ML20206U844

From kanterella
Jump to navigation Jump to search
Ack Receipt of Proposed Schedule for Conversion of Reactor from High Enriched U to Low Enriched U
ML20206U844
Person / Time
Site: University of Virginia
Issue date: 04/20/1987
From: Berkow H
Office of Nuclear Reactor Regulation
To: Mulder R
VIRGINIA, UNIV. OF, CHARLOTTESVILLE, VA
References
NUDOCS 8704230586
Download: ML20206U844 (3)


Text

_

ApR 2 0 1987 Docket No. 50-62 Dr. Robert U. Mulder, Director Nuclear Reactor Facility University of Virginia Department of Nuclear Engineering and Engineering Physics Charlottesville, Virginia 22901

Dear Dr. Mulder:

SUBJECT:

ACKNOWLEDGMENT OF HEU/ LEU CONVERSION SCHEDULE FOR THE UVAR RESEARCH REACTOR We acknowledge receipt of your proposed schedule for conversion of your reactor from HEU to LEU, which ou submitted in accordance with the requirementsof10CFR50.64(c)y(2)(1). When received, we will review your application as expeditiously as possible.

i We request that you inform our Project Manager for your facility, Alexander Adams, Jr., of any changes or updates to your proposed schedule. Mr. Adams

. can be contacted at (301) 492-8207.

l 1 Sincerely, Orfcinal Signed Byi Herbert N. Berkow, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION:

i Docket File ,)

local PDR NRC PDR EHylton AAdams PDSNP Reading l HBerkow l a :cw 04/ /87 04/6/87 04/ec/87 42 86 870420 p CK 05000062 PDR

~ ~

jv# "4 UNITED STATES e

j' .1 NUCLEAR REGULATORY COMMISSION WASHINGTON,0. C. 20555

  • g,

/ APR 2 01987 Docket No. 50-62 e

Dr. Robert U. Mulder, Director Nuclear Reactor Facility University of Virginia Department of Nuclear Engineering and Engineering Physics Charlottesville, Virginia 22901

Dear Dr. Mulder:

SUBJECT:

ACKNOWLEDGMENT OF HEU/ LEU CONVERSION SCHEDULE FOR THE UVAR RESEARCH PEACTOR ,

We acknowledge receipt of your proposed schedule for conversion of your reactor from HEU to LEU, which you submitted in accordance with the requirements of 10 CFR 50.64(c)(2)(1). When received, we will review your application as expeditiously as possible.

We request that you inform our Project Manager for your facility, Alexander Adams, Jr., of any c'.anges or updates to your proposed schedule. Mr. Adams can be contacted at (301) 492-8207.

Sincerely, 1

M gL erbert N. Berkow, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects Office of Nuclear Reactor Regulation cc: See next page l

University of Virginia Docket Nos. 50-62/396 o cc: Mr. J. B. Jackson .

Consnonwealth of Virginia Council on the Environment a

903 Ninth Street Office Bldg.

Richmond, Virginia 23219 Attorney General 1101 East Broad Street Richmond, Virginia 23219 Coneonwcalth of Virginia Council on the Environment 903 Ninth Street Office Bldg.

Richmond, Virginia 23219 Mr. Preston Farrar Nuclear Reactor Facility University of Virginia School of Engineering and Applied Science

( Charlottesville, Virginia 22901

?

I h

i

)

l 4

i

't l

l