Forwards Requalification Exam Rept 50-309/89-05OL Conducted on 890515-18.Program Rating:Satisfactory
ML20246P519
Person / Time
Site: Maine Yankee
Issue date: 07/12/1989
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Frizzle C
Maine Yankee
Shared Package
ML20246P526 List:
References
NUDOCS 8907200234
Download: ML20246P519 (2)


See also: IR 05000309/1989005

Text

___ .

... .

.

-

.

3e3

.

.JUL 121989

Docket No. 50-309

Maine Yankee Atomic Power Company

ATTN: Mr. Charles D. Frizzle

President

83 Edison Drive

Augusta, Maine 04336

SUBJECT: REQUALIFICATION EXAMINATION REPORT NO. 50-309/89-05(OL)

Gentlemen:

On May 15 - 18, 1989, the NRC conducted requalification examinations to employ-

ees of your company who operate the Maine Yankee Atomic Power Plant. The evalu-

ation was cenducted in accordance with Revision 5 to NUREG-1021, Operator

Licensing Examiner Standards, ES-601, Administration of NRC Requalification

Program Evaluations. The evaluation had two purposes: (1) to evaluate indivi-

dual operator competency and (2) to evaluate the effectiveness of the licensed

operator requalification training program at Maine Yankee. At the conclusion

of the examination, any generic findings that evolved as a result of the exami-

nation were discussed with those members of your staff identified in the

enclosed report.

As a result of this evaluation, your requalification program has been assigned

an overall program rating of satisfactory in accordance with the criteria of

b,UREG 1021, ES-601. All operators ' passed the written, walk-through and simu-

Tator portions of the examination based on both your staff's and the NRC grad-

Ing of the examination.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosure will be placed in the NRC Public Document Room.

Should you have any questions regarding this examination, plec a contact Mr.

P. Eselgroth, Chief, PWR Section, at 215/337-5211.

Sincerely,

Original Signed B !

! bd

obert M. Ga lo, Chief Q/

Operations Branch

Division of Reactor Safety

Enclosure: Requalification Examination Report No. 50-309/89-05(0L)

w/ Attachments 1, 2, 3, and 4

89072 g y hO 9

[

yi

_ _ _

"

, . Power Company

.

.

l- cc w/ enclosure and attachments 1, 2, 3, and 4:

E. Thomas Bouletto, VP Operations / Plant Manager

A. R. Sheon, Plant Training Manager

C. Holden, Senior Resident Inspector

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of Maine

bcc w/ enclosure without attachments 1, 2, 3, and 4:

DRP Section Chief

Examiner

Chief, OLB DLPQE, NRR

Contract Examiner Supervisor

Region I Docket Room (w/ concurrences)

OL File

Master Exam File (with all attachments)

i

l

4

RI:D /h RI: if RI:DRS

J.P R.(Eaon R. Gall  !

6/l/89 6/f/89 //[89

0FFICIAL RECORD COPY MYEXMREP - 0002.0.0

05/31/89

1'

.___,_.m _.______.m. - - - - - - - - - - - - -