ML20135C271
| ML20135C271 | |
| Person / Time | |
|---|---|
| Site: | University of Virginia |
| Issue date: | 11/26/1996 |
| From: | Mcalpine E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mulder R VIRGINIA, UNIV. OF, CHARLOTTESVILLE, VA |
| Shared Package | |
| ML20135C273 | List: |
| References | |
| NUDOCS 9612060258 | |
| Download: ML20135C271 (2) | |
See also: IR 05000062/1996002
Text
'
.
November 26, 1996
,
University of Virginia
ATTN: Dr. R. U. Mulder, Director
Reactor Facility
Charlottesville, VA 22903-2442
SUBJECT:
NRC INSPECTION REPORT NO. 50-62/96 02
Dear Dr. Mulder:
This refers to the inspection conducted on November 5 6, 1996, at the University
of Virginia Reactor Facility.
The purpose of the. inspection was to determine
whether activities authorized by the license were conducted safely and in
accordance with NRC requirements.
At the conclusion of the inspection, the
findings were discussec with those members of your staff identified in the
enclosed report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, violations or deviations were not identified.
In accordance with 10 CFR 2.790. of the NRC's " Rules of Practice," a copy of this
letter and its enclosure will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
/s/
Edward J. McAlpine, Chief
Fuel Facilities Branch
Division of Nuclear Materials Safety
Docket Nos. 50 62, 50 396
License Nos. R 66, R-123
Enclosure: NRC Inspection Report
'
cc w/ encl:
(See page 2)
I
9612060258 961126
ADOCK 05000062
f
G
-
_dd/
- _ .
..
._.- - -
. . - . _
- . - . . .. .-_
. - .
. . _ _ . -.
-
.
-
..
-
_
._
'
,
I
UVA
2
I
cc w/ encl:
i
2
Dr. Ronald D. Flack, Jr., Chairman
'
Department of Mechanical, Aerospace
and Nuclear Engineering
l
University of Virginia
Charlottesville, VA 22903 2442
Dr. William G. Vernetson
Director of Nuclear Facilities
Department of Nuclear Engineering
Sciences
!
University of Florida
202 Nuclear Sciences Center
i
i
Gainesville, FL 32611
.
Dr. Ratib A. Karam, Director
Neely Nuclear Research Center
^
Georgia Institute of Technology
900 Atlantic Drive, NW
-
Atlanta, GA 30332
Mr. Pedro B. Perez
'
j
Associate Director
i
Nuclear Reactor Program
!
North Carolina State University
P. O. Box 7909
a
i
Raleigh, NC 27695-7909
i
Leslie P. Foldesi. Director
i
Bureau of Radiological Health
Division of Health Hazards Control
109 Governor Street, Room 916
-
Richmond, VA 23219
4
4
Distribution w/ encl:
A. Adams, NRR
'
i
J. Caldwell, NRR
.
C. Bassett, RII
i
E. McAlpine, RII
C. Pederson, RIII
B. Hurray, RIV
F. Wenslawski, RIV
PUBLIC
OFFICE
Rft DNMS
RIl DNMS
SIGNATURE
NAME
Mo
CBassett
,,
DATE
tj
96
11/2L / 96
11 / 1 96
11 / / 96
11 / / 96
11 / / 96
COPY?
M NO
[_Eh NO
YES
NO
YES
NO
YES
NO
YES
NO
OFFICIA@ORD GOPY
DOGUMENT NAME: 1.\\FFBlhREPOR isiUVA9602.WJ1
--
.-
-- -