ML20059K991

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation Accepting Methodology Re Statistical Combination of Uncertainties for RPS Setpoints
ML20059K991
Person / Time
Site: Maine Yankee
Issue date: 09/20/1990
From: Leeds E
Office of Nuclear Reactor Regulation
To: Frizzle C
Maine Yankee
Shared Package
ML20059K996 List:
References
TAC-67931, NUDOCS 9009260017
Download: ML20059K991 (2)


Text

-

q.N,g,

~,

w 8:

U Docket No. 50-309.

September 20, 1990

~ Mr. C. D. Frizzle, President Maine' Yankee Atomic Power Company 83 Edison Drive Augusta; Maine 7.04336

Dear Mr. Frizzle:

SUBJECT:

" STATISTICAL COMBINATION OE UNCERTAINTIES METHODOLOGY FOR MAINE-YANKEE OPERATING LIMITS ~(TAC.NO. 67931)

On April 19, 1988, you submitted Volumes 1 and 2 of the report entitled " Maine

Yankee'RPS-Setpoint Methodology.-Using Statistical Combination of Uncertainties"-

for the staff's review. The report describes an alternate method of statistically ~

combining the uncertainties applicable to the determination of operating limits.

for the protection of the fuel from experiencing' centerline melting and Departure

-l

_from_ Nucleate Boiling.

-The staff has ' completed its review of your report and found the metho' ology-d acceptable:for use.- Enclosed is the staff's safety evaluation.

Sincerely, Original signed by:

1 Eric J. Leeds Project Manager Project Directorate 1-3 Division of Reactor Projects.--I/II Office of Nuclear Reactor Regulation-

Enclosures:

]

' 1. ' Safety Evaluation (cc w/ enclosures:

-See next~page l

i LA-

-3 PM:PD

~

')t I-(A)

M ok Ele s

- f

~,

j s

/ /90

//7/90

/20/90-0FFICIAL RECORD COPY

. Document Name:- STATISTICAL COMBINATION /MY

,a

.1 i

- n.3

r. 3 D$.[k1. '

b?03 9009260017 900920

)

\\

PDR ADOCK 05000309 p

PDC 4

I Mr. C. D. Frizzle Maine Yankee CC' Mr. Charles B. Brinkman Mr. G. D. Whittier, Manager Manager - Washington Nuclear Nuclear Engineering and Licensing Operations-Maine Yankee Atomic Power Company Combustion Engineering, Inc.

83 Edison Drive 12300 Twinbrook Parkway, Suite 330 Augusta, Maine 04336-Rockville, Maryland 20852 t

Mr. Robert W. Blackmore John A. Ritsher, Esquire Plant Manager Ropes &. Gray Maine Yankee Atomic Power Company 225 Franklin Street P.O. Box 408 i

Boston, Massachusetts 02110 Wiscasset, Maine 04570 State Planning Officer Executive Department 189 State Street Augusta, Maine 04330 Dr. E. T. Boulette Vice President - Operations Maine Yankee Atomic Power Company

I P. 0.-Box 408 Wiscasset, Maine 04578

~

Regional Administrator, Region I U.S. Nuclear Regulatory Connission 475 Allendale Road King of Prussia, Peansylvania 19406 i

First Selectman of Wiscasset Municipal Building U.S. Route 1 Wiscasset, Maine 04578 l

Mr. Charles S. Marschall Resident Inspector Maine Yankee Atomic Power Station U.S~.- Nuclear Regulatory Connission P. O. Box E

-Wiscasset, Maine 04578 Mr. -P. L. Anderson, Project Manager

. Yankee Atomic Electric Company l

580 Main Street L

Bolton, Massachusetts 01740-1398 l

'l

.