.JUL 121989
Docket No. 50-309
Maine Yankee Atomic Power Company
ATTN: Mr. Charles D. Frizzle
President
83 Edison Drive
Augusta, Maine 04336
SUBJECT: REQUALIFICATION EXAMINATION REPORT NO. 50-309/89-05(OL)
Gentlemen:
On May 15 - 18, 1989, the NRC conducted requalification examinations to employ-
ees of your company who operate the Maine Yankee Atomic Power Plant.
The evalu-
ation was cenducted in accordance with Revision 5 to NUREG-1021, Operator
Licensing Examiner Standards, ES-601, Administration of NRC Requalification
Program Evaluations. The evaluation had two purposes:
(1) to evaluate indivi-
dual operator competency and (2) to evaluate the effectiveness of the licensed
operator requalification training program at Maine Yankee. At the conclusion
of the examination, any generic findings that evolved as a result of the exami-
nation were discussed with those members of your staff identified in the
enclosed report.
As a result of this evaluation, your requalification program has been assigned
an overall program rating of satisfactory in accordance with the criteria of
b,UREG 1021, ES-601. All operators ' passed the written, walk-through and simu-
Tator portions of the examination based on both your staff's and the NRC grad-
Ing of the examination.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosure will be placed in the NRC Public Document Room.
Should you have any questions regarding this examination, plec a contact Mr.
P. Eselgroth, Chief, PWR Section, at 215/337-5211.
Sincerely,
Original Signed B !
!
bd
Q/
obert M. Ga lo, Chief
Operations Branch
Division of Reactor Safety
Enclosure: Requalification Examination Report No. 50-309/89-05(0L)
w/ Attachments 1, 2, 3, and 4
89072 g y hO
9
[
yi
_ _ _
"
- Maine Yankee Atomic
2
, . Power Company
.
.
l-
cc w/ enclosure and attachments 1, 2, 3, and 4:
E. Thomas Bouletto, VP Operations / Plant Manager
A. R. Sheon, Plant Training Manager
C. Holden, Senior Resident Inspector
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
State of Maine
bcc w/ enclosure without attachments 1, 2, 3, and 4:
DRP Section Chief
Examiner
Chief, OLB DLPQE, NRR
Contract Examiner Supervisor
Region I Docket Room (w/ concurrences)
OL File
Master Exam File (with all attachments)
i
l
4
RI:D
/h
RI: if
RI:DRS
R.(Eaon
!
J.P
R. Gall
6/l/89
6/f/89
//[89
0FFICIAL RECORD COPY
MYEXMREP - 0002.0.0
05/31/89
1'
.___,_.m
_.______.m.
- - - - - -
- - - - - -
-