Informs That Written & Operating Exams Scheduled for Wk of 881205.Facility Training Staff Should Retain Simulator Exam Scenario Info Until Candidates Pass Operating Exam or Appeals Filed for Failed Candidates.W/Encl Ref Matls
ML20154J904
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/16/1988
From: Eselgroth P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Tiernan J
BALTIMORE GAS & ELECTRIC CO.
References
NUDOCS 8809230174
Download: ML20154J904 (10)


Text

_ _ _ _ -

b i

i SEP 161988 i

Docket. Nos. 50-317 I i 50-318 l Baltimore Gas and Electric Company l ATTN: Mr. J. A. Tiernan  !

? Vice President - Nuclear Energy Calvert Cliffs Nuclear Power Plant MD Rts 2 and 4, P.O. Box 1535 Lusby, Maryland 20657

! Gentlemen:  !

SUBJECT:

REACTOR OPERATOR AND SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS f

?  !

In a telephone conversation between Mr. John Hill, Supervisor, Operations

. Training, and Mr. Barry Norris, Examiner, arrangements were made for the i ad71nistration of the examinations at the Calvert Cliffs Nuclear Power Plant,  ;

, Units 1 and 2.

i .

. The written and operating examinations are scheduled for the week of December 5, 1988.

In order for us to meet the above schedule, it will be necessary for the  !

i facility to furnish the approved reference material itsted in Enclosure 1, i "Reference Material Requirements for Reactor / Senior Reactor Operator Licensing j

Examinations," by October 3, 1988. Any delay in receiving properly bound and  :

, indexed reference material will result in a delay in administering the i j examinations. Our examinations are scheduled far in advance with considerable  !

! planning to utilize our presant limited examiner manpower and to meet the '

J examination dates requested by the various facilities. Mr. Hill has been i advised of the reference material requirements, and the examiners' names and l addresses. .

l  !

l The facility management is responsible fer providing tiequate space and l facilities in order to properly conduct the written u aminations. Enclosure 2, i I

"Adcainistration of Reactor / Senior Reactor Operator Licensing Written  !

j Examinations," describes our requirements for conducting these examinations.  !

) In addition, to better document simulator examinations, the chief examiner will i a ha!e the facility simulator operator record prespecified plant conditions  !

! (i.e., plant pressures, temperatures and levels, etc.) for each simulator scen- l 1

ario. The candidate will be responsible for providing this information along  !

j with any appeal of his simulator operating examination. Therefr. e the facility i training staff should retain the simulator examination scenario iaformation l 1 until all candidates taking the examination have either passed the operating l examination or all appeals filed by the candidates who failed the operating i l examination have been completed. j i ,

I i

i i

8809P30174 000916 0FFICIAL RECORD COPY CC 90 DAY LTR - 0001.0.0 7/

b7 i

! PDR ADOCK 05000317 09/15/88 / l

! V pg  !

/

~

! I )

ik .

2 4 Enclosure 3 contains the rules and guidance that will be in effect during the administration of the written examination. The facility management is responsible for ensuring that all candidates are aware of these rules.

All reactor operator and senior reactor operator license applications should normally be submitted at least 30 days before the first examination date so that we will be able to review the training and experience of the candidates, process the medical certifications, and prepare final examiner assignments after candidate elig:bility has been determined. If the applications are not received at least twa weeks before the examination dates, it is likely that a postponement will b .,ecessary.

The facility staff review of the written examination will be conducted in accordance with requirements specified in Enclosure 4, "Requirements for Facility Review of Written Examination."

This request for information was approved by the Office of Management and Bud-get under Clearance Number 3150-0101, which expires May 31, 1989. Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D.C.

20503.

Thank you for your consideration in this matter. If you have any questions regarding the examination procedures and requirements, please contact me at (215) 337-5211.

Sincerely, PETER W. ESELGROTH Peter W. Eselgreth, Chief PWR Section Operations Branch Division of Reactor Safety

Enclosures:

1. Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations
2. Requirements for Administration of Written Examinations
3. NRC Rules and Guidelines for License Examinations I'
4. Facility Review Requirements cc w/ enclosures:

W. J. Lippold, General Supervisor J. Hill, Supervisor, Operations Training NRC Resident Inspector 1

0FFICIAL RECORD COPY CC 90 DAY LTR - 0002.0.0 09/15/88

3 bec w/ei. closures:

ORP Section Chief B. Norris, Chief Examiner J. Prell, Examinar OL Facility File d

\

R O![ RI:DRS B_

KA Norris E, th 9II/88 9/[/88 f 9hf/88 0FFICIAL RECORD COPY CC 90 DAY LTR - 0002.1.0 09/15/83

  • t i

ENCLOSURE 1 REFERENCE MATERIAL REQUIREMENTS FOR REACTOR / SENIOR REACTOR i I

OPERATOR LICENSING EXAMINATIONS i

1. Existing learning objectives and lesson plans (including training manuals, l plant orientation manual, system descriptions, reactor theory, thermo- '

dynamics,etc.). l Training materials should include all substantive written material used  !

for preparing candidates for initial R0 and SRO licensing. The written  ;

material should be inclusive of learning objectives and the details pre-sented during lecture, rather than outlines. Training materials should '

be identified by plant and unit, bound, and indexed. Failure to provide '

complete properly bound and indexed plant reference material may result in canceling and rescheduling of the examinations. Training materials .

wh'.ch include the following should be provided, t

System descriptions including descriptions of all operationally .

relevant flow paths, components, controls and instrumentation. Sys-  !

tem training material should draw parallels to the actual procedures  !

used for operating the applicable system, i

Complete and operationally useful descriptions of all safety-system j interactions and, where available, BOP system interactions under  ;

emergency and abnormal conditions, including consequences of anti-  !

cipated operator error, maintenance error, and equipment failure. {

Training material used to clarify and strengthen underst.nding of )

emergency operating procedures. l t

Comprehensive theory material that includes fundamentals in the area  !

of theory of reactor operation, thermodynamics, heat transfer and fluid flow, as well as specific application to actual in plant l components. For example, mechanical theory material on pumps should include pump theory as well as descriptions of how these principles actually apply to major plant pumps and the systems in which they are installed (i.e., ECCS pumps, Feedwater pumps). Reactor Theory material should include descriptions that draw explicit ties between the fundamentalt- and the actual operating limits followed in the plant (i.e., reactor theory material should contain explanations how principles relate to the actual curves used by operators to verify shutdown margin).

OFFICIAL RECORD COPY CC 90 DAY LTR - 0004.0.0 1 09/15/88 j

. l Enclosure 1 2 l

2. Procedure Index (alphabetical by subject)
3. All Administrative Procedures (as applicable to reactor operation or safety)
4. All integrated plant procedures (normal or general operating procedures)
5. Emergency procedures (emergency instructions, abnormal or special pro-cedures)
6. Standing orders (important orders that are safety related and may super-sede the regular procedures)
7. Fuel-handling and core-loading procedures (initial core-loading procedure, when appropriate)
8. Annunciator procedures (alarm procedures, including set points)
9. Radiation Protection Manual (radiation control manual or procedures)
10. Emergency Plan impiementing procedures i 11. Technical Specifications
12. System Operating Procedures
13. Piping and Instrumentation diagrams, electrical single-line diagrams, or flow diagrams
14. Technical Data Book, and/or Plant curve information as used by operators

, and facility precautions, limitations, and set points (PLS) for the t

facility

15. Questions and answers and simulator scenarios specific to the facility training program which may be used in the written examination or operating test, re:pectively (voluntary by facility licensee) '

l 16. The following on the plant reference si nulator (not applicable to non-power facilities)

a. List of all readily available initialization points.
b. List of all preset malfunctions with a clear identification number.  ;

i The list should include cause and effect information. Specifically, r I

for each malfunction a concise description of the expected result, 1 or range of results, that will occur upon implementation should be  ;

j provided. Additionally, an indication of which annunciators are to l j be initially expected should be given.  :

l r j f

0FFICIAL RECORD COPY CC 90 DAY LTR - 0005.0.0 l 09/15/88

-rm -- ,---- - - - . - . y ,6,- - 9y _y 9,. ----yw- ----.-----------4 -% -

Enclosure 1 3

c. A description of simulator failure capabilities for valves, breakers, indicators and alarms.
d. Where the capability exists, an explanation of the ability to vary the severity of a particular malfunction should be provided, i.e.,

ability to vary the size of a given LOCA or steam leak, or the abil-ity to cause a slow failure of a component such as a feed pump, tur-blne generator or major valve.

e. An indication of modeling conditions / problems that may impact the examination,
f. Identification of any known Performance Test Failures not yet com-pleted.
g. Identification of significant differences between the simulator and the control room,
h. Copies of facility generated scenarios that expose candidates to situations of degraded pressure control (PWR), degraded heat removal ,

capability (PWR and BWR) and containment challenges (BWR) may be provided (voluntary by Itcensee).

j 1. Simulator instructions manual (voluntary by licensee).

j. Description of the scenarios used for the training class (voluntary by licensee),

j 17. Additional material required by the examiners to develop examinations that l j meet the requirements of these standards and the regulations. t The above reference material should be approved, final issues and should be so marked. If a plant has not finalized some of the mattrial, the chief examiner shall verify with the facility that the most complete, up-to-date material is i

available and that agreement has been reached with the licensee for limiting changes before the administration of the examination. All procedures and '

reference material should be bound with appropriate indexes or tables of )

contents so that they can be used efficiently. l l

l 4

)

J l OFFICIAL RECORD COPY CC 90 DAY LTR - 0005.1.0 i

09/15/88 I

ENCLOSURE _2 REQUIREMENTS FOR ADMINISTRATION OF WRITTEN EXAMINATIONS

1. A single room shall be provided for completing the written examination. ,

The location of this oom and supporting restroom facilities shall be such l as to prevent contact with all other facility and/or contractor personnel during the written examination. If necessary, the facility should mr.ke arrangements for the use of a suitable room at a local school, motel, or other building. Obtaining this room is the responsibility of the licensee.  ;

2. Minimum spacing is required to ensure examination integrity as determined by the chief examiner. Minimum spacing should be one candidate per table, with a three foot space between tables. No wall charts, models, and/or other training materials shall be present in the examination room.
3. Suttable arrangement shall be made by the facility if the cand' dates are to have lunch, coffee, or other refreshments. These arrangements shall comply with Item 1 above. These arrangements shall be revicwed by the examiner and/or proctor.
4. The facility staff shall be provided a copy of the written examination and answer key after the last candidate has completed and handed in his writ-ten examination. The facility staff shall then have five working days to provide formal written comments with supporting documentation on the examination and answer key to the chief examiner or to the regional office section chief.
5. The licensee shall provide pads of 8-1/2 by 11 in. lined paper in unopened  :

packages for each candidate's use in completing the examination. The i examiner shall distribute these pads to the candidates. All reference ,

material needed to complete the examination shall be furnished by the '

examiner. Candidates can bring pens, pencils, calculators, or rulers into the examination room, and no other equipment or reference 'naterial shall i be allov.ed.

6. Only black ink or dark pencil should be used for writing answers to i questions.  ;

l l

l OFFICIAL RECORD COPY CC 90 DAY LTR - 0007.0.0 09/15/88

e  !

i ll

. l ENCLOSURE 3 NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS i

During the administration of this examination the fullowing rules apply
-

j 1. Cheating on the examination means an automatic dental of your appitcation l

{ and could result in more severe penalties. g

) 2. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examhation I

room to avoid even the appearance or possibility of cheating.

I

3. Use black ink or dark pencil only to facilitate legible reproductions.

! 4. Print your name in the blank provided on the cover sheet of the examina- {

i tion.

5. Fill in the date on the cover sheet of the examination (if necessary). l
6. Use only paper provided for answers.
7. Print your name or initials in the upper right-hand corner of the first j page of each page of the answer sheet. ,

, a j 8. Consecutively number each answer sheet, write "End of Category _" as  !

4 appropriate, start each category on a new page, write on only one side of j the paper, and write "Last Page" on the Tast answer sheet.  :

i

9. Number each answer as to category and number, for example,1.4, 6.3.  !

1

10. Skip at least three lines between each answer.  !

i .

11. Separate answer sheets from pad and place finished answer sheets face down i on your desk or table.  !

! l

] 12. Use abbreviations only if they are commonly used in facility literature. l i i

13. The point value for each questior. Is indicated in parentheses after tha j question and can be used as a guide for the depth of answer required.

' }

! 14. Show all calculations, methods, or assumptions used to obtain an answer l

] to rnathematical problems whether indicated in the question or not, j i

15. Partial credit may be given. Therefore, ANSWER ALL PARTS OF THE QUESTION  !

l AND DO NOT LEAVE ANY ANSWER BLANK. -

j 16. If parts of the examination are not clear as to intent, ask questtor s of j the examiner only, '

l i

1 0FFICIAL RECORD COPY CC 90 DAY LTR - 0008.0.0

, 09/15/88 1

I

. l l

l Enclosure 3 2

17. You must sign the statement on the cover sheet that indicates that the work is your own and you have not received or been given assistance in completing the examination. This must be done after the examinition has been completed.
18. When you complete your examination, you shall:
a. Assemble your examination as follows:

) (1) Exam questions on top. ,

(2) Exam aides - figures, tables, etc.

(3) Answer pages including figures which are a part nf the answer.

b. Turn in your copy of the examination and all pages used to answer the examination questions,
c. Turn in all scrap paper and the balence of the paper that y)u did not use for answering the questions,
d. Leave the examination area, as defined by the examiner. If after leaving, you are found in this area while the examination is still in progress, your license may be denied or revoked.

I l

1 l l t

t L l

l i

a l

OFFICIAL RECORD COPY CC 90 DAY LTR - 0009.0.0 i l 09/15/88 1

l I

ENCLOSURE 4 REQUIREMENTS FOR FACILITY REVIEW 0F WRITTEN EXAMINATION l

1. There shall be no review of the written examination by the facility staff before or during the administration of the examination. Following the administration of the written examinathn, the facility staff shall be ,

provided a marked-up copy of the examinasion and the answer key. l

2. The facility will have five (5) working days from the day of the writte- I examination to provide formal comment submittal. The submittal wi;) be '

j made to the responsible Regional Office by the highest level of corporate I management fu plant operations, e.g., Vice Presf dent for Nuclear Opera- l tions. A copy of the submittal will be forwarded tu the chief exarainer, i as appropriate. Comments not submitted within five ( i) working days will be considered for inclusion in the grading process on a cese basis by the  !

Regional Office section leader. Should the comment submittal deadlina not be met, a long delay for finalization of the examination results may occur.

3. The following format should be adhered to for submittal of specific comments:
a. Listing of NRC Question, answer M referenca.  ;
b. Facility comment.

j c. Supporting documentation.

3 NOTES: 1. No change to the examinttisn will be made without submittal .

of complete, current, anc approved reference material, i 1

2. Comments made without a concise facility recommendation 1
will not le addressed. I I

i

)

1 l

1 0FFICIAL RECORD COPY CC 90 DAY LTR - 0010.0.0 0945/88 i

!