ML20153B326

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation Supporting Util Responses to Generic Ltr 83-28,Item 2.2,Part 2
ML20153B326
Person / Time
Site: Maine Yankee
Issue date: 03/16/1988
From: Sears P
Office of Nuclear Reactor Regulation
To: Randazza J
Maine Yankee
Shared Package
ML20153B328 List:
References
GL-83-28, NUDOCS 8803220066
Download: ML20153B326 (2)


Text

- . - _ _ _

[.

March 16,1988 4

I Docket No. 50-309

! Mr.' J. B. Randazza-Executive Vice President Maine Yankee Atomic Power Company 83 Edison Drive Augusta, Maine 04336

Dear Mr. Randazza:

SURJECT:' MAINE YANKEE VENDOR INTERFACES - ITEM 2.? PART ?. OF GENERIC LETTER 83-?8 By letter dated June 4,1987 you were informed that your response to item 2.?

Part 1 of Generic letter 83-?R was acceptable.

By lettars dated November 10, 1983, February 16, 1984, April 12, 1984, December 14, 1984, June 18, 1985 and 'aqust 20, 198S, you described your planned'and current actions regarding vendor interfaces (Generic letter 83-28 Item 2.2.2). Certain of these actions were reviewed during a staff on-site Region I inspection conducted May 12-16, 1986, as described in Inspection Report 50-309/86 07. Additionally, you provided to the staff a copy of your issued procedure that addresses the control of vendor instructions manuals.

Your response has been evaluated and is acceptable. The staff Safety Evaluation is enclosed. This completes our review of Item 2.2. of Generic letter 83-?8.

Sincerely, Original Signed by:

Patrick M. Sears, Project Manager Project Directorate I-3 Divisien of Reactor Projects, I/II

Enclosure:

As stated cc: See next page DISTRIBUTION: 'DockettFile,Tocal'PDRs, PDI.3 R/F, OGC, BBoger, SVarga, EJordan, JPartlow. PSears, MRushbrook, ACRS (10), RWessman n N 63

[6 p DI-3:

OFC :PDI-3 :PDI.3 ' :ACT  :  : : :

.__..:.........g__:___....___..:.. ___..:..____......:..__..__....:............:...........

NAME :MRushbrook :PSears :CS le  :  :  : :

DATE :03/ 0/88 :03/ 6 /88 :03/(I/88  :  :

0FFICIAL RECORD COPY 8803220066 080316 PDR ADOCK 05000309 P PDR

'I L* March 16,1988-06cket No. 50-309 Mr. J. B. Randazza Executive Vice President Maine Yankee Atomic Power Company 83 Edison Drive Augusth, Maine 04336

Dear Mr. Randazza:

SUBJECT:

MAINE YANKEE VENDOR. INTERFACES - ITEM 2.? PART 2 0F GENERIC LETTER 83-?8 By letter dated June 4, 1987 you were inforced that your response to Item 2.2 Part 1 of Generic letter 83-2A was acceptable.

By letters dated November 10, 1983, February 16,1984, April 12,1984, December 14, 1984, June 18, 1985 and August 20, 1985, you described your planned and current actions regardi'ng vendor interfaces (Generic letter 83-28 Item 2.2.2). Certain of these actions were reviewed during a staff on-site Region I inspection conducted May 12-16, 1986, as described in Inspection Report 50-309/86 07. Additionally, you provided to the staff a copy of your issued procedure that addresses the control of vendor instructions manuals.

Your response has been evaluated and is acceptable. The staff Safety Evaluation is enclosed. This completes our review of Item 2.2. of Generic letter 83-?8.

Sincerely, Original Signed tiy:

Patrick M. Sea.rs, Project Manager Project Directorate I-3 Division of Reactor Projects, I/II

Enclosure:

As stated cc: See next page DISTRIBUTION: Docket File, local DDRs, PDI-3 R/F, OGC, BBoger, SVarga, EJordan, JPartlow, PSears, MRushbrook, ACRS (10), RWessman OFC :PDI-3 (h.h $ :PDI-3 0b :ACT RfPOI-3:  :  :  : :

......:.........g..:............:.. g.....:............:............:.........___:......__...

NAME :Maushbrook :PSears :CS le  :  :  :  :

DATE :03/ O/88 :03/n/88 :03/6/88 r  :  :

0FFICIAL RECORD COPY

_ . - _