Forwards Insp Rept 50-309/98-05 on 981101-0213.Determined That Two Violations Occurred Based on Insp Results & Review of 1997 LER Prior to Permanent Shutdown Determined That Addl Violation Occurred.Violations Treated as NCVs
ML20196K911
Person / Time
Site: Maine Yankee
Issue date: 03/26/1999
From: Bellamy R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Meisner M
Maine Yankee
Shared Package
ML20196K913 List:
References
50-309-98-05, 50-309-98-5, NUDOCS 9904080143
Download: ML20196K911 (3)


See also: IR 05000309/1998005

Text

__

&

44 #fC

.

%

UNITED STATES

['

g

NUCLEAR REGULATORY COMMISSION

li

j

REGloN I

c

475 ALLENDALE ROAD

,8

KING oF prussia, FINNsYLVANIA 19406-1415

....*

March 26,1999

Mr. Michael Meisner

President

Maine Yankee Atomic Power Company

321 Old Ferry Road

Wiscasset, Maine 04578-4922

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-309/98-05

Dear Mr. Meisner:

On February 13,1999, the NRC completed an inspection at your Maine Yankee reactor

facility. The results of that inspection were discussed with you and others of your staff

during a teleconference held on February 11,1999. The enclosed report presents the

results of that inspection.

During the three-month period covered by this inspection period, your conduct of activities

at the Maine Yankee facilities was generally characterized by safety conscious operations,

sound engineering practices, and careful radiological work controls.

Based on the results of this inspection, the NRC has determined that two violations of NRC

requirements occurred. In addition, review of a 1997 Licensee Event Report prior to

1

permanent shutdown determined that an additional violation of NRC requirements also

j

occurred. These violations are being treated as Non-Cited Violations (NCVs), consistent

with Appendix C of the Enforcement Policy. These NCVs are described in the subject

inspection report. If you contest the violation or severity level of these NCVs, you should

provide a response within 30 days of the date of this inspection report, with the basis for

your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,

Washington DC 20555-0001, with copies to the Regional Administrator, Region I, and the

Director, Office of Enforcement, United States Nuclear Regulatory Comrnission,

Washington, DC 20555-0001.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosure will be placed in the NRC Public Document Room.

Sincerely,

f,

Original Signed by:

f

1

Ronald R. Bellamy, Chief

Decommissioning and Laboratory Branch

Division of Nuclear Materials Safety

Docket No:

50-309

,

h Of

License No:

DPR 36

'

i

9904080143 990326

5

'

DR

ADOCK 0500

9

,

-

-

t

T

.

Michael Meisner

2

Enclosure: NRC Inspection Report No. 50-309/98-05

cc w/ encl:

W. Henries, Manager - Engineering

J. M. Block, Attorney at Law

P. L. Anderson, Project Manager (Yankee Atomic Electric Company)

E. Howes, Manager of Public and Governmental Affairs

T. Dignan, Attorney (Ropes and Gray)

G. Zinke, Director, Regulatory Affairs

W. Odell, Director, Operations

M. Ferri, Vice President, Decommissioning

M. Lynch, Esquire, MYAFC

P. Dostie, State Nuclear Safety inspector

P. Brann, Assistant Attorney General

U. Vanags, State Nuclear Safety Advisor

C. Brinkman, Combustion Engineering, Inc.

W. D. Meinert, Nuclear Engineer

First Selectmen of Wiscasset

M. Kilkelly, State Senator, Chair - Community Advisory Panel

Maine State Planning Officer - Nuclear Safety Advisor

State of Maine, SLO Designee

State Planning Officer - Executive Department

Friends of the Coast

i

!

.

l

'

\\

l

,

I

j

!

I

,

t

-

.

1

Michael Meisner

3

i

Distribution w/ encl:

Region i Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

PUBLIC

H. Miller, RA/J. Wiggins, DRA

R. Bangart, OSP

DNMS P' rector, Region 1

DNMS Deputy Director, Region 1

R. Bellamy, DNMS

M. Roberts, DNMS

T. Jackson, DNMS

W. Raymond, DRS

pistribution w/enci (VIA E-MAIL):

K. Kennedy, OEDO

l

M. Webb, NRR

S. Weiss, NRR

J. Hickey, NMSS

L. Pittiglio, NMSS

L. Portner, OCA

D. Screnci, PAO

N. Sheehan, PAO

Inspection Program Branch, NRR (IPAS)

DOCDESK

'

DOCUMENT NAME: G:\\D&LB\\MY\\MY98-05.wpd

To receive e copy of this document, indicate in the bos:

  • C* = Copy without ettechment/ enclosure

"E" - Copy with attachment / enclosure

  • N' = No copy

OFFICE

Rl/DNMS d Bl/DRS

l

lRl/DNMS l

Rl/ ORAM Rl/DNMS l

NAME

TJackson F ?WRaymond