ML20214N802
| ML20214N802 | |
| Person / Time | |
|---|---|
| Site: | University of Virginia |
| Issue date: | 11/25/1986 |
| From: | Verelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mulder R VIRGINIA, UNIV. OF, CHARLOTTESVILLE, VA |
| Shared Package | |
| ML20214N806 | List: |
| References | |
| NUDOCS 8612030753 | |
| Download: ML20214N802 (1) | |
See also: IR 05000062/1986003
Text
e
tydhd
-
-
- mvanm
.
.
-
.
Docket Nos. 50-62,. 50-396
License Nos. R-66, R-123
University of Virginia
fTTN: Dr. R.f U. Mulder, Director
Reactor Facility
,
. Charlottesville, VA 22901
-
Gentlemen:
'
SUBJECT: NRC INSPECTION REPORT NOS. 50-62/86-03 AND 50-396/86-02
This refers to the Nuclear Regulatory Commission (NRC) inspection ' conducted by
A. R. Long on October 28-31, 1986.
The inspection included a review of activi-
ties authorized for your UVAR and Cavalier facility.
At the conclusion of the
inspection, the findings were discu.ssed with those members of your staff identi-
fled in the enclosed inspection report.
Areas examined during the inspection are identified in the report;. Within these'
areas, the inspection consisted of selective examinations of proc'edures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection', no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
'
Should you have any questions concerning this letter, please contact us.
,
Sincerely,
,
J
David M. Verrelli, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
'
NRC Inspection Report
-
.
bec w/ encl:
_
-
Document Control Desk
.
Commonwealth of Virginia
g20gy $bb
2
bec w/o enc 1:
G
Jicense Fee Management Branch
-
~
-
.
.
'
'
/
,
WA
dng:er
y
pe
(s
erdt
1Mel en
i
I p86
1/p /86
f d /86
11/ W 86
f
)\\ [NOl
,
.
a