Text
-
I
<~
f Entergy Operation 3,Inc.
0 P.O. Box B t
l' Killona. LA 70066 Tel 504 739 6242 l
Early C. Ewing. lli e Sa ety & Regulatory Affairs W3F1-99-0097 A4.05 PR June 9,1999 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Emergency Plan implementing Procedure Gentlemen:
In accordance with Appendix E of 10CFR50 and 10CFR50.54(b)(5), Entergy is submitting the revised Waterford 3 Emergency Plan Implementing Procedure. This revision was reviewed in accordance with 10CFR50.54(q) requirements and was determined not to decrease the effectiveness of the emergency plan.
Included in this submittal is the following procedure:
1.
EP-001-010 (Revision 21), Unusual Event. This procedure revision included administrative and programmatic changes. These changes will be incorporated into the annual revision of the Emergency Plan.
\\
)
p(
9906140313 990609 ^
PDR ADOCK 05000382 F
'ifbob7 l
L.
Emergency Plan Implementing Procedure W3F1-99-0097
)
Page 2
- June 9,1999 Should you have any questions concerning this procedure, please contact J.J. Lewis, Emergency Planning Manager, at (504) 739-6624.
Very truly yours, 1
fr h SCbO f*
E.C. Ewing
- Director, Nuclear Safety & Regulatory Affairs ECE/GCS/ssf Attachment cc:
(w/ Attachment)
E.W. Merschoff, NRC Region IV (2 copies)
(w/o Attachment)
C.P. Patel, NRC-NRR P. Elkmann, NRC Region IV J. Smith N.S. Reynolds NRC Resident inspectors Office
ATTACHMENT TO W3F1-99-0097 EP-001-010, REVISION 21 Unusual Event
.(
t