Category:INSPECTION REPORT
MONTHYEARIR 05000413/20240102025-02-14014 February 2025 Fire Protection Team Inspection Report 05000413-2024010 and 05000414-2024010 IR 05000413/20250102025-01-14014 January 2025 Notification of Catawba Nuclear Station Units 1 & 2 Comprehensive Engineering Team Inspection (CETI) U.S. Nuclear Regulatory Commission Inspection Report 05000413, 414/2025010 IR 05000413/20244032024-12-0909 December 2024 Cyber Security Inspection Report 05000413/2024403 and 05000414/2024403 IR 05000413/20244012024-11-27027 November 2024 Security Baseline Inspection Report 05000413/2024401, 05000414/2024401 IR 05000414/20240922024-11-20020 November 2024 NRC Inspection Report 05000414/2024092 IR 05000413/20243012024-11-14014 November 2024 NRC Operator License Examination Report 05000413/2024301 and 05000414/2024301 IR 05000413/20240032024-11-0404 November 2024 Integrated Inspection Report 05000413/2024003 and 05000414/2024003 IR 05000413/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000413/2024011 and 05000414/2024011 IR 05000414/20240912024-09-0505 September 2024 Final Significance Determination of a White Finding and Nov and Assessment Followup Letter-NRC Inspection Report 05000414-2024091 IR 05000413/20240052024-08-26026 August 2024 Updated Inspection Plan for Catawba Nuclear Station (Report 05000413/2024005 & 05000414/2024005) IR 05000413/20240022024-08-0808 August 2024 Integrated Inspection Report 05000413-2024002 and 05000414-2024002 and Apparent Violation IR 05000414/20240902024-06-24024 June 2024 NRC Inspection Report 05000414/2024090 and Preliminary White Finding and Apparent Violation IR 05000413/20240012024-05-10010 May 2024 Integrated Inspection Report 05000413/2024001 and 05000414/2024001 and Apparent Violation ML24095A1072024-04-0808 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report (C1R27) IR 05000413/20230062024-02-28028 February 2024 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 - (NRC Inspection Report 05000413/2023006 and 05000414/2023006) IR 05000413/20230042024-02-0202 February 2024 – Integrated Inspection Report 05000413-2023004 and 05000414-2023004 RA-23-0288, End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report2023-11-16016 November 2023 End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report IR 05000413/20230102023-10-11011 October 2023 NRC Inspection Report 05000413/2023010 and 05000414/2023010 IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) IR 05000413/20230022023-07-25025 July 2023 Integrated Inspection Report 05000413/2023002 and 05000414/2023002 IR 05000413/20230012023-05-0505 May 2023 – Integrated Inspection Report 05000413/2023001 and 05000414/2023001 IR 05000413/20230112023-04-25025 April 2023 Focused Engineering Inspection Report 05000413/2023011 and 05000414/2023011 IR 05000413/20234012023-03-0101 March 2023 – Security Baseline Inspection Report 05000413 2023401 and 05000414 2023401 IR 05000413/20220062023-03-0101 March 2023 Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000413/2022006 and 05000414/2022006) IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 IR 05000413/20220042023-01-31031 January 2023 Integrated Inspection Report 05000413/2022004 and 05000414/2022004 IR 05000413/20220112022-12-15015 December 2022 Biennial Problem Identification and Resolution Inspection Report 05000413/2022011 and 05000414/2022011 IR 05000413/20224032022-11-17017 November 2022 Cyber Security Inspection Report 05000413/2022403 and 05000414/2022403 (Public) IR 05000414/20220032022-10-31031 October 2022 Integrated Inspection Report 05000414/2022003 and 05000414/2022003 IR 05000413/20224022022-10-28028 October 2022 – Security Baseline Inspection Report 05000413 2022402 and 05000414 2022402 IR 05000413/20220052022-08-26026 August 2022 Updated Inspection Plan for Catawba Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000413/2022005 and 05000414/2022005 IR 05000413/20220022022-07-29029 July 2022 Integrated Inspection Report 05000413/2022002 and 05000414/2022002 IR 07200045/20220012022-07-26026 July 2022 Operation of an Independent Spent Fuel Storage Installation Report 07200045/2022001 IR 05000413/20220102022-07-21021 July 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000413/2022010 and 05000414/2022010 IR 05000414/20220012022-04-28028 April 2022 Integrated Inspection Report 05000413/ 2022001 and 05000414/2022001 RA-22-0080, Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System2022-04-0707 April 2022 Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System IR 05000413/20224202022-04-0707 April 2022 Security Inspection Report 05000413/2022420 and 05000414/2022420 IR 05000413/20210062022-03-0202 March 2022 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2021006 and 05000414/2021006) IR 05000413/20224012022-02-18018 February 2022 Security Baseline Inspection Report 05000413/2022401 and 05000414/2022401 IR 05000413/20210042022-01-26026 January 2022 Integrated Inspection Report 05000413/2021004 and 05000414/2021004 ML22011A1802022-01-18018 January 2022 Review of the Spring 2021 Steam Generator Tube Inspection Report IR 05000413/20213012021-11-0808 November 2021 Operator Licensing Examination Report 05000413/2021301 and 05000414/2021301 IR 05000413/20214022021-11-0303 November 2021 Security Baseline Inspection Report 05000413/2021402 and 05000414/2021402 IR 05000413/20210032021-10-28028 October 2021 Integrated Inspection Report 05000413/2021003 and 05000414/2021003 IR 05000413/20214042021-08-26026 August 2021 Material Control and Accounting Program Inspection Report 05000413/2021404 and 05000414/2021404 (OUO Removed) IR 05000413/20210022021-08-0505 August 2021 Integrated Inspection Report 05000413/2021002 and 05000414/2021002 IR 05000413/20210012021-04-29029 April 2021 Integrated Inspection Report 05000413/2021001 and 05000414/2021001 IR 05000413/20210112021-04-23023 April 2021 NRC Fire Protection Team Inspection Report 05000413/2021011 and 05000414/2021011 IR 05000413/20210102021-04-23023 April 2021 Notification of Catawba Nuclear Station, Units 1 & 2 Design Bases Assurance Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000413/2021010 and 05000414/2021010 IR 05000413/20200062021-03-0303 March 2021 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 - NRC Inspection Report 05000413/2020006 and 05000414/2020006 2025-02-14
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support IR 05000413/19980131998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown IR 05000269/19980141998-09-22022 September 1998 Insp Repts 50-269/98-14,50-270/98-14,50-287/98-14, 50-369/98-14,50-370/98-14,50-413/98-14 & 50-414/98-14 on 980824-28.No Violations Noted.Major Areas Inspected:Plant Support.Specific Area Includes Access Authorization Program IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000413/19980011998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant IR 05000413/19970151998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000413/19970141997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents IR 05000413/19970091997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000413/19970081997-07-0707 July 1997 Insp Repts 50-413/97-08 & 50-414/97-08 on 970427-0607. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148F9441997-05-23023 May 1997 Insp Repts 50-413/97-07 & 50-414/97-07 on 970323-0426. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970051997-04-21021 April 1997 Integrated Insp Repts 50-413/97-05 & 50-414/97-05 on 970216- 0322.No Violations Identified.Major Areas Inspected:Maint, Operations,Engineering & Plant Support IR 05000413/19970061997-04-0404 April 1997 Insp Repts 50-413/97-06 & 50-414/97-06 on 970317-20.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities,Plant Support & Status of Security Facilities & Equipment ML20140B7631997-03-17017 March 1997 Insp Repts 50-413/97-03 & 50-414/97-03 on 970112-0215. Violations Noted.Major Areas Inspected:Licensee Operation, Maint,Engineering & Plant Support IR 05000413/19960191997-02-21021 February 1997 Insp Repts 50-413/96-19 & 50-414/96-19 on 961007, 961127, & 970206.Violation Noted.Major Areas inspected:in-office Review of Licensee Describing Changes to CNS UFSAR Re Lack of Circuit Breaker Coordination for 600-Vac IR 05000413/19960201997-02-10010 February 1997 Insp Repts 50-413/96-20 & 50-414/96-20 on 961201-970111.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970041997-01-31031 January 1997 Insp Repts 50-413/97-04 & 50-414/97-04 on 970106-23.No Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000413/19970021997-01-31031 January 1997 Insp Repts 50-413/97-02 & 50-414/97-02 on 970106-10.No Violations Noted.Major Areas Inspected:Plant Support IR 05000413/19960181996-12-30030 December 1996 Insp Repts 50-413/96-18 & 50-414/96-18 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20135C2601996-11-15015 November 1996 Insp Repts 50-413/96-16 & 50-414/96-16 on 960908-1019.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19960151996-11-0707 November 1996 Insp Repts 50-413/96-15 & 50-414/96-15 on 960901-1012.No Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000413/19960171996-11-0101 November 1996 Insp Repts 50-413/96-17 & 50-414/96-17 on 960930-1004.No Violations Noted.Major Areas Inspected:Plant Support ML20128R0951996-10-0707 October 1996 Insp Repts 50-413/96-13 & 50-414/96-13 on 960728-0907. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20128J0391996-09-30030 September 1996 Insp Repts 50-413/96-12 & 50-414/96-12 on 960804-31. Violations Noted.Major Areas Inspected:Engineering, Summary of Plant Status & Observations & Findings ML15118A0541995-12-22022 December 1995 Insp Repts 50-269/95-24,50-413/95-23,50-414/95-23, 50-369/95-26,50-370/95-26,50-270/95-24 & 50-287/95-24 on 951113-17.Violations Noted.Major Areas Inspected:Licensee Access Authorization Program IR 05000413/19940141994-06-0303 June 1994 Insp Repts 50-413/94-14 & 50-414/94-14 on 940509-20.No Violations Noted.Major Areas Inspected:Isi & Flow Assisted Corrosion IR 05000413/19940081994-04-15015 April 1994 Insp Repts 50-413/94-08 & 50-414/94-08 on 940228-0303.No Violations Noted.Major Areas Inspected:Licensee Emergency Response Program,Implementation of Emergency Plan & Procedures & Training Program for Emergency Response IR 05000413/19930321993-12-30030 December 1993 Insp Repts 50-413/93-32 & 50-414/93-32 on 931117-19 & 1129-1203.Violations Noted.Major Areas Inspected:Observation of Eddy Current (ET) Exam of SG Tubes,Inservice Activities Including Surface & Volumetric Exams,Review of Radiographs IR 05000413/19930331993-12-23023 December 1993 Insp Repts 50-413/93-33 & 50-414/93-33 on 931129-1203.No Violations Noted.Major Areas Inspected:Isi of Pipe Supports & Snubbers & TS Surveillance of Snubbers IR 05000413/19930311993-12-22022 December 1993 Insp Repts 50-413/93-31 & 50-414/93-31 on 931107-1204.No Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering,Plant Support & follow-up of Previously Identifed Items IR 05000413/19930291993-12-12012 December 1993 Insp Repts 50-413/93-29 & 50-414/93-29 on 931115-19.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Organization & Mgt Controls,Training & Qualification,Audits & Appraisals IR 05000413/19930281993-12-10010 December 1993 Insp Repts 50-413/93-28 & 50-414/93-28 on 931101-05.No Violations Noted.Deviation Noted.Major Areas Inspected: Adequacy of Licensee Programs,Procedures & Supporting Documentation for Implementation of Station Blackout Rule 1999-09-24
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000413/20240102025-02-14014 February 2025 Fire Protection Team Inspection Report 05000413-2024010 and 05000414-2024010 IR 05000413/20250102025-01-14014 January 2025 Notification of Catawba Nuclear Station Units 1 & 2 Comprehensive Engineering Team Inspection (CETI) U.S. Nuclear Regulatory Commission Inspection Report 05000413, 414/2025010 IR 05000413/20244032024-12-0909 December 2024 Cyber Security Inspection Report 05000413/2024403 and 05000414/2024403 IR 05000413/20244012024-11-27027 November 2024 Security Baseline Inspection Report 05000413/2024401, 05000414/2024401 IR 05000414/20240922024-11-20020 November 2024 NRC Inspection Report 05000414/2024092 IR 05000413/20243012024-11-14014 November 2024 NRC Operator License Examination Report 05000413/2024301 and 05000414/2024301 IR 05000413/20240032024-11-0404 November 2024 Integrated Inspection Report 05000413/2024003 and 05000414/2024003 IR 05000413/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000413/2024011 and 05000414/2024011 IR 05000414/20240912024-09-0505 September 2024 Final Significance Determination of a White Finding and Nov and Assessment Followup Letter-NRC Inspection Report 05000414-2024091 IR 05000413/20240052024-08-26026 August 2024 Updated Inspection Plan for Catawba Nuclear Station (Report 05000413/2024005 & 05000414/2024005) IR 05000413/20240022024-08-0808 August 2024 Integrated Inspection Report 05000413-2024002 and 05000414-2024002 and Apparent Violation IR 05000414/20240902024-06-24024 June 2024 NRC Inspection Report 05000414/2024090 and Preliminary White Finding and Apparent Violation IR 05000413/20240012024-05-10010 May 2024 Integrated Inspection Report 05000413/2024001 and 05000414/2024001 and Apparent Violation ML24095A1072024-04-0808 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report (C1R27) IR 05000413/20230062024-02-28028 February 2024 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 - (NRC Inspection Report 05000413/2023006 and 05000414/2023006) IR 05000413/20230042024-02-0202 February 2024 – Integrated Inspection Report 05000413-2023004 and 05000414-2023004 RA-23-0288, End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report2023-11-16016 November 2023 End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report IR 05000413/20230102023-10-11011 October 2023 NRC Inspection Report 05000413/2023010 and 05000414/2023010 IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) IR 05000413/20230022023-07-25025 July 2023 Integrated Inspection Report 05000413/2023002 and 05000414/2023002 IR 05000413/20230012023-05-0505 May 2023 – Integrated Inspection Report 05000413/2023001 and 05000414/2023001 IR 05000413/20230112023-04-25025 April 2023 Focused Engineering Inspection Report 05000413/2023011 and 05000414/2023011 IR 05000413/20234012023-03-0101 March 2023 – Security Baseline Inspection Report 05000413 2023401 and 05000414 2023401 IR 05000413/20220062023-03-0101 March 2023 Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000413/2022006 and 05000414/2022006) IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 IR 05000413/20220042023-01-31031 January 2023 Integrated Inspection Report 05000413/2022004 and 05000414/2022004 IR 05000413/20220112022-12-15015 December 2022 Biennial Problem Identification and Resolution Inspection Report 05000413/2022011 and 05000414/2022011 IR 05000413/20224032022-11-17017 November 2022 Cyber Security Inspection Report 05000413/2022403 and 05000414/2022403 (Public) IR 05000414/20220032022-10-31031 October 2022 Integrated Inspection Report 05000414/2022003 and 05000414/2022003 IR 05000413/20224022022-10-28028 October 2022 – Security Baseline Inspection Report 05000413 2022402 and 05000414 2022402 IR 05000413/20220052022-08-26026 August 2022 Updated Inspection Plan for Catawba Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000413/2022005 and 05000414/2022005 IR 05000413/20220022022-07-29029 July 2022 Integrated Inspection Report 05000413/2022002 and 05000414/2022002 IR 07200045/20220012022-07-26026 July 2022 Operation of an Independent Spent Fuel Storage Installation Report 07200045/2022001 IR 05000413/20220102022-07-21021 July 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000413/2022010 and 05000414/2022010 IR 05000414/20220012022-04-28028 April 2022 Integrated Inspection Report 05000413/ 2022001 and 05000414/2022001 RA-22-0080, Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System2022-04-0707 April 2022 Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System IR 05000413/20224202022-04-0707 April 2022 Security Inspection Report 05000413/2022420 and 05000414/2022420 IR 05000413/20210062022-03-0202 March 2022 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2021006 and 05000414/2021006) IR 05000413/20224012022-02-18018 February 2022 Security Baseline Inspection Report 05000413/2022401 and 05000414/2022401 IR 05000413/20210042022-01-26026 January 2022 Integrated Inspection Report 05000413/2021004 and 05000414/2021004 ML22011A1802022-01-18018 January 2022 Review of the Spring 2021 Steam Generator Tube Inspection Report IR 05000413/20213012021-11-0808 November 2021 Operator Licensing Examination Report 05000413/2021301 and 05000414/2021301 IR 05000413/20214022021-11-0303 November 2021 Security Baseline Inspection Report 05000413/2021402 and 05000414/2021402 IR 05000413/20210032021-10-28028 October 2021 Integrated Inspection Report 05000413/2021003 and 05000414/2021003 IR 05000413/20214042021-08-26026 August 2021 Material Control and Accounting Program Inspection Report 05000413/2021404 and 05000414/2021404 (OUO Removed) IR 05000413/20210022021-08-0505 August 2021 Integrated Inspection Report 05000413/2021002 and 05000414/2021002 IR 05000413/20210012021-04-29029 April 2021 Integrated Inspection Report 05000413/2021001 and 05000414/2021001 IR 05000413/20210112021-04-23023 April 2021 NRC Fire Protection Team Inspection Report 05000413/2021011 and 05000414/2021011 IR 05000413/20210102021-04-23023 April 2021 Notification of Catawba Nuclear Station, Units 1 & 2 Design Bases Assurance Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000413/2021010 and 05000414/2021010 IR 05000413/20200062021-03-0303 March 2021 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 - NRC Inspection Report 05000413/2020006 and 05000414/2020006 2025-02-14
[Table view] Category:UTILITY
MONTHYEARIR 05000413/19900281990-10-26026 October 1990 Insp Repts 50-413/90-28 & 50-414/90-28 on 901001-04. Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors W/Emphasis on Compensatory Measures & Records & Repts IR 05000413/19900251990-10-11011 October 1990 Insp Rept 50-413/90-25 & 50-414/90-25 on 900924-28.No Violations Noted.Major Areas inspected:post-refueling Startup Tests for Both Units & Core Performance Surveillance Performed on Unit 2 IR 05000413/19900231990-09-10010 September 1990 Insp Repts 50-413/90-23 & 50-414/90-23 on 900730-0803.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program in Areas of Internal & External Exposure & Contamination Control & ALARA IR 05000413/19900191990-08-30030 August 1990 Insp Repts 50-413/90-19 & 50-414/90-19 on 900624-0802. Violations Noted.Major Areas Inspected:Plant Operations, Refueling Activities,Surveillance/Maint Observations,Review of LERs & Followup of Previously Identified Items IR 05000413/19900201990-08-28028 August 1990 Insp Repts 50-413/90-20 & 50-414/90-20 on 900724-26. Unresolved Item Identified.Major Areas Inspected: fitness-for-duty Program IR 05000413/19900221990-07-30030 July 1990 Insp Repts 50-413/90-22 & 50-414/90-22 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected:Records Review of Maint Activities Following 5-yr Insp of Emergency Diesel Generator 2A & Review of Test Procedures IR 05000413/19900151990-07-19019 July 1990 Insp Repts 50-413/90-15 & 50-414/90-15 on 900527-0623. Violation Noted.One Noncited Violation Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation & Maint Observation IR 05000413/19900211990-07-19019 July 1990 Insp Repts 50-413/90-21 & 50-414/90-21 on 900627-29.No Violations or Deviations Noted.Major Areas Inspected:Main Steam Safety Relief Valve Setpoint Testing & Maint & Repair of Coatings on Steel Containment Vessel IR 05000413/19900181990-07-11011 July 1990 Insp Repts 50-413/90-18 & 50-414/90-18 on 900625-29.No Violations Noted.Major Areas Inspected:Inservice Insp & Maint,Including Plan for Outage,Reviews of NDE Procedures & Independent Exam of Verifications IR 05000413/19900161990-07-0909 July 1990 Insp Repts 50-413/90-16 & 50-414/90-16 on 900611-15. Violations Noted But Not Cited.Major Areas Inspected: Conformance to Reg Guide 1.97 & Instrumentation for Light water-cooled Nuclear Power Plants During Accidents IR 05000413/19900171990-06-27027 June 1990 Insp Repts 50-413/90-17 & 50-414/90-17 on 900611-19. Violation Re Operator Failure to Follow Procedures Noted. Major Areas Inspected:Event Involving Operator Failure to Follow Procedures During Transfer of Reactor Coolant Water IR 05000413/19900111990-06-22022 June 1990 Insp Repts 50-413/90-11 & 50-414/90-11 on 900415-0526. Violations Noted.Major Areas Inspected:Plant Operations, Lers,Followup on Previously Identified Items & Surveillance & Maint Observation IR 05000413/19900131990-06-21021 June 1990 Insp Rept 50-413/90-13 & 50-414/90-13 on 900604-08.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000413/19900121990-06-18018 June 1990 Insp Repts 50-413/90-12 & 50-414/90-12 on 900521-25.No Violations or Deviations Noted.Major Areas Inspected: Radiological Effluents,Environ Monitoring,Plant Chemistry & Previously Identified Items IR 05000413/19900141990-06-13013 June 1990 Partially Withheld Physical Security Insp Repts 50-413/90-14 & 50-414/90-14 on 900521-25 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected: Physical Barriers & Security Sys Power Supply IR 05000413/19902001990-06-0808 June 1990 Interfacing Sys LOCA Insp Repts 50-413/90-200 & 50-414/90-200 on 900416-27.No Deficiencies Identified.Major Areas Inspected:Data & Info on Plant Conditions,Design Features,Sys,Equipment & Procedures ML20034B0191990-04-13013 April 1990 Insp Repts 50-413/90-10 & 50-414/90-10 on 900322-26.No Violations Noted.Major Areas Inspected:Insp Charter Developed on 900321 & Available to Team IR 05000413/19900061990-03-29029 March 1990 Insp Repts 50-413/90-06 & 50-414/90-06 on 900128-0303. Violations & Deviations Noted.Major Areas Inspected:Plant & Refueling Operations,Surveillance/Maint Observation,Lers, self-assessment Capabilities & Testing Mods ML20033G9881990-03-28028 March 1990 Partially Withheld Insp Repts 50-413/90-08 & 50-414/90-08 on 900305-09 (Ref 10CFR2.790(d) & 73.21).Violation Noted: Failure to Provide Positive Access Control to Vital Area. Major Areas Inspected:Mgt Support & Security Program Plans ML20033F5801990-03-0707 March 1990 Insp Repts 50-413/90-02 & 50-414/90-02 on 900108-12 & 0206-09.Violations Noted.Major Areas Inspected:Radiation Protection Activities,Including Review of Licensee Organization & Mgt Controls IR 05000413/19900071990-03-0505 March 1990 Insp Repts 50-413/90-07 & 50-414/90-07 on 900212-16.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp (Isi),Including ISI Program Implementing Procedures & Unit 1 ISI Plan for Outage IR 05000413/19900031990-03-0202 March 1990 Insp Repts 50-413/90-03 & 50-414/90-03 on 891231-900127. Violations Noted.Major Areas Inspected:Routine Resident Insp of Review of Plant Operations,Surveillance & Maint Observation & Review of LERs IR 05000413/19900041990-02-16016 February 1990 Insp Repts 50-413/90-04 & 50-414/90-04 on 900122-26.No Violations Noted.Major Areas Inspected:Operational Readiness of Site Emergency Preparedness Program,Including Review of Organization & Mgt Control,Training,Equipment & Facilities IR 05000413/19900011990-02-0505 February 1990 Insp Repts 50-413/90-01 & 50-414/90-01 on 900108-11. Violations or Deviations Noted.Major Areas Inspected: Followup to Operational Safety Team Insp IR 05000413/19900051990-02-0202 February 1990 Insp Repts 50-413/90-05 & 50-414/90-05 on 900103-23. Violation Noted.Major Areas Inspected:Event Re Open Circuit Breaker for Containment Air Return Fan Motor Which Rendered Fan Inoperable IR 05000413/19890361990-01-26026 January 1990 Insp Repts 50-413/89-36 & 50-414/89-36 on 891203-30.No Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation,Review of LERs & fitness-for-duty Program Training Implementation IR 05000413/19890351989-12-13013 December 1989 Insp Repts 50-413/89-35 & 50-414/89-35 on 891204-08.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp Program & Implementing Procedures & Review of Inservice Insp Plan for Unit 1 Future Outage IR 05000413/19890311989-11-24024 November 1989 Insp Repts 50-413/89-31 & 50-414/89-31 on 891007-28. Violations Noted But Not Cited.Major Areas Inspected:Plant Operations,Surveillance Observation,Maint Observation & Review of LERs IR 05000413/19890331989-11-21021 November 1989 Insp Repts 50-413/89-33 & 50-414/89-33 on 891030-1103.No Violations or Deviations Noted.Major Areas Inspected: Containment Local Leak Rate Testing,Verification of Containment Integrity & Action on Previous Insp Findings IR 05000413/19890301989-11-0707 November 1989 Insp Repts 50-413/89-30 & 50-414/89-30 on 891002-06. Violations Noted.Major Areas Inspected:Design,Design Changes,Plant Mod & Licensee Action on Previously Identified Insp Findings IR 05000413/19890291989-11-0303 November 1989 Resident Insp Repts 50-413/89-29 & 50-414/89-29 on 890903-1006.Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation, Calibr & Review of Licensee Nonroutine Event Rept IR 05000413/19890271989-10-26026 October 1989 Insp Repts 50-413/89-27 & 50-414/89-27 on 890918-22.No Violations or Deviations Noted.Major Areas Inspected: Inservice Testing & Followup on Outstanding Items IR 05000413/19890281989-10-10010 October 1989 Partially Withheld Insp Repts 50-413/89-28 & 50-414/89-28 on 890911-15 (Ref 10CFR2.790(d) & 73.21)Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Audits, Detection & Assessment Aids & Testing & Maint IR 05000413/19890211989-10-0303 October 1989 Insp Repts 50-413/89-21 & 50-414/89-21 on 890702-0902. Noncited Violations Noted.Major Areas Inspected:Plant Operations,Surveillance Observation & Procedures,Maint Observation & Review of Onsite Events IR 05000413/19890261989-09-20020 September 1989 Insp Repts 50-413/89-26 & 50-414/89-26 on 890821-24.No Violations or Deviations Noted.One Unresolved Item Identified.Major Areas Inspected:Organization & Mgt Controls & Maintaining Radiation Exposures ALARA IR 05000413/19890241989-09-0707 September 1989 Insp Repts 50-413/89-24 & 50-414/89-24 on 890807-11.No Violations Noted.Major Areas Inspected:Physical Security Program for Program Power Reactors IR 05000413/19890221989-08-22022 August 1989 Insp Repts 50-413/89-22 & 50-414/89-22 on 890723-28.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection & Followup on Previously Identified Insp Items IR 05000413/19890201989-08-11011 August 1989 Insp Repts 50-413/89-20 & 50-414/89-20 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected:Environ Qualification of Electrical Equipment,Generic Ltr 83-28 & NRC Bulletins 88-001 & 88-003 IR 05000413/19890181989-08-11011 August 1989 Insp Repts 50-413/89-18 & 50-414/89-18 on 890717-21. Violation Re Turbine Bldg Sump Analyses Noted But Not Cited. Major Areas Inspected:Chemistry,Liquid Waste Controls & Previously Identified Inspector Followup Items IR 05000413/19890231989-08-0303 August 1989 Partially Withheld Insp Repts 50-413/89-23 & 50-414/89-23 on 890728 (Ref 10CFR2.790 & 73.21)).Violations Noted.Major Area Inspected:Security Event Logs ML20247R7511989-07-24024 July 1989 Insp Repts 50-413/89-16 & 50-414/89-16 on 890528-0701.Two Violations & One Deviation Noted.Major Areas Inspected:Plant Operations,Surveillance Observation,Maint Observation, Licensee Nonroutine Event Repts & Part 21 Insps IR 05000413/19890171989-07-13013 July 1989 Partially Withheld Insp Repts 50-413/89-17 & 40-414/89-17 on 890605-09.Violations Noted Re Protected Area Access Controls & Visitor Controls.Major Areas Inspected:Mgt Support, Security Program Plans & Audits & Physical Barriers IR 05000413/19890191989-07-13013 July 1989 Insp Repts 50-413/89-19 & 50-414/89-19 on 890616-0628. Violations Noted.Major Areas inspected:890616 Event Re Channels of Reactor Vessel Level Instrumentation Sys Inoperable for Period of Time in Excess of Tech Specs ML20246P7321989-07-10010 July 1989 Insp Repts 50-413/89-09 & 50-414/89-09 on 890410-0505. Violations Noted.Major Areas Inspected:Various Plant Groups Including Operations,Maint,Qa,Engineering & Training in Support of Safe Plant Operations IR 05000413/19890151989-06-27027 June 1989 Insp Repts 50-413/89-15 & 50-414/89-15 on 890430-0527. Violation Noted Re Failure to Meet Overtime Restriction Requirements & Unlocked Valves.Major Areas Inspected:Plant Operations,Surveillance & Maint Observations & Plant Mods IR 05000413/19890131989-06-27027 June 1989 Insp Repts 50-413/89-13 & 50-414/89-13 on 890326-0429. Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Repts IR 05000413/19890121989-06-0606 June 1989 Corrected Page to Insp Repts 50-413/89-12 & 50-414/89-12. No Violations or Deviations Noted.Major Area Inspected: Annual Radiological Emergency Response Exercise on 890427 ML20245F3421989-05-23023 May 1989 Insp Repts 50-413/89-12 & 50-414/89-12 on 890425-28.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Radiological Emergency Response Exercise IR 05000413/19890111989-05-18018 May 1989 Insp Repts 50-413/89-11 & 50-414/89-11 on 890417-21.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Activities During Extended Outages & Control of Radioactive Matls & Surveys IR 05000413/19890101989-05-0202 May 1989 Insp Repts 50-413/89-10 & 50-414/89-10 on 890403-07 & 13. Violations Noted.Major Areas Inspected:Liquid & Gaseous Radwaste,Plant Chemistry,Environ Monitoring,Confirmatory Measurements & Followup on Previously Identified Items 1990-09-10
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000413/19993021999-10-12012 October 1999 NRC Operator Licensing Retake Exam Repts 50-413/99-302 & 50-414/99-302 (Including Completed & Graded Tests) for Tests Administered on 990921-23.Two Out of Three RO Candidates & One SRO Passed Retake Exam IR 05000413/19993011999-09-30030 September 1999 NRC Operator Licensing Exam Repts 50-413/99-301 & 50-414/99-301 (Including Completed & Graded Tests) for Tests Administered on 990524-27,0603,07-10 & 16.Eight of Fourteen Applicants Passed Exam IR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20210H2211999-07-22022 July 1999 Notice of Violation from Insp on 990314-0424.Violation Noted:Sss Was Not Inoperable for Thirteen Days Because Electrical Breakers Associated with SSS Motor Control Ctr Were Mispositioned ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support PNO-II-99-017, on 990515,indication of Main Generator Ground Fault Was Received While Performing Turbine Startup in Preparation for Placing Unit on Line.Licensee Is Conducting Investigation to Determine Actual Cause of Ground1999-05-18018 May 1999 PNO-II-99-017:on 990515,indication of Main Generator Ground Fault Was Received While Performing Turbine Startup in Preparation for Placing Unit on Line.Licensee Is Conducting Investigation to Determine Actual Cause of Ground ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations PNO-II-99-015, on 990503,shutdown in Excess of 72 H Occurred. Licensee Is Still Conducting Investigation Into Cause of Main Generator Protection Lockout & Making Preparations to Inspect & Remove Any Excessive Fouling from Inside Afws1999-05-0505 May 1999 PNO-II-99-015:on 990503,shutdown in Excess of 72 H Occurred. Licensee Is Still Conducting Investigation Into Cause of Main Generator Protection Lockout & Making Preparations to Inspect & Remove Any Excessive Fouling from Inside Afws IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20207A5881999-02-17017 February 1999 Notice of Violation from Insp on 981213-990123.Violation Noted:Licensee Made Change to Procedures as Described in Updated Final Safety Analysis Rept & Failed to Perform Written Safety Evaluation IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support IR 05000413/19980131998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown IR 05000269/19980141998-09-22022 September 1998 Insp Repts 50-269/98-14,50-270/98-14,50-287/98-14, 50-369/98-14,50-370/98-14,50-413/98-14 & 50-414/98-14 on 980824-28.No Violations Noted.Major Areas Inspected:Plant Support.Specific Area Includes Access Authorization Program ML20154C4301998-09-14014 September 1998 Notice of Violation from Insp on 980705-0815.Violation Noted:Licensee Failed to Establish Adequate Surveillance Procedures IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering PNO-II-98-037A, on 980807,update Shutdown in Excess of 72 H Made.Licensee Has Cleaned & Satisfactorily Inspected IC Flow Channels.Licensee Identified Discrepancies in Bolting of IC Intermediate Deck Door Frames & Hinges.Conditions Addressed1998-08-28028 August 1998 PNO-II-98-037A:on 980807,update Shutdown in Excess of 72 H Made.Licensee Has Cleaned & Satisfactorily Inspected IC Flow Channels.Licensee Identified Discrepancies in Bolting of IC Intermediate Deck Door Frames & Hinges.Conditions Addressed IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-II-98-037, on 980808,shutdown in Excess of 72 H Occurred. Licensee Inspected Approximately Half of Unit 2 Ice Condenser Bay Flow Channels from Intermediate Deck W/No Ice Obstructions in Excess of TS Limit Identified1998-08-10010 August 1998 PNO-II-98-037:on 980808,shutdown in Excess of 72 H Occurred. Licensee Inspected Approximately Half of Unit 2 Ice Condenser Bay Flow Channels from Intermediate Deck W/No Ice Obstructions in Excess of TS Limit Identified ML20236V7351998-07-27027 July 1998 Notice of Violation from Insp on 980524-0704.Violation Noted:Licensee Failed to Identify & Take Prompt C/A Following Unit 1 Upper Surge Tank over-temp Events on 960120,980111 & 0507 IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236J7471998-06-11011 June 1998 Notice of Violation from Insp on 980222-0411.Violation Noted:Adminstrative & Surveillance Procedures Not Implemented as Evidenced by Listed Examples IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 PNO-II-98-025, on 980507,AFW Sys Declared Inoperable.Licensee Isolated Valves 1CM-127 & 2CM-127 in Units 1 & 2, Respectively,To Prevent Recurrence Until Permanent Corrective Actions Can Be Developed1998-05-11011 May 1998 PNO-II-98-025:on 980507,AFW Sys Declared Inoperable.Licensee Isolated Valves 1CM-127 & 2CM-127 in Units 1 & 2, Respectively,To Prevent Recurrence Until Permanent Corrective Actions Can Be Developed IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5551998-03-23023 March 1998 Notice of Violation from Insp on 980111-0221.Violation Noted:Licensee Failed to Perform Written Safety Evaluation for Closing Valves 1CA-6 & 2CA-6 IR 05000413/19980011998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6251998-02-0909 February 1998 Notice of Violation from Insp on 971123-980110.Violation Noted:Changes to Radiological Conditions in 1B Residual Heat Removal Pump Room Not Logged to Reflect Changes in Dress Requirements IR 05000413/19970151998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20199L6301998-02-0202 February 1998 Notice of Violation from Insp & Exam on 971117-21 & 971201-19.Violation Noted:As of 971219,selected Officers from Site Security Force Had Not Been Retrained to Perform non-licensed Operator Emergency Tasks for Starting Ssf PNO-II-97-066, on 971230,RCS Leakage Requiring Forced Unit Cooldown Occurred.No Radioactive Release Outside of Reactor Containment Facilities Due to Leakage.Licensee Informed States on Nc & Sc1997-12-31031 December 1997 PNO-II-97-066:on 971230,RCS Leakage Requiring Forced Unit Cooldown Occurred.No Radioactive Release Outside of Reactor Containment Facilities Due to Leakage.Licensee Informed States on Nc & Sc PNO-II-97-064, on 971229,inadvertent Safety Injection Occurred Due to Operators Failing to Perform Step Which Resulted in Cold Leg Injection Valve Being Left Open. Licensee Engineers Performing Evaluation1997-12-29029 December 1997 PNO-II-97-064:on 971229,inadvertent Safety Injection Occurred Due to Operators Failing to Perform Step Which Resulted in Cold Leg Injection Valve Being Left Open. Licensee Engineers Performing Evaluation IR 05000413/19970141997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000414/19970081997-12-19019 December 1997 Notice of Deviation from Insp on 971012-1122.Deviation Noted:On 971020,licensee Had Not Performed Alarm Set Point Adjustment Evaluation Discussed in Violation 50-414/97-08-01 ML20197F2481997-12-19019 December 1997 Notice of Violation from Insp on 971012-1122.Violation Noted:Licensee Failed to Follow Radiation Protection Procedures in That,Current Radiation Dose Rates Were Not on Vacuum Cleaner Label as Required IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector ML20199G0351997-11-10010 November 1997 Notice of Violation from Insp on 970831-1011.Violations Noted:Licensee Failed to Follow Procedures for Security Badge Access Control as Evidenced.On 970909,security Failed to Destroy & Unassign Access Badge of Terminated Individual ML20211L3051997-09-26026 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:On 970727,technician Failed to Correctly Review Drawing Number CNEE-2792-01.02,connection Diagram,Main Steam Sys Terminal Cabinet 2SMTC1,rev 12 IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7111997-08-18018 August 1997 Notice of Violation from Insp on 970608-0719.Violation Noted:On 970424,operations Test Group Technician Failed to Open Valve 2NV-873 as Required by Step 2.2.3 of PT/2/A/4200/01C,resulting in Closed Test Vent Flowpath IR 05000413/19970091997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000413/19970081997-07-0707 July 1997 Insp Repts 50-413/97-08 & 50-414/97-08 on 970427-0607. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support 1999-09-30
[Table view] |
Inspection Report - Catawba - 1985030 |
---|
|
|
Text
_ _
.
0 Rio UNITED STATES
[5
'o WUCLEAR REGULATORY COMMISSION
'
y" REGION 11 g
y.
j 101 MARIETTA STREET.N.W.
t ATLANTA, GEORGI A 30323
-
%"
.....s
'+,
o
.
Report No.:
50-413/85-30 Licensee: Duke Power Company
,
!
422 South Church Street Charlotte, NC 28242 Docket No.:
50-413 License No. NPF-35 Facility Name: Catawba 1 Inspection Conducted: June 24 - 28, 1985 Inspector:
d,k 7 h & / <-C CWV pfeSidned Approved by: h8 7 8/85'
C. Upright, Secry6n Clykff D(te Tigned Division of Re dtor M ety i
SUMMARY Scope: This routine, unannounced inspection entailed 34 inspector-hours on site in the areas of design changes and tests and experiments.
Results: No violations or deviations were identified.
.
8508140265 850719 PDR ADOCK 05000413
.
G PDR i
I
,
_
.
'
.
REPORT DETAILS 1.
Persons Contacted Licensee Employees
- G. Barrett, Training Supervisor
- H. Barron, Superintendent of Operations
- W. Beaver, Performance Engineer
- M. Bolch, Station Emergency Planner
- W. Bradley, Quality Assurance
'.
L. Benjamin, Junior Engineer
- B. Caldwell, Station Service Superintendent
- J. Cox, Technical Services Superintendent T. Deven, IAE Supervisor D. Goolsby, Associate Engineer
- J. Hampton, Manager-CNS G. Helms, IAE Planner
- C. Kiker, Jr., OPS Training
<
- P. LeRoy, Licensing Engineer
- F. Mack, Jr., Project Services Engineer
J. Moran, Junior Engineer A. Pease, Designer
- D. Robinson, Reactor Engineer NRC Resident Inspectors
- P. Skinner, Senior Resident Inspector
- K. Van Doorn Senior Resident Inspector
,
- Attended exit interview 2.
Exit Interview The inspection scope and findings were summarized on June 28, 1985, with
!
those persons indicated in paragraph 1 above. The inspector described the areas inspected and discussed in detail the inspection findings listed below. The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspectors during this inspection.
Inspector Followup Item, Revision of Implementation Phase of the Design Change Program, paragraph 4.
3.
Licensee Action on Previous Enforcement Matters This subject was not addressed in the inspection.
.
.
.
.
.-,
--
-- -
.
..
-
.. -.
.
.
4.
Design Changes (35744)
References:
(a) 10 CFR 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plans and Fuel Reprocessing Plants, Criterion III (b) Regulatory Guide 1.64, Quality Assurance Requirements for the Design of Nuclear Power Plants, Revision 2 (c) ANSI N45.2.11-1974, Quality Assurance Requirements for the Design of Nuclear Power Plants (d) Regulatory Guide 1.33, Quality Assurance Requirements (Operations) November 1972 (e) ANSI N18.7-1976, Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants (f) 10 CFR 50.59, Changes, Tests and Experiments (g) Technical Specifications Section 6.5, Review and Audit The inspector reviewed the licensee design change program required by references (a) through (g) to verify that these activities were conducted in accordance with regulatory requirements, industry guides and standards, and Technical Specifications.
The following criteria were used during the review to assess the overall implementation of the established program:
-
Procedures have been established to control design changes which include assurance that a proposed change does not involve an unreviewed safety question or a change in technical specifications as required by 10 CFR 50.59.
Procedures and responsibilities for design control have been
-
established including responsibilities and methods for conducting safety evaluations.
-
Administrative controls for design document control have been established for the following:
Controlling changes to approved design change documents
'
Controlling or recalling obsolete design change documents such as revised drawings and modification procedures Release distribution of approved design change documents
_ _
.
._
.
.
.
-
Administrative controls and responsibilities have been established commensurate with the time frame for implementation to assure that design changes will be incorporated into:
!
Plant procedures Operator training programs Plant drawings to reflect implemented design changes and
modifications
-
Design controls require that implementation will be in accordance with approved procedures.
,
-
Design controls require assigning responsibility for identi fying post-modification testing requirements and acceptance criteria in approved test procedures and for evaluation of test results.
-
Procedures assign responsibility and delineate the method for reporting design changes to the NRC in accordance with 10 CFR 50.59.
-
Controls require review and approval of temporary modifications in accordance with Section 6 of the Technical Specifications and 10 CFR 50.59.
The documents listed below were reviewed to verify that these criteria had been incorporated into the licensee design program:
Duke Power Company Topical Report, Quality Assurance Program, Duke-1 Section 17.2.3, Revision 8 Nuclear Station Modification Manual Section 4.2, Design Engineering Designed Modifications, Revision 0
,
Section 4.3, Station Designed Modifications, Revision 0 Section 4.4, Exempt Changes, Revision 0 Section 7.0, Administration of Nuclear Station Modifications, Revision 0 Section 7.6, Design, Revision 0 Section 7.7, Drawing Control, Revision 0 Section 8.0, Administration of Major Construction Projects, Revision 0 Section 9.0, Administration of Exempt and Temporary Changes, Revision 0
-
,
_
.-.
--
.
.
...
._
.
.
Catawba Nuclear Station Directive 4.4.4, Processing Nuclear Station Modifications, Revision No. 4 Catawba Nuclear Station Directive 4.4.5, Temporary Station Modification Post-Licensing, Revision No. 3 QA-104, Definition and Application of the Quality Assurance Program, Revision 2 In October 1984 the nuclear station modification program was revised. This resulted in the preparation of a Nuclear Station Modification Manual which specifies appropriate requirements which shall be met to implement a modification at an operational nuclear station.
Specific types of modifications can be designed by the Nuclear Production Department following concurrence from Design Engineering. Nuclear Station Modification Manual Section 7.6, Design, delineates the administrative controls applicable to both Design Engineering Designed Modifications (DDMs) and Station Designed Modifications (SDMs). Additional requirements for the processing of Nuclear Station Modifications are delineated in Station Directive Section 4.4.4.
Nuclear safety evaluations are performed for DDMs and SDMs to assure that a proposed change does not involve an unreviewed safety question or a change in the Technical Specifications (TS) as required by 10 CFR 50.59.
Additionally, measures have been established to control temporary modifica-tions including the performance of a written safety evaluation for determination of an unreviewed safety question in accordance with 10 CFR 50.59. Station Directive (SD) 4.4.5, Revision 3, delineates the administra-tive controls applicable to the control of temporary modifications.
The review of station problem reports and the determination of the method of processing has been assigned to the Projects Engineer staff. Accountable engineers assigned responsibility for initiating and processing SDMs and DDMs are selected from this group. The inspector interviewed selected staff members to ascertain their understanding of the QA program classification requirements.
The accountable engineers were knowledgeable in the QA program classification requirements, in addition to the requirements of the revised design change program.
The following design change packages were examined to verify that selected elements of the revised design change program are being implemented as specified by procedures:
NSM No. CN-10176, Replace existing chromalox model AR-2525A thermostats with ASCO model SB10A/QJ11A1 with six feet capilliary and 3/8 inch bulb. Also existing 1/4 inch thermowell must be replaced with 3/8 inch thermowell, Revision 0 NSM No. CN-50052, Add jumper in 2CRA-C-1 control panel in order to bypass one of the compressor motor high temperature interlock, Revision 0
'
l
.
. - -
.
'
.
NSM No. CN-10262, Removal of power from "A" train solenoid for the Main Steam Isolation Valves and the Steam Generator PORVs and head vent valve INC2528 to prevent overcooling of system due to spurious valve opening due to fire, Revision 0 NSM No. CN-10123, NC System valve INC34A (PORV), Revise jumper terminal connection in input cabinet IIC10 and on connection diagram CN-1713-10.03 to agree with elementary diagram CNEE-0150-01.16. This change will allow subject valve to be closed manually, Revision 0 NSM No. CN-10173, (1) Install a new DC auxiliary relay for contact multiplication of barring device interlock pressure switch (PS32) and laterlock engine starting relays with auxiliary contacts. (2) Change input contact to generator " droop" mode relay from R3-8 to R9A-4.
(3) Add relay contact R4-5 to the engine starting timer initiation circuit, Revision 0.
NSM No. CN-10260, Roll wires connected to terminals 1 and 3 on TB856 in the A and B safeguard Test Cabinets, Revision 0 NSM No. CN-10455, Rewire conductor 98, 9W on cable 1EIA547 from switch SM168-1 and 2 to SM168-3 and 4 (Respectively).
This will allow channel 2 power to supply steam generator level control instead of channel 1 power, Revision 0 NSM No. CN-10502, Add one relay to 1EATC20. Have CAPT suction logic actuate relay in 1EATC20 which will in turn actuate IRN310B, Revision 0 NSM No. CN-10173, Relocate wiring in IDECPA and IDECPB as shown on the attached drawings, Revision 1 NSM No. CN-10419, Change contacts, 2, 2a on relays GB and DE from N.0.
'
to N.C. to give proper 1.47 indication, Revision 00 NSM No. CN-10335, Revise flow alarm defeat circuits to minimize false alarms and to avoid defeating valid flow alarms.
Flow alarms for the following monitors are affected: 1 EMF 44, IEMF45A and B,1 EMF 46A and B, EMF 47, EMF-49, EMF-50,1 EMF 52, Revision 00 NSM No. CN-10061, (1) Remove time delay on main feedwater pump high discharge pressure trip (2) Add controls to trip main feedwater pump on feedwater isolation signal, Revision 0
'
NSM No. CN-10039, Install a vent line from the 10 inch CA pump suction hotwell source supply line to the condenser. This new line will vent the CA suction line from the hotwell to remove air or vapor voids, Revision 0.
\\
--
,
_.. -
_
_
__
.
i
.
.
The inspector verified that the following requirements were incorporated in the documentation associated with each nuclear station modification package:
The design change request was reviewed and approved as required.
Design input requirements were specified, reviewed, and approved.
Independent design verifications were performed as required.
Post-modification acceptance tests were performed as required and designated acceptance criteria were met.
Any changes to the design documents were properly reviewed and approved.
Design reviews required by Technical Specifications were performed.
Plant drawings were updated to reflect the design change or modification.
Plant procedures have been updated to reflect the design changes.
The training organization was made aware of the modifications.
The following temporary station modification packages were reviewed by the inspector to verify conformance with written procedures:
Work Request No. 16744 OPS, Calibrate or repair PZR pressure master controller.
Adjust controller to maintain a more constant PZR/NC pressure, dated June 19, 1985.
Work Request No. 4457 IAE, Install TSM on N44 to reduce loss of detector voltage set point to 400 V DC.
Reference IP/0/A/3240/04C, Section 10.0, 10.1.9 and 10.1.13.22 through 10.1.13.27, dated June 23, 1985.
Work Request No. 0213 LAP, Fabricate and install cooling system for the BVLIS cabinets per the attached sketch, dated June 11, 1985.
The revision of licensee design change program as delineated in the Nuclear Station Modification Manual has enhanced the programmatic controls applic-able to the front end part of the design change program; i.e.,
the identification, review, and processing of station problem reports which may develop into a ODM or an SDM. The back end part of the process appears deficient in so for as verification activities for DDMs are concerned.
Section 7.8 of the Nuclear Station Modification Manual addresses require-ments for installation and return to service.
Paragraph 7.8.8.1 specifies prerequisites for return to service, among which are verification activities.
- _ _
___
_
,..
.
.
f
The inspector determined that the licensee has developed an " Implementation Plan" which will be incorporated into the design change program.
The accountable engineer has been assigred the responsibility for the develop-ment of the implementation plan for a specific modification. Among other features addressad by the Implementation Plan are testing and calibration requirements. The inspector was informed that the Nuclear Station Modifica-tion Manual is presently being revised to incorporate the requirements for
,
preparation of an Implementation Plan during the implementation of the design change program. Station Directive 4.4.4 will subsequently be revised to also include these requirements.
The inspector discussed with licensee management the implementation of the requirements for cross-disciplinary reviews required by the Technical Specifications.
Completion of cross-disciplinary reviews as documented on the existing form is not readily apparent.
Licensee management concurred with this observation and stated that the applicable form was being revised to more clearly show completion of this activity.
Within this area, one inspector followup item was identified. The licensee has developed on Implementation Plan which will be incorporated into the design change program. The Nuclear Station Modification Manual is presently
being revised to incorporate the requirements delineated in the Implementation Plan.
Station Directive 4.4.4 will also be revised to include the requirements of the Implementation Plan. Additionally, the form used to document TS required cross-disciplinary reviews of design changes is being revised to more clearly show completion of this activity.
Until the licensee has completed the revision to the above design change program documents, this is identified as Inspector Followup Item 413/85-30-01, Revision of Implementation Phase of Design Change Program.
5.
Tests and Experiments (35749)
References:
(a) Appendix B to 10 CFR 50 - Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants (b)
10 CFR 50.59 - Changes, Tests and Experiments (c) Duke Power Company Topical Report, Quality Assurance Program, Duke-1-A, Section 17.2.11, Revision 7 (d) Technical Specification, Section 6.5, Review and Audit (e) Regulatory Guide 1.33, Quality Assurance Requirements (Operations) November 1972 (f) ANSI N18.7-1976, Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants
!
. - -
___
.
.
_ _ _ -.
_
_
,_
.
.
The following licensee document was used to select completed test packages for review:
FSAR Chapter 14, Figure 14.2.11-1, Testing Following Initial Fuel Loading, Revision 11.
The inspector subsequently examined the test packages to verify that selected elements of the test and experiment program were being implemented in conformance with procedures.
The test packages examined are as listed below:
Test Number:
TP/1/A/2600/11, Pressurizer Pressure and Level Control System Test, Test dates:
2/4/85, 3/1/85, 3/2/85 Test Number:
TP/1/A/2150/01, Reactor Coolant Flow Test, Test dates:
11/21/84 through 12/4/84 Test Number:
TP/1/A/2150/13, Pressurizer Functional Test, Test dates:
11/22/84 through 11/24/84 The inspector also performed a detailed examination of the test package for the auxiliary feedwater system functional test to verify that earlier identified deficiencies were corrected.
The test procedure involved is listed below:
Test Number:
TP/1/A/1250/04, Auxiliary Feedwater System Functional Test, Test dates:
7/29/83 through 5/9/84.
The inspector verified that plant test activities documented by the above test packages were conducted in compliance with licensee established procedures. Additionally, the inspector verified that previously identified deficiencies in the auxiliary feedwater functional test documented in Inspection Report No. 50-413/84-05 and 50-414/85-04 were corrected.
Corrective actions were accomplished under design change NSM No. CN-10039 discussed in paragraph 4.
Retest activities were conducted under Work Request No. 0616NSM.
The inspector determined that the Auxiliary Feedwater pumps IA and IB developed head was not within the acceptable band at the minimum flow condition.
The test data was evalauted by Design Engineering and the pump performance was declared acceptable.
An amendment was issued to the facility operating license. This amendment changed the Technical Specifi-cations to modify the surveillance requ.irement acceptance criteria for the auxiliary feedwater pumps.
The following document was reviewed in connection with the amendment to the Catawba Nuclear Station Facility Operating License NPF-35:
Letter from Elinor G. Adensam, Chief Licensing Branch No. 4, Division of Licensing to Mr. H. B. Tucker, Vice President Nuclear Production Department, Subject:
Issuance of
-
.. -
.
-,,
-.,.
- - - -
-
,
,
. - - -
, -,
..
Amendment No. I to Facility Operating License NPF-24-Catawba Nuclear Station, Unit 1, dated September 24, 1984.
Within this area, no violations or deviations were identified.
.