IR 05000413/2021402

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000413/2021402 and 05000414/2021402
ML21308A172
Person / Time
Site: Catawba  
Issue date: 11/03/2021
From: Jannette Worosilo
NRC/RGN-II
To: Wylie E
Duke Energy Carolinas
References
IR 2021402
Download: ML21308A172 (8)


Text

November 3, 2021

SUBJECT:

CATAWBA NUCLEAR STATION - SECURITY BASELINE INSPECTION REPORT 05000413/2021402 AND 05000414/2021402

Dear Mr. Wylie:

On October 7, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Catawba Nuclear Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000413 and 05000414 License Nos. NPF-35 and NPF-52

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000413 and 05000414

License Numbers:

NPF-35 and NPF-52

Report Numbers:

05000413/2021402 and 05000414/2021402

Enterprise Identifier: I-2021-402-0019

Licensee:

Duke Energy Carolinas, LLC

Facility:

Catawba Nuclear Station

Location:

York, SC

Inspection Dates:

October 04, 2021 to October 07, 2021

Inspectors:

J. Brown, Senior Physical Security Inspector

A. Richardson, Physical Security Inspector

J. Tornow, Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Catawba Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)

  • Tier I: All Requirements
  • Tier II: 8 Requirements (02.06 a - d, 02.07 a, 02.08 a,b, e)
  • Tier III: 1 Requirement (02.09)

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:

Protective Strategy Evaluation (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: 14 Requirements (02.05 a, 02.06 a, d, f, g, h, i, j, m, n, 02.07 a, b, c, and e)
  • Tier III: 4 Requirements (02.08, 02.09 a, b and 02.11 a)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Sample)

(1) Since the last NRC inspection of this program area, Security Plan Revision 29 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2),that the change resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) Unit 1 (October 2020 through September 2021)

Unit 2 (October 2020 through September 2021)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 7, 2021, the inspectors presented the security baseline inspection results to Ernest Wylie and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

2346904

Prohibited Item Identified During Search

2354920

Operational Test Failure - Search Equipment

2358000

Security search equipment out of service

2373021

Contraband Item Found During Search Process

2373080

Lost badge outside PA

2373678

Contraband Item Found During Search Process

2376987

Unsecured CAD Door

2379958

Security CAD Door Locked in Alarm

2379984

Explosive Detector Taken Out of Service

2380630

Uncontrolled Badge Inside PA

2386106

Explosive Detector Taken Out of Service

2391417

Explosive Detector Taken Out of Service

Procedures

AD-SY-ALL-0110

Protection of Information Related to Nuclear Security

Revision 7

AD-SY-ALL-0210

Site Access Controls

Revision 6

AD-SY-ALL-0215

Security Search and Entry Processing

Revision 6

AD-SY-ALL-0220

Security Communications Program

Revision 3

AD-SY-ALL-0240

Security Key and Lock Controls

Revision 1

AD-SY-CNS-

0600

Testing and Inspection of CNS Security Equipment and

Barriers

Revision 0

71130.05

Corrective Action

Documents

2396647

Security Annual Graded Exercise 9/3/2021

Miscellaneous

LP-SY-ALL-0559

Controller Evaluator Training

09/19/2021

TG-SY-AV-0500

Composite Adversary Force Operations and Training Guide

Revision 03

Procedures

AD-SY-ALL-0560

Security Drill and Exercise Program

Revision 8

71130.09

Procedures

CNS Physical Security Plan (PSP)

Revision 29

AD-SY-ALL-0101

Security Plan Revision Process

Revision 2

71151

Corrective Action

Documents

2347235

Update information for IRIS for NRC Perf. Indicators