OCT 0 91990 -
-
Docket / License: 50-309/DPR-36
j
Maine Yankee Atomic Power Company
ATTN: Mr. C. D. Frizzle
l
President
!
83 Edison Drive
Augusta, Maine 04336
i
,
Gentlemen:
Subject: NRC Inspection Report No. 50-309/90-17
l
This transmits the July 31 through September 18,1990 routine inspection findings of Messrs.
!
C. Marschall, P. Sena and R. Freudenberger at the Maine Yankee Atomic Power Plant,
[
Wiscasset, Maine. Those findings were based'on observations of activities, interviews, and
'
document reviews, and have been discussed with Mr. Blackmore of your staff.
P
Overall, this inspection found that the plant was operated safely. In addition, we noted that your
_
presentation at the September 17, 1990 management meeting demonstrated an ability to be
,
constructively self-critical.
i
!
Although two violations of regulatory requirements were identified (leak testing and independent
..
verification of a switch position), a Notice of Violation was not issued in either case wcause the
l
criteria of Section V.G. of the Enforcement Policy were met.
.
Thank you for your cooperation,
f
1
Sincerely,
1
l
ORIGINAL. SIGNED BY:
'
JON R. JOHNSON
i
,
Jon R. Johnson, Chief -
Projects Branch No. 3 -
Division of Reactor Projects
-
i
Enclosure: NRC Region I Inspection Report 50-309/9017
,
.
j
_.
cryicm anconr, con
(
$85*I88E88$886
py
-
. - . , _
_-
-_
. _ - _ _ _ _ _ _ _ .
_ _ _ __ - - -
.- _ _ - - _ _ _ _ _ - _ _ _ _
.
<.
,
'
.
OCT C 31530
.
Maine Yankee Atomic Power
2
Company
cc w/ encl:
E. T. Boulette, Vice President, Operations
l
R. W. Blackmore, Plant Manager
,
l
G. D. Whittier, Licensing Manager
'
'
l
P. L. Anderson, Project Manager, (Yankee Atomic Electric Company)
'
J. A. Ritsher, Attorney (Ropes and Gray)
Maine Yankee Hearing Service List
Public Docun.ent Room (PDR)
Local Public Drument Room (LPDR)
,
Nuclear Safety 1.tformation Center (NSIC)
NRC Resident Inspector
,
State of Maine (2)
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl.)
DRP Section Chief
E. Trottier, LPM, NRR
E. Conner, DRP
'
K. Abraham, PAO (2)
C. Anderson, DRS (See Detail 1)
j
H. Gray, DRS (See Details 3,7)
bec w/ overview only:
C. Hehl, DRP
W. Hodges, DRS
J. Wiggins, DRP
J. Joyner, DRSS
J. Durr, DRS
,
RI:DRP
RI:DRP
RI:DRP
RI:DRP
P%
Sok
(S k
-
Freudenberger/meo Marschall
hFedabe
ansol
$6
10/3/90
l0 $
l
OFFICIAL RECORD COPY
.;
a:my9017.meo
. _ _ .
.
_
_
. _ _
_ _ _ .
--
-
-
-- - _ _ .
.
- - - _ _ _ _ _ _ _ _ - _ _ _ _ _ .
..
,
,,
.
'.
MAINE YANKEE HEARING SERVICE LIST
-
Mr. Charles B. Brinkman
Mr. G. D. Whittier, Manager
Manager, Washington Nuclear Operations
Nuclear Engineering and Licensing
Combustion Engineering, Inc.
Maine Yankee Atomic Power Company
12300 Twinbrook Parkway, Suite 330
83 Edison Drive
Rockville, Maryland 20852
Augusta, Maine 04336
John A. Ritsher, Esq.
State Planning Officer
Ropes & Gray
Executive Department
225 Franklin Street
189 State Street
Boston, Massachusetts 02110
Augusta, Maine 04330
Dr. E. T. Boulette, Vice President
Mr. Robert W. Blackmore
Operations
Plant Manager
Maine Yankee Atomic Power Company
Maine Yankee Atomic Power Company
P. O. Box 408
P. O. Box 408
Wiseasset, Maine 04578
Wiscasset, Maine 04578
.
First Selectman of Wiscasset
Mr. P. L. Anderson, Project Manager
Municipal Building
Yankee Atomic Electric Company
U.S. Route 1
580 Main Street
Wiscasset, Maine 04578
Bolton, Massachusetts 01740-1398
Resident Inspector
Regional Administrator, Region I
Maine Yankee Atomic Power Station
U.S. Nuclear Regulatory Commission -
U.S. Nuclear Regulatory Commission
475 Allendale Road
P. O. Box E
King of Prussia, Pennsylvania 19406
>
Wiscasset, Maine 04578
l
,,
_
_ _ _ _
,
_
.
.
. .
.
.
___
-
. _ _ .
. -
i
i
t,
i
MAINE YANKEE HEARING SERVICE LIST
-
-
,
Mr. Charles B. Brinkman
Mr. G. D. Whittier, Manager
Manager, Washington Nuclear Operations
Nuclear Engineering and Licensing
Combustion Engineering, Inc.
Maine Yankee Atomic Power Company
12300 Twinbrook Parkway, Suite 330
83 Edison Drive
l
Rockville, Maryland 20852
Augusta, Maine 04336
John A. Ritsher, Esq.
State Planning Officer
Ropes & Gray
Executive Department
225 Franklin Street
189 State Street
'
Boston, Massachusetts 02110
Augusta, Maine 04330
Dr. E. T. Boulette, Vice President
Mr. Robert W. Blackmore
Operations
Plant Manager
,
Maine Yankee Atomic Power Company
Maine Yankee Atomic Power Company -
P. O. Box 408
P. O. Box 408
Wiscasset, Maine 04578
Wiscasset, Maine 04578
i
First Selectman of Wiscasset
Mr. P. L. Anderson, Project Manager
Municipal Building
Yankee Atomic Electric Company
U.S. Route 1
580 Main Street
Wiscasset, Maine 04578
Bolton, Massachusetts - 01740-1398
Resident Inspector
Regional Administrator, Region I
Maine Yankee Atomic Power Station
U.S. Nuclear Regulatory Commission
l-
U.S. Nuclear Regulatory Commission
475 Allendale Road
,
P. O. Box E
King of Prussia, Pennsylvania 194 %
Wiscasset, Maine 04578
,
.
.
l
-w'ee-
--
---ww
,,
- - -