ML20213A282

From kanterella
Jump to navigation Jump to search
Requests That Util Provide Latest Revs to Listed Addl Info by 870612 in Order to Prepare & Perform Scheduled Insp on 870706-10 of Util Compliance w/10CFR50,App R Applicable Sections & Associated Fire Protection Features
ML20213A282
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 04/17/1987
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
GL-86-10, NUDOCS 8704270480
Download: ML20213A282 (3)


Text

. _ . _ _ _ _ _ _

t APR 171987 Docket No. 50-254 Docket No. 50-265 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

SUBJECT:

INSPECTION OF COMPLIANCE WITH.10 CFR 50, APPENDIX R, APPLICABLE SECTIONS AND ASSOCIATED FIRE PROTECTION FEATURES - QUAD CITIES, UNITS 1 AND 2, DOCKET N0. 50-254 and N0. 50-265-This letter is to confirm the dates of July 6-10, 1987, for the special inspection of Quad Cities, which were established during the telephone conversation of April 16 1987, between Ted Pettit_of your staff, and Jeff Holmes of this office.

The purpose of this. inspection is to evaluate the Quad Cities facility, Units 1 and 2, for compliance with the applicable sections of Appendix R to 10 CFR 50. In addition, this inspection will review the. implementation of the Fire Protection Program. This will be a team-type inspection composed of personnel from the NRC Region III office, our contractors (Brookhaven National -

Laboratory), and based on their availability, personnel from NRC's Headquarter's offices.

In order for us to properly prepare and perform this type of comprehensive and complex inspection, we request that you provide this office with the latest revision to the following additional information by June 12, 1987:

1. Piping and instrumentation (flow) diagrams for hot standby (shutdown) and cold shutdown systems, alternative or dedicated shutdown systems and the reactor coolant pump oil collection system.
2. Plant layout and equipment location drawings which identify the physical plant locations of hot. standby (shutdown) and cold shutdown equipment.  :
3. Clearly marked-up electrical-raceway drawings which identify the cable routing of power and control circuits for those plant systems necessary to achieve and maintain hot standby (shutdown). Drawings should also identify exactly where cable wrapping has been installed. Also, identify the equipment-and cabling which is redundant or alternative to the cabling that has been wrapped.

I h

k a

M'

APR 17 l'987 Commonwealth Edison Company 2

4. Control electrical distribution diagrams, control schemes for shutdown l components which are being controlled from the remote shutdown panel,-

and single line AC and DC power.

5. Plant layout drawings which identify fire area delineation and fire protection equipment locations.
6. Marked-up plant layout drawings which identify the locations of emergency lighting units.
7. Associated drawings which depict the physical and seismic design of-reactor coolant pump oil collection system.
8. Associated circuit analysis including drawings of alternate shutdown panel, circuits and fuse coordination.
9. Plant Operating Procedures which describe normal hot and cold shutdown from inside the control room, emergency hot and cold shutdown from emergency control stations outside and independent of the control room, and shutdown operations which utilize alternative or dedicated shutdown capability and natural circulation.
10. Fire damage control and repair procedures for cold shutdown systems.
11. Safe Shutdown Analysis (SSA) and a current Fire Hazards Analysis (FHA).

The SSA and FHA need to list safe shutdcwn equipment and cabling in each area.

If you have already submitted to the NRC documents providing portions of the information requested, please identify those documents in your response to this letter.

Further, to assist in our inspection effort, please advise us in summary format of any deviation (s)/ exemption (s) requested and granted or requested and pending related to the applicable sections of 10 CFR 50, Appendix R.

In addition to the information requested above, copies of any other analyses and/or evaluations which demonstrate compliance to the applicable sections of Appendix R, including any analysis written to satisfy Generic Letter 86-10, should be available on site for review during this inspection. Appropriate i personnel, knowledgeable with respect to those plant systems required for ,

safe shutdown and their capabilities, should be available at the site during this inspection. Following the entrance meeting, we would appreciate a plant familiarization tour relative to areas containing safe shutdown equipment. Also, l we request that your staff make the necessary arrangements to permit team members ready access to the radiologically controlled areas of the plant if necessary.

m

Commonwealth Edison Company 3 APR 171987 Your cooperation with us during this inspection will be appreciated. Should you have any questions concerning this letter, please contact J. Holmes at 312-790-5594.

Sincerely, Original Signed by J. J. Harrison J. J. Harrison, Ch'fef Engineering Branch cc: D. L'. Farrar, Director of Nuclear Licensing R. L. Bax, Plant Manager DCS/RSB(RIDS)

Licensing Fee Management Branch T. Ross, PM, NRR Resident Inspector, RIII Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division C .

94 Y Folmes/jk Ring Gardner Harrison 04/17/87 04/(1/87 04/r1/87 04/t1/87 m