Discusses 860304 Mgt Meeting Re Util Readiness Review Module 17, Raceways, Module 13B, Coatings, App F, Inspector Qualification/Certification & App C, Procurement. List of Attendees Encl
ML20154Q975
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 03/18/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
References
NUDOCS 8603240189
Download: ML20154Q975 (4)


Text

  • .

~~ 5 itht3 his C.cpf MAR 18 1986 Georgia Power Company ATTN: Mr. R. J. Kelly Executive Vice President P. O. Box 4545 Atlanta,' GA 30302 Gentlemen:

SUBJECT:

MEETING

SUMMARY

- V0GTLE FACILITY - DOCKET NO. 50-424 i This refers to the management meeting conducted at your request in the NRC Region II Office on March 4, 1986. This meeting was held to brief the NRC on the Vogtle Readiness Review Modules 'ntitled' Module No.17, " Raceways"; Module No. 138, " Coatings"; Appendix C, " Procurement"; and Appendix F, " Inspector Qualification / Certification".

It is our opinion that this meeting was beneficial and has provided a compre--

hensive overview of the Vogtle Readiness Review Program and, specifically, the modules and appendices presented. These in-depth presentations will better enable the NRC te conduct its evaluations of these submittals.

In accordance with Section 2.790 of NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning these matters, we will be pleased to discuss them.

Sincerely, ORIGINAL SIGNED By:

J. NE130R GRACg J. Nelson Grace Regional Administrator Enclosura:

List of Attendees cc w/ encl:

R. E. Conway, Senior Vice President &

Project Director D. O. Foster, Vice President, Project Supoort P. D. Rice, Vice President, Project Engineering R. H. Pinson, Vice President, Project Construction cc w/ encl: (Continued see page 2)

?-

8603240189 DR 860318 ADOCK 05000424 PDR ZE45

MAR 181986 Georgia Power Company 2 cc w/ encl: (Continued)

R. A. Thomas, Vice President, Licensing C. W. Hayes, Vogtle Quality Assurance Manager W. C. Ramsey, Manager -

Readiness Review G. B. Bockhold, General Manager, Nuclear Operations L. Gucwa, Manager, Nuclear Safety and Licensing M. H. Googe, Project .

Construction Manager E. D. Groover, Quality Assurance Site Manager -

Construction J. A. Bailey, Project Licensing Manager G. F. Trowbridge, Esq., Shaw, Pittman, Potts and Trowbridge B. W. Churchill, Esq., Shaw, Pittman, Potts and Trowbridge E. L. Blake, Jr. , Esq. , Shaw, Pittman, Potts and Trowbridge J. E. Joiner, Troutman, Sanders, Lockerman and Ashmore J. G. Ledbetter, Commissioner, Department of Human Resources

.C. H. Badger, Office of Planning and Budget D. Kirkland, III, Counsel, Office of the Consumer's Utility Council i

D, C. Teper, Georgian: A pinst l Nuclear Energy T. Johnson, Executive Director, Educational Campaign for a Prosperous Georgia M. B. Margulies, Esq., Chairman, Atomic Safety and Licensing Board Panel Dr. O. H. Paris, Administrative Judge- g

-Atomic Safety and Licensing Board j

Panel )

. G. A. Linenberger, 'Jr. , Administrative Judge Atomic Safety and Licensing Board

. Panel i

B. P. Garde, Citizens Clinic, Director Government Accountability Project bec w/ encl: (See page 3) 1

[$i-MAR 18 1983 1

Georgia Power Company -3 bec w/ enc 1:

'J. R. Thompson, NRR M. V. Sinkule W. H. Rankin W. M. Hill, IE NRC Resident Inspector-Document Control Desk State of Georgia RII .

RII RI MWRankin:1b RII'h' MSinkule.

.N VBrownlee al r.

03/gfl/86 '03/[}/86' 03/t1/86 3/ /86-

/7 r:

T

_o . .

ENCLOSURE LIST OF ATTENDEES JANUARY 9, 1986 U. S. Nuclear Regulatory Commission R. D. Walker, Director, Division of Reactor Projects (DRP)

V. L. Brownlee, Chief, Reactor Projects Branch 3, DRP M. V. Sinkule, Chief, Reactor Projects Section (RPS) 3C, DRP G. A. Belisle, Acting Chief, Quality Assurance Programs Section, DRS T. E. Conlon, Chief, Plant Systems Section, DRS W. H. Rankin, Project Engineer, RPS 3C, DRP J. R. Harris, Reactor Engineer, DRS M. D. Hunt, Reactor Engineer, DRS H. H. Livermore, Senior Resident Inspector, Construction, DRP J. Lazevnick, Technical Reviewer - Module 17, NRR N. Fields, Technical Reviewer - Module 17, NRR J. Wing, Technical Reviewer - Module 13B, NRR J. W. Thompson, Project Engineer, NRR Georgia Power Compan3 D. 0. Foster, Vice President, Project Support J. J. Curtin, Stone and Webster R. W. McManus, Construction Disciplines Manager, RR A. M. Nakashima, Appendices Discipline Manager, RR G. C. Bell, QA Manager, RR

.