Informs That 880711 Submittal Re Amend to License NPF-62 Fails to Provide Adequate Technical Basis to Allow NRC to Reach Appropriate Decision.Submittal Did Not Include Safety Evaluation Addressing Technical Basis
ML20153E760
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/30/1988
From: Stevens J
Office of Nuclear Reactor Regulation
To: Holtzscher D
ILLINOIS POWER CO.
References
GL-87-09, GL-87-9, NUDOCS 8809060411
Download: ML20153E760 (5)


Text

r - ,

%, UNITED STATES t

,f n NUCLEAR REGULATORY COMMISSION WASHINMON, D, C. 20H5 t.

% / August 30, 1988 Dockat No. 50-461 Hr. Dale L. Holt:scher Acting Manager - Licensing and Safety Clinton Power Station Post Office Box 678 Mail Code V920 Clinton, IL 61727

Dear Mr. Holtzscher:

SUBJECT:

CLINTON POWER STATION - LICENSE AMENDMENT REQUEST DATED JULY 11, 1988 By letter dated July 11, 1988, Illinois Power Compa y, et al. (the licensees) requested changes to the Clinton Power Station (CPS Technical Specifications Sections 3.0.4, 4.0.3, 4.0.4 and Bar.es Sections 3.0 and 4.0. In addition, the amendment deletes numerous Technical Specification statements which presently take exception to the provisions of Specification 3.0.4. These changes were proposed by the licensees in accordance with Generic Letter 87-09, which includes recent initiatives undertaken in accordance with the NRC staff and the nuclear industry to improve Technical Specifications.

The staff has reviewed the submittal dated July 11, 1988 and has concluded that it is deficient in that it failed to provide an adequate technical basis to allow the NRC staff to reach an appropriate decision. Specifically, your (

subniittal did not include a Safety Evaluation addressing the technical basis for the changes or an Environmental Assessment, both of which are needed to support the requested changes. Gerieric letter 87-09 does not contain plant-specific infonnation concerning the technical safety basis and therefore l should not be interpreted as a blanket approval for Technical Specification '

changes. Each amendment request must be evaluated on its own merits to ensure that the plant-specific situation is appropriate to support the change.  ;

i 8809060411 DR 000030 p ADOCK 05000461 PNU hf0 '

'I

2 Since your submittal did not include a Safety Evaluation addressing the technical basis for the changes or an Environmental Assessment, the staff I,?s detemined that your submittal is not adequate. For further information or clarification, please contact me at (301) 492-1397.

I

! Sincereiy,  ;

j h w N.

  • Janice A. Stevens Project Manager Project Directorate !!!-2
Division of Reactor Projects III,
IV, Y and Special Projects cc
See next page i

i

,i i

I  !

l e i f

e 4

a 1 ,

b i

l

! i i i 4

f

. Wr. Frank A. Spangenberg Clinton Power Station

. Illinois Power company Unit I cct I

Mr. L. Larson l Mr. D. P. Hall Project Manager Vice President < General Electric Company Clinton Power station 175 Curtner Avenue, N/C 3P5 P. O. Box 678 San Jose, California 95125 Clinton Illinois. 61727 Regional Administrator, Region III Mr. R. D. Freeman 7pg Roosevelt Road, Bldg. f4 Manager-Puclear Station Engineering Dept. Glen Ellyn Illinois 60137 Clinton Power Station i

P. O. Box 678 Chairman of &;witt County Clinton, Illinois 61727 c/o County Clerk's Office DeWitt County Courthouse Sheldon Zabel Es C1tnton, Illinois 61727 Schiff. Hardin & quire Waite 7200 Sears Tower Illinois Department 233 Wacker Drive of Nuclear Safety Chicago, Illinois 60606 '

Division of Engineering 1035 Outer Park Drive 5th Floor Resident Inspector Springfield, Illinois 62704 U. 3. Nuclear Regulatory Commission RR 3, Box 229 A Mr. Donald Schopfer Clinton, Illinoit 61727 Project Manager Sargent & Lundy Engineers 1

  • 55 fast Monroe Street Chicago, Illinois 60603

. I I

i

. r F

l l i

1 i i

Auaust 30, 1988 Since your submittal did not include a Safety Evaluation addressing the technical basis for the changes or an Environmental Assessment, the staff has determined that your submittal is not adequate. For further information or clarification, pleasu contact me at (301) 492-1397.

Sincerely, Janice A. Stevens, Project Manager Project Directorate III-2 Division of Reactor Projects III, IV, Y and Special Projects cc: See next paga DISTRIBUTION t -Docket file EJordan i NRC & Local PDRs PDlII-2 Plant file i

PDIII-2 r/f ACRS (10)

DCrutchfield OGC i GHolahan EMarcus LLuther BGrimes JStevens i

) PDI!!-2 PDII I-2.f P JSteven km LLuther'j . .e

[Q

, 8/04/8 8/26/88 8/yo /88 \

August 30, 1988 i . ,

. Since your submittal did not include a Safety Evaluation addressing the technical basis for the changes or an Environmental Assessment, the staff has determined that your :;ubmittal is not adequate. For further infonnation or clarification, please contact rne at (301) 492-1397.

Sincerely, Janice A. Stevens, Project Manager Project Directorate !!!-2 Division of Reactor Projects III, IV, Y and Special Projects cc: See next page DISTRIBUTION Focket file EJordan NRC & Local PDRs PDIII-2 Plant file PDI!!-2 r/f ACRS (10)