ;

system.

Implementation of the SPDS Enhancement Program will result in changes to .

the SPDS software and a minor modification to the hardware (console only). I Since the SPDS is a software implementation on the Plant Monitoring i Computer, which is a non-safety related system, the system enhancements i will hr.ve no adverse impact on the safe operation of the existing instru-l mentation and equipment. As such, the SPDS Enhancement Program does not  !

create an unreviewed safety question nor does it require a Technical

. Specification change.  ;

\ l l 8707140312 070708 i DR ADOCK0500g2 NS41285 )

"AN EGlJAL OPPORTilNITY EMPLOYER" )

L-- -__

Page 2 W3P87-1628 -

July 8, 1987 We feel that these enhancements address the noted concerns stipulated 'in the Reference and satisfy the requirements of NUREG-0737, Supplement 1.

Should you have any questions or comments on this matter, please feel free to contact Tim Gaudet at (504) 595-2635.

Yours very truly, K.W. Cook Nuclear Safety &

p Reguir, cry Affairs Manager KWC/TJG/smb Enclosure cc: E.L. Blake, W.M. Stevenson, J.A. Calvo, J.H. Wilson, L. Beltracchi, G. West, Jr. , R.D. Martin, NRC Resident Inspector's Office (W3) l l