ML20198C835
| ML20198C835 | |
| Person / Time | |
|---|---|
| Site: | University of Virginia |
| Issue date: | 10/30/1998 |
| From: | Mulder R VIRGINIA, UNIV. OF, CHARLOTTESVILLE, VA |
| To: | Kane W NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| NUDOCS 9812220192 | |
| Download: ML20198C835 (1) | |
Text
d 5 0 ooo6 R69 of SCH00L OF ENGINEERING $
& APPUED SCIENCE DEPARTMENTOFMECILANICAL, AEROSPACE October 30,1998 ANDNUCLEAR ENGINEERING L aa '75-')
Mr. William F. Kane
$'n[
'"ha / / LID Director Spent Fuel Projects Division CharlouesviHe, VA 22903-2442 US N.R.C. - NMSS 804/924-7421 FAX: 804/982-2037 Mail Stop G-6 F18 M M82. HEAR Washington D.C. 20555
-h g Re: Spent Nuclear Fuel Shipment Advance Notification from the University of Virginia Reactor Facility, Docket No. 50-62, License R-66.
Dear Kane:
)
Please consider this as the advance notification required by 10CFR73 of our spent nuclear research reactor fuel shipment "R66-98-1" from the U.Va. Nuclear Reactor Facility to Savannah River, S.C.. Details concerning this shipment are in attachment. We hereby confirm that armed
. escorts have been arranged for the Salem /Roanoke VA, Charlotte NC and Columbia SC portions of the travel route, as required. Also, the appropriate governors or designees of the states
- through which the shipment is to be made have been notified.
We wish to thank Ms. Susan F. Shankman and Mr. John Cook of the Spent Fuel Project Office t
for their kind assistance.
Please be reminded that Federal Regulations require all shipment schedule information to be kept confidential until at least 10 days following the completion of the shipment.
l i
I S' ce
')
D kl l&
ci Q of %ymntie-Commonwealth of Virginia Dr.. Robert U. Mulder, Director I hereby cwtify thd the attached document is a true and U.Va. Nuclar Reactor Facility exact copy of a
[
- presented before 19N f
ber
,M IdahirF$6dider.
3
. utt Ad 1
i un w<
9812220192 981030 My commission expires 3 O
PDR A00CK 05000062 t
2 1
p PDR h
- (
9. p:> w,
u
.