ML20135C271

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-062/96-02 on 961105-06.No Violations Noted
ML20135C271
Person / Time
Site: University of Virginia
Issue date: 11/26/1996
From: Mcalpine E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mulder R
VIRGINIA, UNIV. OF, CHARLOTTESVILLE, VA
Shared Package
ML20135C273 List:
References
NUDOCS 9612060258
Download: ML20135C271 (2)


See also: IR 05000062/1996002

Text

'

.

November 26, 1996

,

University of Virginia

ATTN: Dr. R. U. Mulder, Director

Reactor Facility

Charlottesville, VA 22903-2442

SUBJECT: NRC INSPECTION REPORT NO. 50-62/96 02

Dear Dr. Mulder: l

This refers to the inspection conducted on November 5 6, 1996, at the University

of Virginia Reactor Facility. The purpose of the. inspection was to determine

whether activities authorized by the license were conducted safely and in

accordance with NRC requirements. At the conclusion of the inspection, the

findings were discussec with those members of your staff identified in the

enclosed report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, violations or deviations were not identified.

In accordance with 10 CFR 2.790. of the NRC's " Rules of Practice," a copy of this

letter and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us. l

Sincerely,

/s/

Edward J. McAlpine, Chief

Fuel Facilities Branch

Division of Nuclear Materials Safety

Docket Nos. 50 62, 50 396

License Nos. R 66, R-123

Enclosure: NRC Inspection Report

'

cc w/ encl: (See page 2)

I

9612060258 961126

PDR ADOCK 05000062

PM f

-

G

_dd/

.. - _ ._ - _-. .. ._.- - - . . - . _ - . - . . .. .-_ . - . . . _ _ . -. - .

'

,

I

UVA 2

I cc w/ encl: i

2

Dr. Ronald D. Flack, Jr., Chairman '

Department of Mechanical, Aerospace

and Nuclear Engineering

l University of Virginia

Charlottesville, VA 22903 2442

Dr. William G. Vernetson

Director of Nuclear Facilities

Department of Nuclear Engineering

Sciences

!

University of Florida

202 Nuclear Sciences Center i

i Gainesville, FL 32611 l

.

Dr. Ratib A. Karam, Director

^

Neely Nuclear Research Center

Georgia Institute of Technology

- 900 Atlantic Drive, NW

Atlanta, GA 30332

'

Mr. Pedro B. Perez

j Associate Director

i Nuclear Reactor Program

! North Carolina State University

a P. O. Box 7909

i Raleigh, NC 27695-7909

i

Leslie P. Foldesi. Director

i Bureau of Radiological Health

Division of Health Hazards Control

-

109 Governor Street, Room 916

4

Richmond, VA 23219

4

Distribution w/ encl:

i A. Adams, NRR '

J. Caldwell, NRR

. C. Bassett, RII

i E. McAlpine, RII

C. Pederson, RIII

B. Hurray, RIV

F. Wenslawski, RIV

PUBLIC

OFFICE Rft DNMS RIl DNMS

SIGNATURE

NAME Mo ,, CBassett

DATE tj 96 11/2L / 96 11 / 1 96 11 / / 96 11 / / 96 11 / / 96

COPY? M NO [_Eh NO YES NO YES NO YES NO YES NO

OFFICIA@ORD GOPY DOGUMENT NAME: 1.\FFBlhREPOR isiUVA9602.WJ1

--

.- -- -