Forwards Radiological Controls Insp Rept 50-309/90-09 on 900507-11.No Violations Noted.Observations by Inspector Indicated Improvement in Radiological Planning & Control of Outage Work Activities
ML20055C880
Person / Time
Site: Maine Yankee
Issue date: 06/14/1990
From: Ronald Bellamy
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Frizzle C
Maine Yankee
Shared Package
ML20055C881 List:
References
NUDOCS 9006250326
Download: ML20055C880 (2)


See also: IR 05000309/1990009

Text

<7

g

i

..

,

.

.,

'

g

y

..

.

1

JUN 141990

.

Docket No. 50-309

Maine Yankee Atomic Power Company

n

= ATTN:

Mr.~ Charles D. Frizzle

President

83 Edison Drive

Augusta, Maine 04336

Gentlemen:

>

Subject:

NRC Inspection Report No. 50-309/90-09

i

A routine radiological controls inspection was conducted by Mr. R. L. Nimitz

i

at the Maine Yankee Power Station on May 7-11, 1990.

The areas reviewed during the inspection are discussed in the enclosed

,

report. The principal focus of the inspection was to review your radiological

controls for the outage. The results of the inspection were discussed with

Mr. E. T. Boulette and other members of your staff on May 11, 1990.

Within the scope of this inspection, no apparent violations were identified.

The observations by the inspector indicated improvement in the radiological

planning and control of outage work activities.

The radiological planning for-

the thermal shield repair was considered of good quality.

.The inspection did identify a need to improve the radiological oversight of

' steam generator work act.ivities.

In addition, there appears to be a need to

improve communications within the station organization _to ensure that worker

concerns are resolved. Also,.it appears'that. radiation protection management

issued a Night Order that superceded approved plant procedures. This matter

i

is. unresolved and:will be reviewed during a future inspection.

No response to this letter is required.

.Your cooperation with us is appreciated.

,.

Sincerely,

p

Original Signed Oy:

Ronald R. Bellarny

Ronald R. Bellamy, Chief

Facilitie> Radiological Safety

and Safeguards Branch

Division of Radiation Safety

and Safeguards

{

f

~

m.

ll }. A

d

l ,4

0FFICIAL RECORD COPY

IR MY 90-09 - 0001.0.0

(

m.,

GIj)

9006250326 900614

06/05/90

PDR

ADOCK 05000309

o

PDC

L-

- --

-

- :

5

-

.

.

,

Maine Yankee Atomic

2

JUN I 41000

,

Power Company

Enclosure:

NRC Inspection Report No. 50-309/90-09

cc w/ enc 1:

>

J. Randazza, Assistant Chairman of the Board

J. H. Garrity, Executive Assistant to the President

E.-T. Boulette, Vice President, Operations

P. L. Anderson, Project Manager

J. D. Firth, Vice President, Public and Governmental Affairs

G._D. Whittier, Manager, Nuclear Engineering and Licensing

R. W. Blackmore, Plant Manager

'J. A. Ritsher, Attorney (Ropes and Gray)

Peter Brann, Assistant Attorney General

U. Vanags, Maine. State Planning Office

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Maine, SLO Designee

bcc w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

.J. Johnson, DRP

E. McCabe, DRP

H. Eichenholz, SRI - Vermont Yankee

M. Conner, SALP Reports Only

K. Abraham, PA0 (20) SALP Report and (2).All Inspection deports

.

J. Caldwell, EDO

E. Leeds, LPM, NRR

,

M

R]S

i

RI:DRSS

R

RI:DRSS

Nim t /mk

as QL

Bellamy

06/tl/90

06h/90

06/\\i/90

OFFICIAL RECORD COPY

IR MY 90-09 - 0002.0.0

06/05/90

,

i