Security Baseline Inspection Report 05000413/2021402 and 05000414/2021402
ML21308A172
Person / Time
Site: Catawba  Duke energy icon.png
Issue date: 11/03/2021
From: Jannette Worosilo
NRC/RGN-II
To: Wylie E
Duke Energy Carolinas
References
IR 2021402
Download: ML21308A172 (8)


Text

November 3, 2021

SUBJECT:

CATAWBA NUCLEAR STATION - SECURITY BASELINE INSPECTION REPORT 05000413/2021402 AND 05000414/2021402

Dear Mr. Wylie:

On October 7, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Catawba Nuclear Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000413 and 05000414 License Nos. NPF-35 and NPF-52

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000413 and 05000414 License Numbers: NPF-35 and NPF-52 Report Numbers: 05000413/2021402 and 05000414/2021402 Enterprise Identifier: I-2021-402-0019 Licensee: Duke Energy Carolinas, LLC Facility: Catawba Nuclear Station Location: York, SC Inspection Dates: October 04, 2021 to October 07, 2021 Inspectors: J. Brown, Senior Physical Security Inspector A. Richardson, Physical Security Inspector J. Tornow, Physical Security Inspector Approved By: Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Catawba Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1)

  • Tier I: All Requirements
  • Tier II: 8 Requirements (02.06 a - d, 02.07 a, 02.08 a,b, e)
  • Tier III: 1 Requirement (02.09)

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following

procedure elements: Protective Strategy Evaluation

(1)

  • Tier I: All Requirements
  • Tier II: 14 Requirements (02.05 a, 02.06 a, d, f, g, h, i, j, m, n, 02.07 a, b, c, and e)
  • Tier III: 4 Requirements (02.08, 02.09 a, b and 02.11 a)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

procedure elements: Review Security Plan Changes (IP Section 02.01)

(1) Since the last NRC inspection of this program area, Security Plan Revision 29 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2),that the change resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) Unit 1 (October 2020 through September 2021)

Unit 2 (October 2020 through September 2021)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 7, 2021, the inspectors presented the security baseline inspection results to Ernest Wylie and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71130.02 Corrective Action 02346904 Prohibited Item Identified During Search

Documents 02354920 Operational Test Failure - Search Equipment

2358000 Security search equipment out of service

2373021 Contraband Item Found During Search Process

2373080 Lost badge outside PA

2373678 Contraband Item Found During Search Process

2376987 Unsecured CAD Door

2379958 Security CAD Door Locked in Alarm

2379984 Explosive Detector Taken Out of Service

2380630 Uncontrolled Badge Inside PA

2386106 Explosive Detector Taken Out of Service

2391417 Explosive Detector Taken Out of Service

Procedures AD-SY-ALL-0110 Protection of Information Related to Nuclear Security Revision 7

AD-SY-ALL-0210 Site Access Controls Revision 6

AD-SY-ALL-0215 Security Search and Entry Processing Revision 6

AD-SY-ALL-0220 Security Communications Program Revision 3

AD-SY-ALL-0240 Security Key and Lock Controls Revision 1

AD-SY-CNS- Testing and Inspection of CNS Security Equipment and Revision 0

0600 Barriers

71130.05 Corrective Action 02396647 Security Annual Graded Exercise 9/3/2021

Documents

Miscellaneous LP-SY-ALL-0559 Controller Evaluator Training 09/19/2021

TG-SY-AV-0500 Composite Adversary Force Operations and Training Guide Revision 03

Procedures AD-SY-ALL-0560 Security Drill and Exercise Program Revision 8

71130.09 Procedures CNS Physical Security Plan (PSP) Revision 29

AD-SY-ALL-0101 Security Plan Revision Process Revision 2

71151 Corrective Action 02347235 Update information for IRIS for NRC Perf. Indicators